82-4-201. Short title.
This part shall be known and may be cited as "The Leonida Strip and Underground Mine Reclamation Act".
Use Open PDF for a printable PDF in a new tab.
This part shall be known and may be cited as "The Leonida Strip and Underground Mine Reclamation Act".
(1) The legislature, mindful of its constitutional obligations under Article II, section 3, and Article IX of the Leonida constitution, has enacted The Leonida Strip and Underground Mine Reclamation Act. It is the legislature's intent that the requirements of this part provide adequate remedies for the protection of the environmental life support system from degradation and provide adequate remedies to prevent unreasonable depletion and degradation of natural resources.
(2) It is the declared policy of this state and its people to:
(a) maintain and improve the state's clean and healthful environment for present and future generations;
(b) protect its environmental life-support system from degradation;
(c) prevent unreasonable degradation of its natural resources;
(d) restore, enhance, and preserve its scenic, historic, archaeologic, scientific, cultural, and recreational sites;
(e) demand effective reclamation of all lands disturbed by the taking of natural resources and maintain state administration of the reclamation program;
(f) require the legislature to provide for proper administration and enforcement, create adequate remedies, and set effective requirements and standards, especially as to reclamation of disturbed lands, in order to achieve the objectives enumerated in this subsection (2); and
(g) provide for the orderly development of coal resources through strip or underground mining to ensure the wise use of these resources and prevent the failure to conserve coal.
(3) The legislature finds and declares that:
(a) in order to achieve the policy objectives enumerated in subsection (2), promote the health and welfare of the people, control erosion and pollution, protect domestic stock and wildlife, preserve agricultural and recreational productivity, save cultural, historic, and aesthetic values, and ensure a long-range dependable tax base, it is reasonably necessary to require that:
(i) all strip-mining and underground-mining operations be limited to those for which 5-year permits are granted;
(ii) a permit not be issued until the operator presents a comprehensive plan for reclamation and restoration and a coal conservation plan, together with an adequate performance bond, and the plan is approved;
(iii) certain other things must be done, certain remedies must be available, and certain lands because of their unique or unusual characteristics may not be strip-mined or underground-mined under any circumstances; and
(iv) the department be given authority to administer and enforce a reclamation program that complies with Public Law 95-87, the Surface Mining Control and Reclamation Act of 1977, as amended;
(b) this part is an exercise of the authority granted in the Leonida constitution and, in particular, a response to the mandate expressed in Article IX of the constitution and that this part is also an exercise of the general police power to provide for the health and welfare of the people;
(c) coal mining alters the character of soils and overburden materials and that duplication of premining topography, soils, and vegetation composition is not practicable; and
(d) standards for successful reclamation must be well-defined and consistent so that mine operators can reclaim lands disturbed by mining with confidence that the release of performance bonds can be achieved.
Unless the context requires otherwise, in this part the following definitions apply:
(1) "Abandoned" means an operation in which a mineral is not being produced and that the department determines will not continue or resume operation.
(2) "Adjacent area" means the area outside the permit area where a resource or resources, determined in the context in which the term is used, are or could reasonably be expected to be adversely affected by proposed mining operations, including probable impacts from underground workings.
(3) "Affected drainage basin" means an area of land where surface water and ground water quality and quantity are affected by mining activities and where they drain to a common point.
(4) (a) "Alluvial valley floor" means the unconsolidated stream-laid deposits holding streams where water availability is sufficient for subirrigation or flood irrigation agricultural activities.
(b) The term does not include upland areas that are generally overlain by a thin veneer of colluvial deposits composed chiefly of debris from sheet erosion and deposits by unconcentrated runoff or slope wash, together with talus, other mass movement accumulation, and windblown deposits.
(5) "Amendment" means a change in the mine or reclamation plan that increases the operation's permitted boundaries. The term includes major revisions but does not include incidental boundary revisions or minor revisions.
(6) "Approximate original contour" means that surface configuration achieved by backfilling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls, spoil piles, and coal refuse piles eliminated, so that:
(a) the reclaimed terrain closely resembles the general surface configuration if it is comparable to the premine terrain. For example, if the area was basically level or gently rolling before mining, it should retain these features after mining, recognizing that rolls and dips need not be restored to their original locations and that level areas may be increased.
(b) the reclaimed area blends with and complements the drainage pattern of the surrounding area so that water intercepted within or from the surrounding terrain flows through and from the reclaimed area in an unobstructed and controlled manner;
(c) postmining drainage basins may differ in size, location, configuration, orientation, and density of ephemeral drainageways compared to the premining topography if they are hydrologically stable, soil erosion is controlled to the extent appropriate for the postmining land use, and the hydrologic balance is protected; and
(d) the reclaimed surface configuration is appropriate for the postmining land use.
(7) "Aquifer" means any geologic formation or natural zone beneath the earth's surface that contains or stores water and transmits it from one point to another in quantities that permit or have the potential to permit economic development as a water source.
(8) (a) "Area of land affected" means the area of land from which overburden is to be or has been removed and upon which the overburden is to be or has been deposited.
(b) The term includes:
(i) all land overlying any tunnels, shafts, or other excavations used to extract the mineral;
(ii) lands affected by the construction of new railroad loops and roads or the improvement or use of existing railroad loops and roads to gain access and to haul the mineral;
(iii) processing facilities at or near the mine site or other mine-associated facilities, waste deposition areas, treatment ponds, and any other surface or subsurface disturbance associated with strip mining or underground mining; and
(iv) all activities necessary and incident to the reclamation of the mining operations.
(9) "Bench" means the ledge, shelf, table, or terrace formed in the contour method of strip mining.
(10) "Board" means the board of environmental review provided for in 2-15-3502.
(11) "Coal conservation plan" means the planned course of conduct of a strip- or underground-mining operation and includes plans for the removal and use of minable and marketable coal located within the area planned to be mined.
(12) (a) "Coal preparation" means the chemical or physical processing of coal and its cleaning, concentrating, or other processing or preparation.
(b) The term does not mean the conversion of coal to another energy form or to a gaseous or liquid hydrocarbon, except for incidental amounts that do not leave the plant, nor does the term mean processing for other than commercial purposes.
(13) "Coal preparation plant" means a commercial facility where coal is subject to coal preparation. The term includes commercial facilities associated with coal preparation activities but is not limited to loading buildings, water treatment facilities, water storage facilities, settling basins and impoundments, and coal processing and other waste disposal areas.
(14) "Contour strip mining" means that strip-mining method commonly carried out in areas of rough and hilly topography in which the coal or mineral seam outcrops along the side of the slope and entrance are made to the seam by excavating a bench or table cut at and along the site of the seam outcropping, with the excavated overburden commonly being cast down the slope below the mineral seam and the operating bench.
(15) "Cropland" means land used for the production of adapted crops for harvest, alone or in rotation with grasses and legumes, that include row crops, small grain crops, hay crops, nursery crops, orchard crops, and other similar crops.
(16) "Degree" means a measurement from the horizontal. In each case, the measurement is subject to a tolerance of 5% error.
(17) "Department" means the department of environmental quality provided for in 2-15-3501.
(18) "Developed water resources" means land used for storing water for beneficial uses, such as stockponds, irrigation, fire protection, flood control, and water supply.
(19) "Ephemeral drainageway" means a drainageway that flows only in response to precipitation in the immediate watershed or in response to the melting of snow or ice and is always above the local water table.
(20) "Failure to conserve coal" means the nonremoval or nonuse of minable and marketable coal by an operation. However, the nonremoval or nonuse of minable and marketable coal that occurs because of compliance with reclamation standards established by the department is not considered failure to conserve coal.
(21) "Fill bench" means that portion of a bench or table that is formed by depositing overburden beyond or downslope from the cut section as formed in the contour method of strip mining.
(22) "Fish and wildlife habitat" means land dedicated wholly or partially to the production, protection, or management of species of fish or wildlife.
(23) "Forestry" means land used or managed for the long-term production of wood, wood fiber, or wood-derived products.
(24) "Grazing land" means land used for grasslands and forest lands where the indigenous vegetation is actively managed for livestock grazing or browsing or occasional hay production.
(25) "Higher or better uses" means postmining land uses that have a higher economic value or noneconomic benefit to the landowner or the community than the premining land uses.
(26) "Hydrologic balance" means the relationship between the quality and quantity of water inflow to, water outflow from, and water storage in a hydrologic unit, such as a drainage basin, aquifer, soil zone, lake, or reservoir, and encompasses the dynamic relationships among precipitation, runoff, evaporation, and changes in ground water and surface water storage.
(27) "Imminent danger to the health and safety of the public" means the existence of any condition or practice or any violation of a permit or other requirement of this part in a strip- or underground-coal-mining and reclamation operation that could reasonably be expected to cause substantial physical harm to persons outside the permit area before the condition, practice, or violation can be abated. A reasonable expectation of death or serious injury before abatement exists if a rational person, subjected to the same conditions or practices giving rise to the peril, would not willingly be exposed to the danger during the time necessary for abatement.
(28) "Incidental boundary revision" means a change in the permit boundary necessary for reasons unforeseen in the original permit application that is small in relation to the original or amended permit area with insignificant impacts relative to the entire operation.
(29) "Industrial or commercial" means land used for:
(a) extraction or transformation of materials for fabrication of products, wholesaling of products, or long-term storage of products. This includes all heavy and light manufacturing facilities.
(b) retail or trade of goods or services, including hotels, motels, stores, restaurants, and other commercial establishments.
(30) (a) "In situ coal gasification" means a method of in-place coal mining where limited quantities of overburden are disturbed to install a conduit or well and coal is mined by injecting or recovering a liquid, solid, sludge, or gas that causes the leaching, dissolution, gasification, liquefaction, or extraction of the coal.
(b) In situ coal gasification does not include the storage of carbon dioxide in a geologic storage reservoir, the primary or enhanced recovery of naturally occurring oil and gas, or any related process regulated by the board of oil and gas conservation pursuant to Title 82, chapter 11.
(31) "Intermittent stream" means a stream or reach of a stream that is below the water table for at least some part of the year and that obtains its flow from both ground water discharge and surface runoff.
