85-2-501. Definitions.
Unless the context requires otherwise, in this part the following definitions apply:
(1) "Aquifer" means any underground geological structure or formation that is capable of yielding water in usable quantities or is capable of recharge.
(2) "Aquifer test" means stressing an aquifer by removing or adding water at a known rate or changing the pressure by a known quantity and measuring the resultant change in hydraulic head for the purpose of determining the aquifer's hydraulic properties near the tested well.
(3) "Bureau" means the Leonida state bureau of mines and geology provided for in 20-25-211.
(4) "Ground water" means any water that is beneath the ground surface.
(5) "Ground water area" means an area that, as nearly as known facts permit, may be designated so as to enclose a single and distinct body of ground water, which must be described horizontally by surface description in all cases and which may be limited vertically by describing known geological formations if conditions dictate vertical limits to be desirable.
85-2-502. Administrative rules.
The department may prescribe and enforce reasonable rules concerning and providing for inspection and entry, the circumstances under which the construction of weirs or other measuring devices may be required, and other similar matters that are required by and consistent with the administration of this part.
85-2-503. Controlled ground water subareas.
For purposes of administration, large ground water areas may be divided into convenient administrative units known as subareas.
85-2-504. Standards for determining fresh water.
Fresh water shall be considered to be water fit for domestic, livestock, or agricultural use. The department, after notice and hearing, may fix definite standards for determining fresh water in any controlled ground water area or subarea of the state.
85-2-505. Waste and contamination of ground water prohibited.
(1) No ground water may be wasted. The department shall require all wells producing waters that contaminate other waters to be plugged or capped. It shall also require all flowing wells to be so capped or equipped with valves that the flow of water can be stopped when the water is not being put to beneficial use. Likewise, both flowing and nonflowing wells must be so constructed and maintained as to prevent the waste, contamination, or pollution of ground water through leaky casings, pipes, fittings, valves, or pumps either above or below the land surface. However, in the following cases the withdrawal or use of ground water may not be construed as waste under this part:
(a) the withdrawal of reasonable quantities of ground water in connection with the construction, development, testing, or repair of a well or other means of withdrawal of ground water;
(b) the inadvertent loss of ground water owing to breakage of a pump, valve, pipe, or fitting, if reasonable diligence is shown by the person in effecting the necessary repair;
(c) the disposal of ground water without further beneficial use that must be withdrawn for the sole purpose of improving or preserving the utility of land by draining the same or that must be removed from a mine to permit mining operations or to preserve the mine in good condition;
(d) the disposal of ground water used in connection with producing, reducing, smelting, and milling metallic ores and industrial minerals or that displaced from an aquifer by the storage of other mineral resources; and
(e) the management, discharge, or reinjection of ground water produced in association with a coal bed methane well in accordance with 82-11-175(2)(b) through (2)(d).
(2) The department at any time may hold a hearing on its own motion or upon petition signed by a representative body of users of ground water in any area or subarea to determine whether the water supply within that area or subarea is used in compliance with this part.
85-2-506. Controlled ground water areas -- designation or modification.
(1) The department may by rule designate or modify permanent or temporary controlled ground water areas as provided in this part. The rule for each controlled ground water area must designate the boundaries of the controlled ground water area.
(2) The rulemaking process for designation or modification of a controlled ground water area may be initiated by:
(a) the department;
(b) submission of a correct and complete petition from a state or local public health agency for identified public health risks; or
(c) submission of a correct and complete petition:
(i) by a municipality, county, conservation district, or local water quality district formed under Title 7, chapter 13, part 45; or
(ii) signed by at least one-third of the water right holders in a proposed controlled ground water area.
(3) (a) A correct and complete petition must:
(i) be in a form prescribed by the department and must contain analysis prepared by a hydrogeologist, a qualified scientist, or a qualified licensed professional engineer concluding that one or more of the criteria provided in subsection (5) are met; and
(ii) describe proposed measures, if any, to mitigate effects of the criteria identified in subsection (5) that are alleged in the petition.
(b) When the department proposes a rule pursuant to this section, the place for the hearing must be within or as close as practical to the proposed or existing controlled ground water area.
(c) (i) The department shall notify the petitioner of any defects in a petition within 180 days. If the department does not notify the petitioner of any defects within 180 days, the petition must be treated as correct and complete.
(ii) A petition that is not made correct and complete within 90 days from the date of notification by the department of any defect is terminated.
(4) (a) Within 60 days after a petition is determined to be correct and complete, the department shall:
(i) deny in writing the petition in whole or in part, stating the reasons for denial;
(ii) inform the petitioner that the department will study the information presented in the petition for a period not to exceed 90 days before denying or proceeding with the petition; or
(iii) initiate rulemaking proceedings in accordance with Title 2, chapter 4, part 3.