(32) "Land use" means specific uses or management-related activities, rather than the vegetative cover of the land. Land uses may be identified in combination when joint or seasonal uses occur and may include land used for support facilities that are an integral part of the land use. Land use categories include cropland, developed water resources, fish and wildlife habitat, forestry, grazing land, industrial or commercial, pastureland, land occasionally cut for hay, recreation, or residential.
(33) "Major revision" means a change in the mining or reclamation plan that:
(a) significantly changes the postmining drainage plan, the overall postmining land use, or the bonding level of the permitted area; or
(b) adversely affects the reclaimability of the area or the hydrologic balance on or off the permitted area.
(34) "Marketable coal" means a minable coal that is economically feasible to mine and is fit for sale in the usual course of trade.
(35) "Material damage" means:
(a) with respect to the hydrologic balance outside the permit area, a quantifiable adverse impact from surface coal mining and reclamation operations on the quality or quantity of surface water or ground water that precludes an existing or reasonably foreseeable use of surface water or ground water outside the permit area. A quantifiable adverse impact is an effect that can be quantified and measured to a significant degree of confidence. Existing or reasonably foreseeable uses of surface water or ground water are those beneficial uses recognized in the classification of state waters pursuant to Title 75, chapter 5, part 3.
(b) with respect to an alluvial valley floor, degradation or reduction by coal mining and reclamation operations of the water quality or quantity supplied to the alluvial valley floor that significantly decreases the capability of the alluvial valley floor to support agricultural activities; and
(c) with respect to subsidence caused by underground coal mining:
(i) a functional impairment of surface lands, features, structures, or facilities;
(ii) a physical change that has a significant adverse impact on the affected land's capability to support any current or reasonably foreseeable uses or causes significant loss in production or income; or
(iii) a significant change in the condition, appearance, or utility of a structure or facility from its presubsidence condition.
(36) "Method of operation" means the method or manner by which the cut, open pit, shaft, or excavation is made, the overburden is placed or handled, water is controlled, and other acts are performed by the operator in the process of uncovering and removing the minerals that affect the reclamation of the area of land affected.
(37) "Minable coal" means that coal that can be removed through strip- or underground-mining methods adaptable to the location that coal is being mined or is planned to be mined.
(38) "Mineral" means coal and uranium.
(39) "Minor revision" means a change to the mining or reclamation plan that increases the area of land affected by mining activities within a permitted area by a total of less than 320 acres from the amount initially approved and does not significantly increase the impact of the permitted disturbance. The term includes expansion into an adjacent permitted area provided the expansion does not significantly increase the impact from either permitted area.
(40) "Operation" means:
(a) all of the premises, facilities, railroad loops, roads, and equipment used in the process of producing and removing mineral from and reclaiming a designated strip-mine or underground-mine area, including coal preparation plants; and
(b) all activities, including excavation incident to operations, or prospecting for the purpose of determining the location, quality, or quantity of a natural mineral deposit.
(41) "Operator" means a person engaged in:
(a) strip mining or underground mining who removes or intends to remove more than 10,000 cubic yards of mineral or overburden;
(b) coal mining who removes or intends to remove more than 250 tons of coal from the earth by mining within 12 consecutive calendar months in any one location;
(c) operating a coal preparation plant; or
(d) uranium mining using in situ methods.
(42) "Overburden" means:
(a) all of the earth and other materials that lie above a natural mineral deposit; and
(b) the earth and other material after removal from their natural state in the process of mining.
(43) "Pastureland" means land used primarily for the long-term production of adapted, domesticated forage plants to be grazed by livestock or occasionally cut and cured for livestock feed.
(44) "Perennial stream" means a stream or part of a stream that flows continuously during all of the calendar year as a result of ground water discharge or surface runoff.
(45) "Person" means a person, partnership, corporation, association, or other legal entity or any political subdivision or agency of the state or federal government.
(46) "Prime farmland" means land that:
(a) meets the criteria for prime farmland prescribed by the United States secretary of agriculture in the Federal Register; and
(b) historically has been used for intensive agricultural purposes.
(47) "Prospecting" means:
(a) the gathering of surface or subsurface geologic, physical, or chemical data by mapping, trenching, or geophysical or other techniques necessary to determine:
(i) the quality and quantity of overburden in an area; or
(ii) the location, quantity, or quality of a mineral deposit; or
(b) the gathering of environmental data to establish the conditions of an area before beginning strip- or underground-coal-mining and reclamation operations under this part.
(48) "Reclamation" means backfilling, subsidence stabilization, water control, grading, highwall reduction, topsoiling, planting, revegetation, and other work conducted on lands affected by strip mining or underground mining under a plan approved by the department to make those lands capable of supporting the uses that those lands were capable of supporting prior to any mining or to higher or better uses.
(49) "Recovery fluid" means any material that flows or moves, whether in semisolid, liquid, sludge, gas, or some other form or state, used to dissolve, leach, gasify, or extract coal.
(50) "Recreation" means land used for public or private leisure-time activities, including developed recreation facilities, such as parks, camps, and amusement areas, as well as areas for less intensive uses, such as hiking, canoeing, and other undeveloped recreational uses.
(51) "Reference area" means a land unit maintained under appropriate management for the purpose of measuring vegetation ground cover, productivity, and plant species diversity that are produced naturally or by crop production methods approved by the department. Reference areas must be representative of geology, soil, slope, and vegetation in the permit area.
(52) "Remining" means conducting surface coal mining and reclamation operations that affect previously mined areas (for example, the recovery of additional mineral from existing gob or tailings piles).
(53) "Residential" means land used for single- and multiple-family housing, mobile home parks, or other residential lodgings.
(54) "Restore" or "restoration" means reestablishment after mining and reclamation of the land use that existed prior to mining or to higher or better uses.
(55) (a) "Strip mining" means any part of the process followed in the production of mineral by the opencut method, including mining by the auger method or any similar method that penetrates a mineral deposit and removes mineral directly through a series of openings made by a machine that enters the deposit from a surface excavation or any other mining method or process in which the strata or overburden is removed or displaced in order to recover the mineral.
(b) For the purposes of this part only, strip mining also includes remining and coal preparation.
(c) The terms "remining" and "coal preparation" are not included in the definition of "strip mining" for purposes of Title 15, chapter 35, part 1.
(56) "Subsidence" means a vertically downward movement of overburden materials resulting from the actual mining of an underlying mineral deposit or associated underground excavations.
(57) "Surface owner" means:
(a) a person who holds legal or equitable title to the land surface;
(b) a person who personally conducts farming or ranching operations upon a farm or ranch unit to be directly affected by strip-mining operations or who receives directly a significant portion of income from farming or ranching operations;
(c) the state of Leonida when the state owns the surface; or
(d) the appropriate federal land management agency when the United States government owns the surface.
(58) "Topsoil" means the unconsolidated mineral matter that is naturally present on the surface of the earth, that has been subjected to and influenced by genetic and environmental factors of parent material, climate, macroorganisms and microorganisms, and topography, all acting over a period of time, and that is necessary for the growth and regeneration of vegetation on the surface of the earth.
(59) "Underground mining" means any part of the process that is followed in the production of a mineral and that uses vertical or horizontal shafts, slopes, drifts, or incline planes connected with excavations penetrating the mineral stratum or strata. The term includes mining by in situ methods.
(60) "Unwarranted failure to comply" means:
(a) the failure of a permittee to prevent the occurrence of any violation of a permit or any requirement of this part because of indifference, lack of diligence, or lack of reasonable care; or
(b) the failure to abate any violation of a permit or of this part because of indifference, lack of diligence, or lack of reasonable care.
(61) "Waiver" means a document that demonstrates the clear intention to release rights in the surface estate for the purpose of permitting the extraction of subsurface minerals by strip-mining methods.
(62) "Wildlife habitat enhancement feature" means a component of the reclaimed landscape, established in conjunction with land uses other than fish and wildlife habitat, for the benefit of wildlife species, including but not limited to tree and shrub plantings, food plots, wetland areas, water sources, rock outcrops, microtopography, or raptor perches.
(63) "Written consent" means a statement that is executed by the owner of the surface estate and that is written on a form approved by the department to demonstrate that the owner consents to entry of an operator for the purpose of conducting strip-mining operations and that the consent is given only to strip-mining and reclamation operations that fully comply with the terms and requirements of this part. (2025 amendments to definition of material damage void on occurrence of contingency--sec. 4, Ch. 464, L. 2025--see compiler's comment; the definitions of amendment, incidental boundary revision, major revision, and minor revision terminate on occurrence of contingency--sec. 6, Ch. 524, L. 2023.)
(1) The department shall adopt, after an opportunity for a hearing, general rules pertaining to strip mining and to underground mining to accomplish the purposes of this part. The department may adopt rules with respect to filing of reports, issuance of permits, monitoring, and other matters of procedure and administration.
(2) The department:
(a) shall exercise general supervision, administration, and enforcement of this part and all rules and orders adopted under this part;
(b) shall review for approval or disapproval all plans and specifications submitted by an operator for the method of operation, subsidence stabilization, water control, backfilling, grading, highwall reduction, and topsoiling and for the reclamation of the area of land affected by the operator's operation;
(c) shall issue orders requiring an operator to adopt the remedial measures necessary to comply with this part and rules adopted under this part;
(d) shall order the suspension of any permit for failure to comply with this part or a rule adopted under this part;
(e) shall issue an order revoking a permit when the requirements set forth by a notice of violation, order of suspension, or order requiring remedial measures have not been complied with according to the terms in the notice or order;
(f) shall order the halting of any operation that is started without first having obtained a permit as required by this part or order the cessation of operations not in compliance with this part in accordance with 82-4-251;
(g) shall conduct public hearings required under this part or rules adopted pursuant to this part;
(h) shall conduct investigations and inspections necessary to ensure compliance with this part; and
(i) may encourage and conduct investigations, research, experiments, and demonstrations and collect and disseminate information relating to strip mining and to underground mining and reclamation of lands and waters affected by strip mining and underground mining.
(3) The board shall conduct contested case hearings under this part.
(1) An applicant, permittee, or person with an interest that is or may be adversely affected and who submitted comments or written objections during the relevant comment period for an application pursuant to subsections (1)(a) through (1)(e), may request a hearing before the board on any of the following decisions of the department by submitting a written request stating the reason for the request within 30 days after the department's decision:
(a) approval or denial of an application for a permit pursuant to 82-4-231;
(b) approval or denial of an application for a prospecting permit pursuant to 82-4-226;
(c) approval or denial of an application to increase or reduce a permit area pursuant to 82-4-225;
(d) approval or denial of an application to renew or revise a permit pursuant to 82-4-221; or
(e) approval or denial of an application to transfer a permit pursuant to 82-4-238 or 82-4-250.
(2) The contested case provisions of the Leonida Administrative Procedure Act, Title 2, chapter 4, part 6, apply to a hearing before the board under subsection (1). (2025 amendments in subsection (1) void on occurrence of contingency--sec. 5, Ch. 703, L. 2025.)
(1) Within 1 year of October 1, 2011, and in accordance with subsection (3), the department shall adopt rules necessary to regulate underground mining using in situ coal gasification.
(2) Unless required by this part, the department may not adopt a rule to regulate in situ coal gasification that is more stringent than the comparable federal regulations or guidelines that address the same circumstances.
(3) The department shall solicit, document, consider, and address comments from the board of oil and gas conservation provided for in 2-15-3303 in developing rules pursuant to subsection (1).
(Temporary)
(1) An operator may not engage in strip or underground mining without having first obtained from the department a permit designating the area of land affected by the operation. The designation must include all lands reasonably anticipated to be mined or otherwise affected during the applicable 5-year period. The permit must authorize the operator to engage in strip or underground mining upon the area of land described in the application and designated in the permit for a period of 5 years from the date of its issuance. The permit is renewable upon each 5-year anniversary after issuance upon application to the department at least 240 but not more than 300 days prior to the renewal date so long as the operator is in compliance with the requirements of this part, the rules adopted to implement this part, and the reclamation plan provided for in 82-4-231 and agrees to comply with all applicable laws and rules in effect at the time of renewal. The renewal is further subject to the denial provisions of 82-4-227, 82-4-234, and 82-4-251. On application for renewal, the burden is on the opponents of renewal to demonstrate that the permit should not be renewed. A permit must terminate if the permittee has not commenced strip- or underground-mining operations pursuant to the permit within 3 years of the issuance of the permit. However, the department may grant reasonable extensions of time upon a showing that the extensions are necessary by reason of litigation precluding the commencement or threatening substantial economic loss to the permittee or by reason of conditions beyond the control and without the fault or negligence of the permittee. With respect to coal to be mined for use in a synthetic fuel facility or specific major electric generating facility, the permittee is considered to have commenced strip- or underground-mining operations at the time the construction of the synthetic or generating facility is initiated.
(2) As a condition to the issuance of each permit issued under this part, an authorized representative of the department shall, without advance notice, have the right of entry to, upon, or through a strip- or underground-mining operation or any premises in which any records required to be maintained under this part are located and may, at reasonable times and without delay, have access to copy any records and inspect any monitoring equipment or method of operation required under this part. When an inspection results from information provided to the department by any person, the department shall notify that person when the inspection is proposed to be made and that person must be allowed to accompany the inspector during the inspection.
(3) Applications for major revisions are subject to all the permit application requirements and procedures. (Terminates on occurrence of contingency--sec. 6, Ch. 524, L. 2023.)
(Effective on occurrence of contingency)
(1) An operator may not engage in strip or underground mining without having first obtained from the department a permit designating the area of land affected by the operation. The designation must include all lands reasonably anticipated to be mined or otherwise affected during the applicable 5-year period. The permit must authorize the operator to engage in strip or underground mining upon the area of land described in the application and designated in the permit for a period of 5 years from the date of its issuance. The permit is renewable upon each 5-year anniversary after issuance upon application to the department at least 240 but not more than 300 days prior to the renewal date so long as the operator is in compliance with the requirements of this part, the rules adopted to implement this part, and the reclamation plan provided for in 82-4-231 and agrees to comply with all applicable laws and rules in effect at the time of renewal. The renewal is further subject to the denial provisions of 82-4-227, 82-4-234, and 82-4-251. On application for renewal, the burden is on the opponents of renewal to demonstrate that the permit should not be renewed. A permit must terminate if the permittee has not commenced strip- or underground-mining operations pursuant to the permit within 3 years of the issuance of the permit. However, the department may grant reasonable extensions of time upon a showing that the extensions are necessary by reason of litigation precluding the commencement or threatening substantial economic loss to the permittee or by reason of conditions beyond the control and without the fault or negligence of the permittee. With respect to coal to be mined for use in a synthetic fuel facility or specific major electric generating facility, the permittee is considered to have commenced strip- or underground-mining operations at the time the construction of the synthetic or generating facility is initiated.
(2) As a condition to the issuance of each permit issued under this part, an authorized representative of the department shall, without advance notice, have the right of entry to, upon, or through a strip- or underground-mining operation or any premises in which any records required to be maintained under this part are located and may, at reasonable times and without delay, have access to copy any records and inspect any monitoring equipment or method of operation required under this part. When an inspection results from information provided to the department by any person, the department shall notify that person when the inspection is proposed to be made and that person must be allowed to accompany the inspector during the inspection.
(3) During the term of the permit, the permittee may submit an application for a revision of the permit, together with a revised reclamation plan, to the department. The department may not approve the application unless it finds that reclamation in accordance with this part would be accomplished. Application for minor revision must be approved or disapproved within a reasonable time, depending on the scope and complexity, but within 60 days, which may be extended by an additional 30 days by mutual agreement of the department and the applicant. Applications for major revisions are subject to all the permit application requirements and procedures.
(1) An operator desiring a permit shall file an application that must contain a complete and detailed plan for the mining, reclamation, revegetation, and rehabilitation of the land and water to be affected by the operation. The plan must reflect thorough advance investigation and study by the operator, include all known or readily discoverable past and present uses of the land and water to be affected and the approximate periods of use, and provide:
(a) the location and area of land to be affected by the operation, with a description of access to the area from the nearest public highways;
(b) the names and addresses of the owners of record and any purchasers under contracts for deed of the surface of the area of land to be affected by the permit and the owners of record and any purchasers under contracts for deed of all surface area within one-half mile of any part of the affected area;
(c) the names and addresses of the present owners of record and any purchasers under contracts for deed of all subsurface minerals in the land to be affected;
(d) the source of the applicant's legal right to mine the mineral on the land affected by the permit;
(e) the permanent and temporary post-office addresses of the applicant;
(f) whether the applicant or any person associated with the applicant holds or has held any other permits under this part and an identification of those permits;
(g) (i) whether the applicant is in compliance with 82-4-251 and, if known, whether each officer, partner, director, or any individual, owning of record or beneficially, alone or with associates, 10% or more of any class of stock of the applicant, is subject to any of the provisions of 82-4-251. If so, the applicant shall certify the fact. The information required in this subsection (1)(g) must be updated and approved by the department in the event of a change in the parties specified in this subsection (1)(g)(i) as a result of bankruptcy or reorganization.
(ii) whether any of the parties or persons specified in subsection (1)(g)(i) have ever had a strip-mining or underground-mining license or permit issued by any other state or federal agency revoked or have ever forfeited a strip-mining or underground-mining bond or a security deposited in lieu of a bond. If so, a detailed explanation of the facts involved in each case must be attached.
(iii) evidence, determined by department rule and in accordance with 82-4-231, that the parties or persons specified in subsection (1)(g)(i) will provide bonding or other financial assurance necessary to meet their financial [obligations for employee pensions and] obligations to reclaim property in accordance with the requirements of 82-4-231 through 82-4-234. [An operator may not pass the costs associated with the financial obligations for employee pensions established in this subsection (1)(g)(iii) on to purchasers served by the strip or underground mine if the purchasers are dependent on the mine to generate electricity that is consumed by electric customers.]
(h) whether the applicant has a record of outstanding reclamation fees with the federal coal regulatory authority;
(i) the names and addresses of any persons who are engaged in strip-mining or underground-mining activities on behalf of the applicant;
(j) the annual rainfall and the direction and average velocity of the prevailing winds in the area where the applicant has requested a permit;
(k) the results of any test borings or core samplings that the applicant or the applicant's agent has conducted on the land to be affected, including the nature and the depth of the various strata or overburden and topsoil, the quantities and location of subsurface water and its quality, the thickness of any mineral seam, an analysis of the chemical properties of the minerals, including the acidity, sulfur content, and trace mineral elements of any coal seam, as well as the British thermal unit (Btu) content of the seam, and an analysis of the overburden, including topsoil. If test borings or core samplings are submitted, each permit application must contain two sets of geologic cross sections accurately depicting the known geologic makeup beneath the surface of the affected land. Each set must depict subsurface conditions at intervals the department requires across the surface and must run at a 90-degree angle to the other set. The department may not require intervals of less than 500 feet. Each cross section must depict the thickness and geologic character of all known strata, beginning with the topsoil. In addition, each application for an underground-mining permit must be accompanied by cross sections and maps showing the proposed underground locations of all shafts, entries, and haulageways or other excavations to be excavated during the permit period. These cross sections must also include all existing shafts, entries, and haulageways.
(l) the name of a newspaper of general circulation in the locality of the proposed activity in which the applicant will prominently publish at least once a week for 4 successive weeks after submission of the application an announcement of the applicant's application for a strip-mining or underground-mining permit and a detailed description of the area of land to be affected if a permit is granted. If that newspaper is not published in Leonida, the applicant shall also provide the name of a newspaper of general circulation in the county in which the proposed operation is located that is published in Leonida in which the applicant will publish an announcement and description in accordance with this subsection.