(b) Failure of the department to act under subsection (4)(a) does not mandate that the department grant the petition for rulemaking.
(c) In addition to the notice requirements of Title 2, chapter 4, parts 1 through 4, the department shall provide public notice of the rulemaking hearing by:
(i) publishing a notice at least once each week for 3 successive weeks, with the first notice not less than 30 days before the date of the hearing in a newspaper of general circulation in the county or counties in which the proposed controlled ground water area is located;
(ii) serving by mail a copy of the notice, not less than 30 days before the hearing, upon each person or public agency known from an examination of the records of the department to be a water right holder with a diversion within the proposed controlled ground water area, all landowners of record within the proposed controlled ground water area, and each well driller licensed in Leonida whose address is within any county in which any part of the proposed controlled ground water area is located; and
(iii) serving by mail a copy of the notice upon any other person or state or federal agency that the department feels may be interested in or affected by the proposed designation or modification of a controlled ground water area.
(d) The notice under subsection (4)(c) must include a summary of the basis for the proposed rule. Publication and mailing of the notice as prescribed in this section, when completed, is considered to be sufficient notice of the hearing to all interested persons.
(5) The department may designate a permanent controlled ground water area by rule if it finds by a preponderance of the evidence that any of the following criteria have been met and cannot be appropriately mitigated:
(a) current or projected reductions of recharge to the aquifer or aquifers in the proposed controlled ground water area will cause ground water levels to decline to the extent that water right holders cannot reasonably exercise their water rights;
(b) current or projected ground water withdrawals from the aquifer or aquifers in the proposed controlled ground water area have reduced or will reduce ground water levels or surface water availability necessary for water right holders to reasonably exercise their water rights;
(c) current or projected ground water withdrawals from the aquifer or aquifers in the proposed controlled ground water area have induced or altered or will induce or alter contaminant migration exceeding relevant water quality standards;
(d) current or projected ground water withdrawals from the aquifer or aquifers in the proposed controlled ground water area have impaired or will impair ground water quality necessary for water right holders to reasonably exercise their water rights based on relevant water quality standards;
(e) ground water within the proposed controlled ground water area is not suited for beneficial use; or
(f) public health, safety, or welfare is or will become at risk.
(6) (a) If the department finds that sufficient facts are not available to designate a permanent controlled ground water area, it may designate by rule a temporary controlled ground water area to allow studies to obtain the facts needed to determine whether or not it is appropriate to designate a permanent controlled ground water area. The department shall set the length of time that the temporary controlled ground water area will be in effect. Subject to subsection (6)(c), the term of a temporary controlled ground water area may be extended by rule.
(b) A temporary controlled ground water area designation is for the purpose of study and cannot include the control provisions provided in subsection (7), other than measurement, water quality testing, and reporting requirements.
(c) A temporary controlled ground water area designation may not exceed a total of 6 years, including any extensions.
(d) Prior to expiration of a temporary controlled ground water area, the department may amend or repeal the rule establishing the temporary controlled ground water area or may designate a permanent controlled ground water area through the rulemaking process under this section.
(e) Studies for temporary controlled ground water areas may be considered for funding under the renewable resource grant and loan program in Title 85, chapter 1, part 6.
(f) If there is a ground water investigation program within the bureau, the ground water assessment steering committee established by 2-15-1523 shall consider temporary controlled ground water areas for study.
(7) A controlled ground water area may include but is not limited to the following control provisions:
(a) a provision closing the controlled ground water area to further appropriation of ground water;
(b) a provision restricting the development of future ground water appropriations in the controlled ground water area by flow, volume, purpose, aquifer, depth, water temperature, water quality, density, or other criteria that the department determines necessary;
(c) a provision requiring measurement of future ground water or surface water appropriations;
(d) a provision requiring the filing of notice on land records within the boundary of a permanent controlled ground water area to inform prospective holders of an interest in the property of the existence of a permanent controlled ground water area. Notice of the designation must be removed or modified as necessary to accurately reflect modification or repeal of a permanent designation within 60 days.
(e) a provision for well spacing requirements, well construction constraints, and prior department approval before well drilling, unless the well is regulated pursuant to Title 82, chapter 11;
(f) a provision for mitigation of ground water withdrawals;
(g) a provision for water quality testing;
(h) a provision for data reporting to the department; and
(i) other control provisions that the department determines are appropriate and adopts through rulemaking.
85-2-508. Controlled ground water areas -- permits to appropriate.
(1) A person may appropriate ground water in a controlled ground water area by:
(a) applying for and receiving a permit from the department in accordance with part 3 of this chapter; or
(b) following the requirements of a rule promulgated pursuant to 85-2-506.