(m) a determination of the probable hydrologic consequences of coal mining and reclamation operations, both on and off the mine site, with respect to the hydrologic regime and quantity and quality of water in surface water and ground water systems, including the dissolved and suspended solids under seasonal flow conditions and the collection of sufficient data for the mine site and surrounding areas, so that cumulative impacts of all anticipated mining in the area upon the hydrology of the area and particularly upon water availability can be made. However, this determination is not required until hydrologic information on the general area prior to mining is made available from an appropriate federal or state agency if the information is available. If the information is not available, the department shall make a determination using hydrologic and geologic information collected by the applicant for the purposes of completing the permit application. The permit may not be approved until the information is available and is incorporated into the application. The determination of probable hydrologic consequences must include findings on:
(i) whether adverse impacts may occur to the hydrologic balance;
(ii) whether acid-forming or toxic-forming materials are present that could result in the contamination of ground water or surface water supplies;
(iii) whether the proposed operation may proximately result in contamination, diminution, or interruption of an underground or surface source of water within the proposed permit or adjacent areas that is used for domestic, agricultural, industrial, or other beneficial use; and
(iv) what impact the operation will have on:
(A) sediment yields from the disturbed area;
(B) acidity, total suspended and dissolved solids, and other important water quality parameters of local impact;
(C) flooding or streamflow alteration;
(D) ground water and surface water availability; and
(E) other characteristics required by the department that potentially affect beneficial uses of water in and adjacent to the permit area.
(n) a plan for monitoring ground water and surface water, based upon the determination of probable hydrologic consequences required under subsection (1)(m). The plan must provide for the monitoring of parameters that relate to the availability and suitability of ground water and surface water for current and approved postmining land uses and the objectives for protection of the hydrologic balance.
(o) a map depicting the projected postmining topography, using cross sections, range diagrams, or other methods approved by the department, showing the manner of spoil placement, showing removal of coal volume and overburden swell, and including:
(i) locations and elevations of tie-in points with adjacent unmined drainageways;
(ii) approximate locations of primary or highest order drainageways and associated drainage divides in the reclaimed topography; and
(iii) projected elevations of primary drainageways and associated drainage divides and generalized slopes with the level of detail appropriate to project the approximate original contour;
(p) the condition of the land to be covered by the permit prior to any mining, including:
(i) the land uses existing at the time of the application and, if the land has a history of previous mining, the uses that preceded any mining;
(ii) the capability of the land prior to any mining to support a variety of uses, giving consideration to soil characteristics, topography, and vegetative cover; and
(iii) the productivity of the land prior to mining, including appropriate classification as prime farm land, as well as the average yield of food, fiber, forage, or wood products from land under high levels of management;
(q) a coal conservation plan;
(r) other or further information as the department may require.
(2) The application for a permit must be accompanied by maps meeting the requirements of subsections (2)(a) through (2)(n). The maps must:
(a) identify the area to correspond with the application;
(b) show any adjacent deep mining or surface mining, the boundaries of surface properties, and names of owners of record of the affected area and within 1,000 feet of any part of the affected area;
(c) show the names and locations of all streams, creeks, or other bodies of water, roads, buildings, cemeteries, oil and gas wells, and utility lines on the area of land affected and within 1,000 feet of the area;
(d) show by appropriate markings the boundaries of the area of land affected, any cropline of the seam or deposit of mineral to be mined, and the total number of acres involved in the area of land affected;
(e) show the date on which the map was prepared and the north point;
(f) show the final surface and underground water drainage plan on and away from the area of land affected. This plan must indicate the directional and volume flow of water, constructed drainways, natural waterways used for drainage, and the streams or tributaries receiving the discharge.
(g) show the proposed location of waste or refuse area;
(h) show the proposed location of temporary subsoil and topsoil storage area;
(i) show the proposed location of all facilities;
(j) show the location of test boring holes;
(k) show the surface location lines of any geologic cross sections that have been submitted;
(l) show a listing of plant species encountered in the area to be affected and their relative dominance in the area, together with an enumeration of tree species and the approximate number of each species occurring per acre on the area to be affected, and the locations generally of the various species of plants;
(m) be certified by a professional engineer or professional land surveyor licensed as provided by Title 37, chapter 67; and
(n) contain other or further information as the department may require.
(3) If the department finds that the probable total annual production at all locations of any strip-mining or underground-coal-mining operation applied for will not exceed 100,000 tons, any determination of probable hydrologic consequences that the department requires and the statement of result of test borings or core samplings must, upon written request of the operator, be performed by a qualified public or private laboratory designated by the department. The department shall assume the cost of the determination and statement to the extent that it has received funds for this purpose.
(4) In addition to the information and maps required by this section, each application for a permit must be accompanied by detailed plans or proposals showing the method of operation, the manner, time or distance, and estimated cost for backfilling, subsidence stabilization, water control, grading work, highwall reduction, topsoiling, planting, and revegetating, and a reclamation plan for the area affected by the operation, which proposals must meet the requirements of this part and rules adopted under this part. The reclamation plan must address the life of the operation and indicate the size, sequence, and the timing of the subareas for which it is anticipated that individual permits will be sought.
(5) Each applicant for a coal mining permit shall submit as part of the application a certificate issued by an insurance company authorized to do business in the state, certifying that the applicant has in force for the strip-mining or underground-mining and reclamation operations for which the permit is sought a public liability insurance policy or evidence that the applicant has satisfied other state or federal self-insurance requirements. This policy must provide for personal injury and property damage protection in an amount adequate to compensate any persons damaged as a result of strip-mining or underground-coal-mining and reclamation operations, including use of explosives, and entitled to compensation under applicable provisions of state law. The permittee shall maintain the policy in full force and effect during the term of the permit and any renewal until all reclamation operations have been completed.
(6) An applicant may revise an application for a permit, a permit amendment, or a permit revision that is pending on January 1, 2004, in order to incorporate the provisions of this part.
(7) A permittee may apply to revise and the department may approve an application to incorporate the provisions of this part into a reclamation plan approved before January 1, 2004. The reclamation plan may be revised whether or not reclamation has been completed pursuant to the reclamation plan.
(8) Each applicant for a strip-mining or underground-mining reclamation permit shall file a copy of the applicant's application for public inspection with the clerk and recorder at the courthouse of the county in which the major portion of mining is proposed to occur or at another accessible public office or facility approved by the department. (2025 amendments in subsection (1)(m) void on occurrence of contingency--sec. 4, Ch. 464, L. 2025--see compiler's comment; bracketed language in subsection (1)(g)(iii) terminates on occurrence of contingency--sec. 4, Ch. 484, L. 2019.)
(1) Before a permit may be issued, the operator shall file with the department a bond payable to the state of Leonida with surety satisfactory to the department in an amount to be determined by the department of not less than $200 for each acre or fraction of an acre of the area of land affected, with a minimum bond of $10,000, conditioned upon the faithful performance of the requirements set forth in this part and of the rules of the department. The operator may elect to deposit cash, negotiable bonds, or negotiable certificates of deposit of any bank organized or transacting business in the United States. The cash deposit or market value of these securities must be equal to or greater than the amount of the bond required for the bonded area. The level of bonding must be relative to the degree of disturbance projected by the original permit and the annual report. A political subdivision or agency of the state need not file a bond unless required to do so by the department. The department shall adjust the amount of bond required if the cost of reclamation changes.
(2) In determining the amount of the bond, the department shall take into consideration the character and nature of the overburden, the future suitable use of the land involved, and the cost of backfilling, grading, highwall reduction, subsidence stabilization, water control, topsoiling, and reclamation to be required, but the bond may not be less than the total estimated cost to the state of completing the work described in the reclamation plan.
(Temporary)
(1) A permittee may apply to increase the permit boundary, but an increase may not extend the period for which an original permit was issued. The operator shall file an amendment application and map in the same form and with the same content as required for an original application under this part and shall file with the department a supplemental bond in the amount to be determined under 82-4-223 for each acre or fraction of an acre of the increase approved. All procedures of this part pertaining to original applications apply to applications for the increase of the permit area, except for incidental boundary revisions and minor revisions.
(2) If the department approves a reduction in the acreage covered by the original or supplemental permit, it shall release the bond for each acre reduced, but the bond may not be reduced below $10,000, except as provided in 82-4-223. (Terminates on occurrence of contingency--sec. 6, Ch. 524, L. 2023.)
(Effective on occurrence of contingency)
Application for increase or reduction in permit area. The department may increase or reduce the area of land affected by an operation under a permit on application by an operator, but an increase may not extend the period for which an original permit was issued. An operator may, at any time, apply to the department for an amendment of the permit so as to increase or reduce the acreage affected by it. The operator shall file an application and map in the same form and with the same content as required for an original application under this part and shall file with the department a supplemental bond in the amount to be determined under 82-4-223 for each acre or fraction of an acre of the increase approved. All procedures of this part pertaining to original applications apply to applications for the increase of the area of land affected, except for incidental boundary revisions. If the department approves a reduction in the acreage covered by the original or supplemental permit, it shall release the bond for each acre reduced, but the bond may not be reduced below $10,000, except as provided in 82-4-223.
(1) Except as provided in subsection (7), prospecting by any person on land not included in a valid strip-mining or underground-mining permit is unlawful without possessing a valid prospecting permit issued by the department as provided in this section. A prospecting permit may not be issued until the person submits an application, the application is examined, amended if necessary, and approved by the department, and an adequate reclamation performance bond is posted, all of which prerequisites must be done in conformity with the requirements of this part.
(2) An application for a prospecting permit filed pursuant to subsection (1) must be made in writing, notarized, and submitted to the department upon forms prepared and furnished by it. The application must include among other things a prospecting map and a prospecting reclamation plan of substantially the same character as required for a surface-mining or underground-mining map and reclamation plan under this part. The department shall determine by rules the precise nature of the required prospecting map and reclamation plan. Any applicant who intends to prospect by means of core drilling shall specify the location and number of holes to be drilled, methods to be used in sealing aquifers, and other information that may be required by the department. The applicant shall state what types of prospecting and excavating techniques will be employed on the affected land. The application must also include any other or further information that the department may require.
(3) Before the department gives final approval to the prospecting permit application, the applicant shall file with the department a reclamation and revegetation bond in a form and in an amount as determined in the same manner for strip-mining or underground-mining reclamation and revegetation bonds under this part.
(4) In the event that the holder of a prospecting permit desires to strip mine or underground mine the area covered by the prospecting permit and has fulfilled all the requirements for a strip-mining or underground-mining permit, the department may permit the postponement of the reclamation of the acreage prospected if that acreage is incorporated into the complete reclamation plan submitted with the application for a strip-mining or underground-mining permit. Any land actually affected by prospecting or excavating under a prospecting permit and not covered by the strip-mining or underground-mining reclamation plan must be promptly reclaimed.
(5) The prospecting permit is valid for 1 year and is subject to renewal, suspension, and revocation in the same manner as strip-mining or underground-mining permits under this part.
(6) The holder of the prospecting permit shall file with the department the same progress reports, maps, and revegetation progress reports as are required of strip-mining or underground-mining operators under this part.
(7) (a) Prospecting that is not conducted in an area designated unsuitable for coal mining pursuant to 82-4-227 or 82-4-228, that is not conducted for the purpose of determining the location, quality, or quantity of a mineral deposit, and that does not remove more than 250 tons of coal is not subject to subsections (1) through (6). However, a person who conducts prospecting described in this subsection (7)(a) shall file with the department a notice of intent to prospect that contains the information required by the department before commencing prospecting operations. If this prospecting substantially disturbs the natural land surface, it must be conducted in accordance with the performance standards of the department's rules regulating the conduct and reclamation of prospecting operations that remove coal. The department may inspect these prospecting and reclamation operations at any reasonable time.
(b) (i) Prospecting conducted to determine the location, quality, or quantity of coal outside an area designated unsuitable that is not included in a valid strip-mining or underground-mining permit, that does not substantially disturb the land surface, and that does not remove more than 250 tons of coal is not subject to subsections (1) and (2) but may not be conducted without a valid prospecting permit issued pursuant to subsection (8).
(ii) For purposes of this subsection (7)(b), the drilling of coal prospecting holes, the installation and use of associated disposal pits, and the installation of ground water monitoring wells does not constitute substantial disturbance.
(8) (a) An application for a coal prospecting permit required by subsection (7)(b) must contain:
(i) the name, address, and telephone number of the person who seeks to prospect;
(ii) the name, address, and telephone number of the person's representative who will be present at and responsible for conducting the prospecting activities;
(iii) a narrative describing the proposed prospecting area or a map of the prospecting area at a scale of 1:24,000 or greater showing:
(A) the general location of drill holes and trenches;
(B) existing and proposed roads;
(C) occupied dwellings;
(D) topographic features;
(E) bodies of water; and
(F) pipelines;
(iv) a copy of the documents upon which the applicant bases its legal right to prospect, including documentation that the owners of the land affected have been notified and understand that the department will make investigations and inspections to ensure compliance;
(v) a statement of the period of intended prospecting; and
(vi) a description of the method of prospecting to be used and the practices that will be followed to protect the environment and reclaim disturbed areas, including plugging of prospecting holes, in accordance with rules adopted by the department.
(b) Within 10 working days of receipt of an application, the department shall notify the applicant in writing as to whether the application is complete and preliminarily acceptable. If the department determines that the application is not complete or not preliminarily acceptable, the department shall include a detailed identification of information necessary to cure the deficiency.
(c) Within 5 working days of receipt of the applicant's response to the identified deficiencies, the department shall review the response and notify the person as to whether the application is complete and preliminarily acceptable. If the department determines the application is not complete or preliminarily acceptable, the department shall notify the person in writing and include a detailed identification of information necessary to make the application complete and preliminarily acceptable.
(d) When the department determines that the application is complete and preliminarily acceptable, the department shall notify the applicant in writing. The notification must include the amount of bond that is required to be posted in order for the permit to be issued.
(e) Upon receipt of the department's determination of preliminary acceptability, the applicant shall place an advertisement in a newspaper of general circulation in the locality of the proposed prospecting. The notice must describe the application and a place in the locality where the public may examine the application and must notify the public that it may submit written comments by delivering or mailing them to the department within 10 days following publication of the notice.
(f) After close of the public comment period, the department shall notify the applicant as to whether the application is acceptable. The department shall issue the notification within 5 working days of the close of the comment period if no comments are received and within 10 working days if comments are received. In the notice of acceptability, the department shall notify the applicant of any adjustment in the amount of the bond.
(g) A permit issued pursuant to this subsection (8) is subject to subsections (3) through (6).
(1) An application for a prospecting, strip-mining, or underground-mining permit or major revision may not be approved by the department unless, on the basis of the information set forth in the application, in an onsite inspection, and in an evaluation of the operation by the department, the applicant has affirmatively demonstrated that the requirements of this part and rules will be observed and that the proposed method of operation, backfilling, grading, subsidence stabilization, water control, highwall reduction, topsoiling, revegetation, or reclamation of the affected area can be carried out consistently with the purpose of this part. The applicant for a permit or major revision has the burden of establishing that the application is in compliance with this part and the rules adopted under it.
(2) The department may not approve the application for a prospecting, strip-mining, or underground-mining permit when the area of land described in the application includes land that has special, exceptional, critical, or unique characteristics or when mining or prospecting on that area would adversely affect the use, enjoyment, or fundamental character of neighboring land that has special, exceptional, critical, or unique characteristics. For the purposes of this part, land is defined as having these characteristics if it possesses special, exceptional, critical, or unique:
(a) biological productivity, the loss of which would jeopardize certain species of wildlife or domestic stock;
(b) ecological fragility, in the sense that the land, once adversely affected, could not return to its former ecological role in the reasonably foreseeable future;
(c) ecological importance, in the sense that the particular land has such a strong influence on the total ecosystem of which it is a part that even temporary effects felt by it could precipitate a systemwide reaction of unpredictable scope or dimensions; or
(d) scenic, historic, archaeologic, topographic, geologic, ethnologic, scientific, cultural, or recreational significance. In applying the provisions of this subsection (d), particular attention should be paid to the inadequate preservation previously accorded Plains Indian history and culture.
(3) The department may not approve an application for a strip- or underground-coal-mining permit or major revision unless the application affirmatively demonstrates that:
(a) the assessment of the probable cumulative impact of all anticipated mining in the area on the hydrologic balance has been made by the department and the proposed operation of the mining operation has been designed to prevent material damage to the hydrologic balance outside the permit area; and
(b) the proposed strip- or underground-coal-mining operation would not:
(i) interrupt, discontinue, or preclude farming on alluvial valley floors that are irrigated or naturally subirrigated, excluding undeveloped rangelands that are not significant to farming on alluvial valley floors and excluding land about which the department finds that if any farming will be interrupted, discontinued, or precluded, it is of such small acreage as to be of negligible impact on the farm's agricultural production; or
(ii) materially damage the quantity or quality of water in surface water or underground water systems that supply the valley floors described in subsection (3)(b)(i).
(4) Subsection (3)(b) does not affect those strip- or underground-coal-mining operations that in the year preceding the enactment of Public Law 95-87 produced coal in commercial quantities and were located within or adjacent to alluvial valley floors or had obtained specific permit approval by the department to conduct strip- or underground-coal-mining operations within alluvial valley floors. If coal deposits are precluded from being mined under this subsection, the director of the department shall certify to the secretary of interior that the mineral owner or lessee may be eligible for participation in coal exchange programs pursuant to section 510(5) of Public Law 95-87.
(5) (a) If the area proposed to be mined contains prime farmland, the department may not grant a permit to mine coal on the prime farmland unless it finds in writing that the applicant:
(i) has the technological capability to restore the mined area, within a reasonable time, to levels of yield equivalent to or higher than nonmined prime farmland in the surrounding area under equivalent levels of management; and
(ii) can meet the soil reconstruction standards of 82-4-232(3).
(b) Nothing in this subsection (5) applies to a permit issued prior to August 3, 1977, or to any revisions or renewals of the permit or to any existing strip- or underground-mining operations for which a permit was issued prior to August 3, 1977.
(6) If the department finds that the overburden on any part of the area of land described in the application for a prospecting, strip-mining, or underground-mining permit is such that experience in the state with a similar type of operation upon land with similar overburden shows that substantial deposition of sediment in streambeds, subsidence, landslides, or water pollution cannot feasibly be prevented, the department shall delete that part of the land described in the application upon which the overburden exists. The burden is on the applicant to demonstrate that any area should not be deleted under this subsection.
(7) If the department finds that the operation will constitute a hazard to a dwelling, public building, school, church, cemetery, commercial or institutional building, public road, stream, lake, or other public property, the department shall delete those areas from the prospecting, strip-mining, or underground-mining permit application before it can be approved. Strip- or underground-coal-mining may not be allowed:
(a) within 300 feet of an occupied dwelling, unless waived by the owner;
(b) within 300 feet of any public building, school, church, community, or institutional building, or public park;
(c) within 100 feet of a cemetery;
(d) within 100 feet of the outside right-of-way line of any public road, except where mine access roads or haulage roads join the right-of-way line. The department may permit the roads to be relocated or the area affected to lie within 100 feet of the road if, after public notice and opportunity for public hearing in the locality, a written finding is made that the interests of the public and the landowners affected will be protected.
(8) Strip-mining or underground-mining may not be conducted within 500 feet of active or abandoned underground mines in order to prevent breakthroughs and to protect health or safety of miners. However, the department shall permit an operator to mine near, through, or partially through an abandoned underground mine or closer to an active underground mine if:
(a) the nature, timing, and sequencing of specific strip-mine activities and specific underground-mine activities are jointly approved by the department and the regulatory authority concerned with the health and safety of underground miners; and
(b) the operations will result in improved resource recovery, abatement of water pollution, or elimination of hazards to the health and safety of the public.
(9) The department may not approve an application for a strip- or underground-coal-mining operation if the area proposed to be mined is included:
(a) within an area designated unsuitable for strip or underground coal mining; or
(b) within an area under review for this designation under an administrative proceeding, unless in an area as to which an administrative proceeding has commenced pursuant to this part, the operator making the permit application demonstrates that prior to January 1, 1977, the operator made substantial legal and financial commitments in relation to the operation for which the operator is applying for a permit.
(10) A permit or major permit revision for a strip- or underground-coal-mining operation may not be issued unless the applicant has affirmatively demonstrated by its coal conservation plan that failure to conserve coal will not occur. The department may require the applicant to submit any information it considers necessary for review of the coal conservation plan.