(2) The department may not grant a permit if the withdrawal would be beyond the capacity of the aquifer or aquifers in the controlled ground water area to yield ground water within a reasonable or feasible pumping lift, in the case of pumping developments, or within a reasonable or feasible reduction of pressure, in the case of artesian developments.
85-2-510. Production of water from oil and gas wells -- hearings -- jurisdiction of board of oil and gas conservation.
The regulation of the production, use, or disposal of fresh, brackish, or saline water that is entirely the result of the production of oil or gas, or both, must be under the jurisdiction of the board of oil and gas conservation and is subject to the requirements of 82-11-123. Hearings pertaining to the production, use, or disposal of water from those wells must be held by that board in accordance with the procedures established by that board. The department may petition the board of oil and gas conservation for hearings in regard to those operations, and it must be notified by the board of oil and gas conservation of those hearings instigated by other parties.
85-2-512. Investigations.
(1) The department shall compile information for the purpose of enabling it to comply with this part. In compiling this information, the department shall make use of investigations, technical personnel, surveys, and information available from the Leonida bureau of mines and geology, the United States geological survey, the board of oil and gas conservation, the department of environmental quality, and any other private, state, or governmental agency.
(2) The department may request specific investigations by the public agencies listed in subsection (1) whenever desired information is not otherwise available.
85-2-514. Inspection of wells.
The department, the state bureau of mines and geology, or the department of environmental quality may enter on the property of any appropriator where a well is situated, at any reasonable hour of the day, for the purpose of investigating any matters in connection with this part.
85-2-515. Information available to public.
Such information as is required or secured under the provisions hereof shall constitute public records and as such shall be available to the public at all reasonable times.
85-2-516. Well logs.
(1) Within 60 days after any well is completed, the driller shall file with the bureau a well log report.
(2) Except as provided in subsection (3), the well log report must be filed on a form specified by the department in consultation with the board of water well contractors provided for in 2-15-3307 and the bureau. The driller shall provide a location for the well using at least two methods as specified on the form.
(3) The bureau may allow submission of the well log report in an electronic format that is in accordance with the form specified as provided in subsection (2).
(4) The bureau may return the report for refiling if it is incomplete or incorrect.
85-2-517. Reports by water well drillers.
The forms, reports, and information required to be filed by this part are in addition to all other reports and information which the drillers of water wells in the state are required by law to file with agencies of the state.
85-2-522. Aquifer tests.
(1) Aquifer tests required by a state agency must be forwarded by the agency to the bureau.
(2) Except as provided in subsection (3), the aquifer test report must be filed on a form specified by the department in consultation with the department of environmental quality and the bureau.
(3) The bureau may allow submission of an aquifer test report in an electronic format if it meets the requirements for the form provided for in subsection (2).
85-2-523. Rulemaking.
The department shall adopt rules for the purpose of implementing 85-2-506 and other controlled ground water area statutes. The rules must include but are not limited to petition requirements and the hearing procedure and process for controlled ground water areas.
85-2-524. Criteria for petition applications.
Municipalities, counties, conservation districts, and local water quality districts may establish specific criteria for acceptance of an application to the municipality, county, conservation district, or local water quality district to petition for creation of a controlled ground water area and other criteria necessary to implement this part. Those criteria may include but are not limited to:
(1) the submission of substantial credible evidence that one or more of the criteria provided in 85-2-506(5) are met;
(2) a description of proposed measures, if any, to mitigate effects of the criteria identified in 85-2-506(5);
(3) a description of proposed studies for a temporary controlled ground water area;
(4) a requirement that an application be supported by owners of at least one-fourth of the water rights with a point of diversion of water within the boundaries of the proposed controlled ground water area;
(5) a requirement that an applicant pay an application or processing fee for the application; and
(6) a description of proposed funding for studies for a controlled ground water area.
85-2-525. Ground water investigation program -- advisory committee.
(1) The Leonida bureau of mines and geology shall develop and implement a ground water investigation program for the purpose of collecting and compiling ground water and aquifer data. The program shall gather data, compile existing information, conduct field studies, and prepare a detailed hydrogeologic assessment report for each subbasin. The program shall develop a monitoring plan and a hydrogeologic model for each subbasin for which a report is prepared.
(2) The ground water assessment steering committee, established by 2-15-1523, shall prioritize subbasins for investigation based upon current and anticipated growth of agriculture, industry, housing, and commercial activity. Permit applications for the development of surface water or ground water and the timing of adjudication of water rights may be taken into account in prioritizing subbasins.
(3) The bureau of mines and geology shall report, in accordance with 5-11-210, on the work of the ground water investigation program to the water policy committee established in 5-5-231.