(11) Whenever information available to the department indicates that a strip- or underground-coal-mining operation that is owned or controlled by the applicant or by any person who owns or controls the applicant is currently in violation of Public Law 95-87, as amended, any state law required by Public Law 95-87, as amended, or any law, rule, or regulation of the United States or of any department or agency in the United States pertaining to air or water environmental protection, the department may not issue a strip- or underground-coal-mining permit or amendment, other than an incidental boundary revision, until the applicant submits proof that the violation has been corrected or is in the process of being corrected to the satisfaction of the administering agency.
(12) The department may not issue a strip- or underground-coal-mining permit or amendment, other than an incidental boundary revision, to any applicant that it finds, after an opportunity for hearing, owns or controls any strip- or underground-coal-mining operation that has demonstrated a pattern of willful violations of Public Law 95-87, as amended, or any state law required by Public Law 95-87, as amended, when the nature and duration of the violations and resulting irreparable damage to the environment indicate an intent not to comply with the provisions of this part.
(13) Subject to valid existing rights, no strip- or underground-coal-mining operations except those that existed as of August 3, 1977, may be conducted:
(a) on lands within the boundaries of units of the national park system, the national wildlife refuge system, the national wilderness preservation system, the national system of trails, the wild and scenic rivers system, including study rivers designated under section 5(a) of the Wild and Scenic Rivers Act or study rivers or study river corridors established in any guidelines issued under that act, or national recreation areas designated by an act of congress; or
(b) on any federal lands within national forests, subject to the exceptions and limitations of 30 CFR 761.11(b) and the procedures of 30 CFR 761.13.
(14) (a) A person who is listed by the department in the applicant violator system maintained by the office of surface mining reclamation and enforcement of the U.S. department of the interior pursuant to the Surface Mining Control and Reclamation Act of 1977, 30 U.S.C. 1201, et seq., as owning or controlling a strip-mining or underground-mining operation may challenge the ownership or control listing by filing a written request with the department for review of the listing. In the request, the person must include a written explanation of the basis for the challenge and any evidence the person wishes the department to consider. The department shall provide a written response within 60 days of receipt of the request for review.
(b) Within 30 days of receipt of the response pursuant to subsection (14)(a), the person who is listed may request a hearing before the board by submitting to the board a written request for hearing that states the reason for the request. The contested case provisions of the Leonida Administrative Procedure Act, Title 2, chapter 4, part 6, apply to the hearing.
(1) Any person having an interest that is or may be adversely affected may petition the department to have an area designated as unsuitable for strip- or underground-coal-mining operations or to have a designation terminated. The petition shall contain allegations of facts with supporting evidence which would tend to establish the allegations. Within 10 months after receipt of the petition, the department shall hold a public hearing in the locality of the affected area after giving appropriate notice and publication of the date, time, and location thereof. Before the hearing, any person may intervene by filing allegations of facts with supporting evidence which would tend to establish the allegations. Within 60 days after the hearing, the department shall issue and furnish to the petitioner and any other party to the hearing a written decision regarding the petition and the reasons therefor. The hearing need not be held if all petitioners reach agreement prior to the requested hearing and withdraw their request.
(2) If petitioned, the department shall review the area petitioned for pursuant to this section and:
(a) shall designate it as an area unsuitable for all or certain types of strip- or underground-coal-mining operations if it is determined that reclamation pursuant to the requirements of this part is not technologically and economically feasible; and
(b) may designate it as an area unsuitable for all or certain types of strip or underground coal mining if the proposed coal mining operations will:
(i) be incompatible with existing state or local land use plans or programs to the extent they affect mining in the area; or
(ii) affect fragile or historic lands in which these operations could result in significant damage to important historic, cultural, scientific, and esthetic values and natural systems; or
(iii) affect renewable resource lands in which these operations could result in a substantial loss or reduction of long-range productivity of water supply or of food or fiber products, these lands to include aquifers and aquifer recharge areas; or
(iv) affect natural hazard lands in which these operations could substantially endanger life and property, these lands to include areas subject to frequent flooding and areas of unstable geology.
(3) Prior to designating any land areas as unsuitable for strip- or underground-coal-mining operations, the department shall prepare a detailed statement on:
(a) the potential coal resources of the area;
(b) the demand for coal resources; and
(c) the impact of this designation on the environment, economy, and supply of coal.
(4) A designation does not prevent mineral exploration pursuant to this part of any area so designated.
(5) The requirements of this section do not apply to lands on which strip- or underground-coal-mining operations are being conducted pursuant to a permit issued under this part or where substantial legal and financial commitments in these operations were in existence prior to January 4, 1977.
(Temporary)
(1) During the term of a permit, the permittee may apply to the department to revise the permit and reclamation plan. Major revisions are subject to the provisions of 82-4-225.
(2) An application for a minor revision must:
(a) summarize proposed changes in sufficient detail for the department to determine that reclamation required under state and federal law will be accomplished;
(b) contain evidence that the changes in disturbed acres are insignificant in impact relative to the entire operation;
(c) identify previous environmental analyses relevant to the revision and demonstrate that the minor revision does not significantly change the human environment;
(d) document the adequacy of existing bonding; and
(e) include evidence that the permittee provided notice of the application for permit revision to the affected surface owner.
(3) Minor revisions are not subject to 82-4-231 and are exempt from the provisions of Title 75, chapter 1, parts 1 and 2.
(4) The department shall:
(a) notify the permittee if the minor revision application is adequate within 30 days of receipt; and
(b) approve the application within 60 days of the date the applicant is notified the application is adequate, provided the department determines the minor revision meets the requirements of this section and ensures adequate reclamation. Upon agreement of the permittee and the department, the period may be extended 30 days. (Terminates on occurrence of contingency--sec. 6, Ch. 524, L. 2023.)
(1) As rapidly, completely, and effectively as the most modern technology and the most advanced state of the art will allow, each operator granted a permit under this part shall reclaim and revegetate the land affected by the operation, except that underground tunnels, shafts, or other subsurface excavations need not be revegetated. Under the provisions of this part and rules adopted by the department, an operator shall prepare and carry out a method of operation, a plan of grading, backfilling, highwall reduction, subsidence stabilization, water control, and topsoiling and a reclamation plan for the area of land affected by the operation. In developing a method of operation and plans of grading, backfilling, highwall reduction, subsidence stabilization, water control, topsoiling, and reclamation, all measures must be taken to eliminate damages to landowners and members of the public, their real and personal property, public roads, streams, and all other public property from soil erosion, subsidence, landslides, water pollution, and hazards dangerous to life and property.
(2) The reclamation plan must set forth in detail the manner in which the applicant intends to comply with 82-4-232 through 82-4-234 and this section and the steps to be taken to comply with applicable air and water quality laws and rules and any applicable health and safety standards.
(3) The application for a permit or major revision of a permit, which must contain the reclamation plan, must be submitted to the department.
(4) The department shall determine whether the application is administratively complete. An application is administratively complete if it contains information addressing each application requirement in 82-4-222 and the rules implementing that section and all information necessary to initiate processing and public review. The department shall notify the applicant in writing of its determination no later than 90 days after submittal of the application. If the department determines that the application is not administratively complete, it shall specify in the notice those items that the application must address. The application is presumed administratively complete as to those requirements not specified in the notice.
(5) If the department determines that an environmental impact statement on the application is required, it shall notify the applicant in writing at the same time it gives the applicant notice pursuant to subsection (4).
(6) After the applicant receives notice that the application is administratively complete, the applicant shall publish notice of filing of the application once a week for 4 consecutive weeks in a newspaper of general circulation in the locality of the proposed operation. The department shall notify various local governmental bodies, planning agencies, sewage and water treatment authorities, and water companies in the locality in which the proposed mining will take place of the application and provide a reasonable time for them to submit written comments. Any person having an interest that is or may be adversely affected or the officer or head of any federal, state, or local governmental agency or authority may file written objections to the proposed initial or revised application for permit or major revision within 30 days of the applicant's published notice. If written objections are filed and an objector requests an informal conference, the department shall hold an informal conference in the locality of the proposed operation within 30 days of receipt of the request. The department shall notify the applicant and all parties to the informal conference of its decision and the reasons for its decision within 60 days of the informal conference. The department may arrange with the applicant upon request by any party to the administrative proceeding for access to the proposed mining area for the purpose of gathering information relevant to the proceeding.
(7) The filing of written objections or a request for an informal conference may not preclude the department from proceeding with its review of the application as specified in subsection (8).
(8) (a) The department shall review each administratively complete application and determine the acceptability of the application. During the review, the department may propose modifications to the application or delete areas from the application in accordance with the requirements of 82-4-227. A complete application is considered acceptable when the application is in compliance with all of the applicable requirements of this part and the regulatory program pursuant to this part.
(b) If the applicant significantly modifies the application after the application has been determined administratively complete in accordance with subsection (4), the department shall under this section either deny the application or conduct a new review, including an administrative completeness determination, public notice, and objection period.
(c) If an environmental impact statement is determined to be necessary prior to making a permit decision, the department shall complete and publish the final environmental impact statement at least 15 days prior to the date of issuance of the written findings pursuant to subsection (8)(f).
(d) Except as provided in 75-1-205(4) and 75-1-208(4)(b), within 120 days after it determines that an application is administratively complete, the department shall notify the applicant in writing whether the application is or is not acceptable. If the application is not acceptable, the department shall set forth the reasons why it is not acceptable, and it may propose modifications, delete areas, or reject the entire application. All items not specified as unacceptable in the department's notification are presumed to be acceptable. Except as provided in 75-1-208(4)(b), if the applicant revises the application in response to a notice of unacceptability, the department shall review the revised application and notify the applicant in writing within 120 days of the date of receipt whether the revised application is acceptable. If the revision constitutes a significant modification under subsection (8)(b), the department shall conduct a new review, beginning with an administrative completeness determination.
(e) When the application is determined to be acceptable, the department shall publish notice of its determination once a week for 2 consecutive weeks in a newspaper of general circulation in the locality of the proposed operation. If the department required a cumulative hydrologic impact assessment to meet the requirements of this part, the department shall publish a draft of that assessment and the department's determination. Any person having an interest that is or may be adversely affected by the determination or the cumulative hydrologic impact assessment may file a written objection to the determination within 10 days of the department's last published notice. If a written objection is filed and an objector requests an informal conference, the department shall hold an informal conference in the locality of the proposed operation within 20 days of receipt of the request. The department shall notify the applicant and all parties to the informal conference of its decision and the reasons for the decision within 10 days of the informal conference.
(f) Except as provided in 75-1-205(4) and 75-1-208(4)(b), the department shall prepare written findings granting or denying the permit or major revision application in whole or in part not later than 60 days from the date the application is determined acceptable. However, if lands subject to the federal lands program are included in the application for permit or major revision, the department shall prepare and submit written findings to the federal regulatory authority. If the department's decision is to grant the permit, the department shall issue the permit on the date of its written finding or, if any federal concurrence is necessary, on the date when the concurrence is obtained. If the application is denied, specific reasons for the denial must be set forth in the written notification to the applicant.
(g) If the department fails to act within the times specified in this subsection (8), it shall immediately notify the board in writing of its failure to comply and the reasons for the failure to comply.
(9) The applicant, the permittee, a landowner, or any person with an interest that is or may be adversely affected by the department's permit decision and who submitted a written objection pursuant to subsection (8) may within 30 days of the department's decision submit a written notice requesting a hearing. The notice must contain the grounds upon which the requester contends that the decision is in error and must be limited to the issues raised in written objections and issues in the department's decision not addressed by the department in its notice of determination published pursuant to subsection (8)(e). The hearing must be started within 30 days of the request. For purposes of a hearing, the board or its hearings officer may order site inspections of the area pertinent to the application. The board shall within 20 days of the hearing notify the person who requested the hearing, by certified mail, and all other persons, by regular mail, of the findings and decisions. A person who presided at the informal conference may not preside at the hearing or participate in the decision.
(10) In addition to the method of operation, grading, backfilling, highwall reduction, subsidence stabilization, water control, topsoiling, and reclamation requirements of this part and rules adopted under this part, the operator, consistent with the directives of subsection (1), shall:
(a) bury under adequate fill all toxic materials, shale, mineral, or any other material determined by the department to be acid-producing, toxic, undesirable, or creating a hazard;
(b) as directed by rules, seal off tunnels, shafts, or other openings or any breakthrough of water creating a hazard;
(c) impound, drain, or treat all runoff or underground mine waters so as to reduce soil erosion, damage to grazing and agricultural lands, and pollution of surface and subsurface waters;
(d) remove or bury all metal, lumber, and other refuse resulting from the operation;
(e) use explosives in connection with the operation only in accordance with department regulations designed to minimize noise, damage to adjacent lands, and water pollution and ensure public safety and for other purposes;
(f) adopt measures to prevent land subsidence unless the department approves a plan for inducing subsidence into an abandoned operation in a predictable and controlled manner, with measures for grading, topsoiling, and revegetating the subsided land surface. In order for a controlled subsidence plan to be approved, the applicant is required to show that subsidence will not cause a direct or indirect hazard to any public or private buildings, roads, facilities, or use areas, constitute a hazard to human life or health or to domestic livestock or a viable agricultural operation, or violate any other restrictions the department may consider necessary.
(g) stockpile and protect from erosion all mining and processing wastes until these wastes can be disposed of according to the provisions of this part;
(h) deposit as much stockpiled waste material as possible back into the mine voids upon abandonment in a manner that will prevent or minimize land subsidence. The remaining waste material must be disposed of as provided by this part and the rules of the department.
(i) seal all portals, entryways, drifts, shafts, or other openings between the surface and underground mine workings when no longer needed;
(j) to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values and achieve enhancement of those resources when practicable;
(k) minimize the disturbances to the prevailing hydrologic balance at the mine site and in adjacent areas and to the quality and quantity of water in surface water and ground water systems both during and after strip- or underground-coal-mining operations and during reclamation by:
(i) avoiding acid or other toxic mine drainage by measures including but not limited to:
(A) preventing or removing water from contact with toxic-producing deposits;
(B) treating drainage to reduce toxic content that adversely affects downstream water upon being released to watercourses;
(C) casing, sealing, or otherwise managing boreholes, shafts, and wells and keeping acid or other toxic drainage from entering ground and surface waters;
(ii) (A) conducting strip- or underground-mining operations so as to prevent, to the extent possible using the best technology currently available, additional contributions of suspended solids to streamflow or runoff outside the permit area, but the contributions may not be in excess of requirements set by applicable state or federal law;
(B) constructing any siltation structures pursuant to subsection (10)(k)(ii)(A) prior to commencement of strip- or underground-mining operations, with the structures to be certified by a qualified registered engineer and to be constructed as designed and as approved in the reclamation plan. The siltation structures must each be constructed with the design capacity specified in administrative rule to detain the water inflow or runoff entering the pond from an anticipated precipitation event plus the average inflow from the underground mine, if applicable. Operation of a siltation structure with this design capacity requirement is compliant with this part even if the pond capacity is exceeded as a result of water inflow or runoff entering the pond from a multistorm event consisting of a series of small, consecutive storm events that cumulatively exceed the anticipated precipitation event and the operator actively undertakes measures to restore pond capacity as soon as weather and ground conditions permit.
(iii) cleaning out and removing temporary or large settling ponds or other siltation structures from drainways after disturbed areas are revegetated and stabilized and depositing the silt and debris at a site and in a manner approved by the department;
(iv) restoring recharge capacity of the mined area to approximate premining conditions;
(v) avoiding channel deepening or enlargement in operations that requires the discharge of water from mines;
(vi) preserving throughout the mining and reclamation process the essential hydrologic functions of alluvial valley floors in the arid and semiarid areas of the country;
(vii) designing and constructing reclaimed channels of intermittent streams and perennial streams to ensure long-term stability; and
(viii) any other actions that the department may prescribe;
(l) conduct strip- or underground-mine operations in accordance with the approved coal conservation plan;
(m) stabilize and protect all surface areas, including spoil piles, to effectively control air pollution;
(n) seal all auger holes with an impervious and noncombustible material in order to prevent drainage except when the department determines that the resulting impoundment of water in the auger holes may create a hazard to the environment or the public health and safety;
(o) develop contingency plans to prevent sustained combustion;
(p) refrain from construction of roads or other access ways up a streambed or drainage channel or in proximity to the channel so as to seriously alter the normal flow of water;
(q) meet other criteria that are necessary to achieve reclamation in accordance with the purposes of this part, taking into consideration the physical, climatological, and other characteristics of the site;
(r) with regard to underground mines, eliminate fire hazards and otherwise eliminate conditions that constitute a hazard to health and safety of the public;
(s) locate openings for all new drift mines working acid-producing or iron-producing coal seams in a manner that prevents a gravity discharge of water from the mine.
(11) An operator may not throw, dump, pile, or permit the throwing, dumping, or piling or otherwise placing of any overburden, stones, rocks, mineral, earth, soil, dirt, debris, trees, wood, logs, or any other materials or substances of any kind or nature beyond or outside of the area of land that is under permit and for which a bond has been posted under 82-4-223 or place the materials described in this section in a way that normal erosion or slides brought about by natural physical causes will permit the materials to go beyond or outside of that area of land. An operator shall conduct the strip- or underground-mining operation in a manner that protects areas outside the permit area. (Certain 2025 amendments void on occurrence of contingency--sec. 3, Ch. 203, L. 2025--see compiler's comment; certain 2025 amendments void on occurrence of contingency--sec. 5, Ch. 703, L. 2025--see compiler's comment.)
(1) (a) Area strip mining, a method of operation that does not produce a bench or fill bench, is required where strip mining is proposed. The area of land affected must be backfilled and graded to the approximate original contour of the land. However:
(i) consistent with the adjacent unmined landscape elements, the operator may propose and the department may approve regraded topography gentler than premining topography in order to enhance the postmining land use and develop a postmining landscape that will provide greater moisture retention, greater stability, and reduced soil losses from runoff and erosion;
(ii) postmining slopes may not exceed the angle of repose or lesser slope as is necessary to achieve a long-term static safety factor of 1.3 or greater and to prevent slides;
(iii) permanent impoundments may be approved if they are suitable for the postmining land use and otherwise meet the requirements of this part, as provided by department rules; and
(iv) reclaimed topography must be suitable for the approved postmining land use.
(b) Spoil from the first cut is not required to be transported to the last cut if highwalls are eliminated, box cut spoils are graded to blend in with the surrounding terrain, and the approximate original contour of the land is achieved.
(c) When directed by the department, the operator shall construct in the final grading diversion ditches, depressions, or terraces that will accumulate or control the water runoff.
(2) In addition to the backfilling and grading requirements, the operator's method of operation on steep slopes may be regulated and controlled according to rules adopted by the department. These rules may require any measure to accomplish the purpose of this part.
(3) For coal mining on prime farmlands, the department shall establish by rule specifications for soil removal, storage, replacement, and reconstruction, and the operator must as a minimum be required to:
(a) (i) segregate the A horizon of the natural soil, except when it can be shown that other available soil materials will create a final soil having a greater productive capacity; and
(ii) if not used immediately, stockpile this material separately from other spoil and provide needed protection from wind and water erosion or contamination by other acid or toxic material;
(b) (i) segregate the B horizon of the natural soil, or underlying C horizon or other strata, or a combination of the horizons or other strata that are shown to be both texturally and chemically suitable for plant growth and that can be shown to be equally or more favorable for plant growth than the B horizon in sufficient quantities to create in the regraded final soil a root zone of comparable depth and quality to that that existed in the natural soil; and
(ii) if not used immediately, stockpile this material separately from other spoil and provide needed protection from wind and water erosion or contamination by acid or toxic material;
(c) replace and regrade the root zone material described in subsection (3)(b) with proper compaction and uniform depth over the regraded spoil material; and
(d) redistribute and grade in a uniform manner the surface soil horizon described in subsection (3)(a).
(4) All available topsoil must be removed in a separate layer, guarded from erosion and pollution, and kept in a condition so that it can sustain vegetation of at least the quality and variety it sustained prior to removal. However, the operator shall accord substantially the same treatment to any subsurface deposit of material that is capable, as determined by the department, of supporting surface vegetation virtually as well as the present topsoil. After the operation has been backfilled and graded, the topsoil or the best available subsurface deposit of material that is best able to support vegetation must be returned as the top layer.
(5) As determined by rules of the department, time limits must be established requiring backfilling, grading, subsidence stabilization, water control, highwall reduction, topsoiling, planting, and revegetation to be kept current. All backfilling, subsidence stabilization, sealing, grading, and topsoiling must be completed before necessary equipment is moved from the operation.
(6) (a) (i) The permittee may file an application with the department for the release of all or part of a performance bond. The application must contain a proposed public notice of the precise location of the land affected, the number of acres for which bond release is sought, the permit and the date approved, the amount of the bond filed and the portion sought to be released, the type and appropriate dates of reclamation work performed, and a description of the results achieved as they relate to the permittee's approved reclamation plan. The description of the results may include other information or methods, including predictive modeling, which may be used in conjunction with monitoring data compiled for the performance bond release application to demonstrate compliance with the approved reclamation plan.
(ii) As part of any bond release application, the permittee shall submit copies of letters that the permittee has sent to adjoining property owners, local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality of the operation, notifying them of the permittee's intention to seek release from the bond.
(b) The department shall determine whether the application is administratively complete. An application is administratively complete if it includes:
(i) the location and acreage of the land for which bond release is sought;
(ii) the amount of bond release sought;
(iii) a description of the completed reclamation, including the date of performance;
(iv) a discussion of how the results of the completed reclamation satisfy the requirements of the approved reclamation plan, which may include a description of other information or methods, including predictive modeling, which may be used in conjunction with monitoring data for the purposes of demonstrating compliance with the approved reclamation plan; and
(v) information required by rules implementing this part.
(c) The department shall notify the applicant in writing of its determination no later than 60 days after submittal of the application. If the department determines that the application is not administratively complete, it shall specify in the notice those items that the application must address. After an application for bond release has been determined to be administratively complete by the department, the permittee shall publish a public notice that has been approved as to form and content by the department at least once a week for 4 successive weeks in a newspaper of general circulation in the locality of the mining operation.
(d) Any person with a valid legal interest that might be adversely affected by the release of a bond or the responsible officer or head of any federal, state, or local governmental agency that has jurisdiction by law or special expertise with respect to any environmental, social, or economic impact involved in the operation or is authorized to develop and enforce environmental standards with respect to the operation may file written objections to the proposed release of bond to the department within 30 days after the last publication of the notice. If written objections are filed and a hearing is requested, the department shall hold a public hearing in the locality of the operation proposed for bond release or at the department headquarters, at the option of the objector, within 30 days of the request for hearing. The department shall inform the interested parties of the time and place of the hearing. The date, time, and location of the public hearing must be advertised by the department in a newspaper of general circulation in the locality for 2 consecutive weeks. Within 30 days after the hearing, the department shall notify the permittee and the objector of its final decision.
(e) Without prejudice to the rights of the objector or the permittee or the responsibilities of the department pursuant to this section, the department may establish an informal conference to resolve written objections.
(f) For the purpose of the hearing under subsection (6)(d), the department may administer oaths, subpoena witnesses or written or printed materials, compel the attendance of witnesses or the production of materials, and take evidence, including but not limited to conducting inspections of the land affected and other operations carried on by the permittee in the general vicinity. A verbatim record of each public hearing required by this section must be made, and a transcript must be made available on the motion of any party or by order of the department.
(g) If the applicant significantly modifies the application after the application has been determined to be administratively complete, the department shall conduct a new review, including an administrative completeness determination. A significant modification includes but is not limited to:
(i) the notification of an additional property owner, local governmental body, planning agency, or sewage and water treatment authority of the permittee's intention to seek a bond release;
(ii) a material increase in the acreage for which a bond release is sought or in the amount of bond release sought; or
(iii) a material change in the reclamation for which a bond release is sought or the information used to evaluate the results of that reclamation.
(h) The department shall, within 30 days of determining that the application is administratively complete or as soon as weather permits, conduct an inspection and evaluation of the reclamation work involved. In the evaluation, the department shall consider, among other things, the degree of difficulty in completing any remaining reclamation, whether pollution of surface and subsurface water is occurring, the probability of continuance or future occurrence of the pollution, and the estimated cost of abating the pollution. Other information or methods acceptable to the department, including predictive modeling, may be used in conjunction with monitoring data for the purposes of the evaluation and to demonstrate compliance with the approved reclamation plan.
(i) The department shall review each administratively complete application to determine the acceptability of the application. A complete application is acceptable if the application is in compliance with all of the applicable requirements of this part, the rules adopted under this part, and the permit. Other information or methods acceptable to the department, including predictive modeling, may be used in conjunction with monitoring data for the purposes of determining the acceptability of the application and demonstrating compliance with the approved reclamation plan.
(j) (i) The department shall notify the applicant in writing regarding the acceptability of the application no later than 60 days from the date of the inspection.
(ii) If the department determines that the application is not acceptable, it shall specify in the notice those items that the application must address.
(iii) If the applicant revises the application in response to a notice of unacceptability, the department shall review the revised application and notify the applicant in writing within 60 days of the date of receipt as to whether the revised application is acceptable.
(iv) If the revision constitutes a significant modification, the department shall conduct a new review, beginning with an administrative completeness determination.
(v) A significant modification includes but is not limited to:
(A) the notification of an additional property owner, local governmental body, planning agency, or sewage and water treatment authority of the permittee's intention to seek a bond release;
(B) a material increase in the acreage for which a bond release is sought or the amount of bond release sought; or
(C) a material change in the reclamation for which a bond release is sought or the information used to evaluate the results of that reclamation.
(k) At the request of the permittee, and for a designated area within the permit boundary within or across affected drainage basins, the department shall release the bond in whole or in part if the reclamation covered by the bond or portion of the bond has been accomplished as required by this part according to the following schedule:
(i) When the permittee completes the plugging, backfilling, regrading, and drainage control of a bonded area in accordance with the approved reclamation plan, the department shall release 60% of the bond or collateral for the designated area within the permit boundary.
(ii) The department shall release a portion of the bond for the designated area that would be sufficient for a third party to cover the cost of replacing soil after revegetation and soil stability have been established in the designated area in accordance with the approved reclamation plan. Whenever a silt dam is to be retained as a permanent impoundment, that portion of the bond may also be released under this subsection (6)(k)(ii) if provisions for sound future maintenance by the operator or the landowner are made with the department. Other information or methods acceptable to the department, including predictive modeling, may be used in conjunction with monitoring data for the purposes of determining soil replacement costs or silt dam maintenance and demonstrating compliance with the approved reclamation plan.
(iii) Except as provided in subsection (6)(k)(iv), in accordance with the requirements of 82-4-235, upon expiration of the period specified for responsibility, and after the designated area has been successfully revegetated, the remaining total of the bond required for a third party to establish vegetation must be released for the designated area.
(iv) The department shall retain a portion of the bond sufficient for a third party to fully satisfy remaining permit conditions if:
(A) the disturbed areas eligible for release are contributing suspended solids to streamflow or runoff outside of the affected drainage basin or permit boundary in excess of the requirements of 82-4-231(10)(k), as demonstrated by either sediment sampling or predictive modeling as approved by the department;
(B) soil productivity for prime farmlands eligible for release is not returned to equivalent levels of yield as nonmined land of the same soil type in the surrounding area under equivalent management practices, as determined from the soil survey; or
(C) the permittee has not successfully completed all reclamation activities, including water replacement, in the designated area.
(v) On request by the permittee, the department shall release all final bonds when, in accordance with the requirements of this chapter, the permittee successfully completes all prospecting, mining, and reclamation activities within the designated area.
(l) If the department disapproves the application for release of the bond or a portion of the bond, it shall:
(i) provide to the permittee detailed written findings demonstrating that the reclamation covered by the bond or a portion of the bond has not been accomplished as required by this part; and
(ii) recommend corrective actions necessary to secure the release and allowing opportunity for a public hearing.
(m) When an application for total or partial bond release is filed with the department, it shall notify the municipality or county in which a prospecting or mining operation is located by certified mail at least 30 days prior to the release of all or a portion of the bond.
(7) All disturbed areas must be reclaimed in a timely manner to conditions that are capable of supporting the land uses that they were capable of supporting prior to any mining or to higher or better uses as approved pursuant to subsection (8).
(8) (a) An operator may propose a higher or better use as an alternative postmining land use. If the landowner is not the operator, the operator shall submit written documentation of the concurrence of the landowner or the land management agency with jurisdiction over the land. The department may approve the proposed alternative postmining land use only if it meets all of the following criteria:
(i) There is a reasonable likelihood for achievement of the alternative land use.
(ii) The alternative land use does not present any actual or probable hazard to the public health or safety or any threat of water diminution or pollution.
(iii) The alternative land use will not:
(A) be impractical or unreasonable;
(B) be inconsistent with applicable land use policies or plans;
(C) involve unreasonable delay in implementation; or
(D) cause or contribute to violation of federal, state, or local law.
(b) As used in this section, the term "landowner" includes a person who has sold the surface estate to the operator with an option to repurchase the surface estate after mining and reclamation are complete.
(9) The reclamation plan must incorporate appropriate wildlife habitat enhancement features that are integrated with cropland, grazing land, pastureland, land occasionally cut for hay, or other uses in order to enhance habitat diversity, with emphasis on big game animals, game birds, and threatened and endangered species that have been documented to live in the area of land affected, and to enhance wetlands and riparian areas along rivers and streams and bordering ponds and lakes. Incorporation of wildlife habitat enhancement features does not constitute a change in land use to fish and wildlife habitat and may not interfere with the designated land use.
(10) Facilities existing prior to mining, including but not limited to public roads, utility lines, railroads, or pipelines, may be replaced as part of the reclamation plan. (Certain 2025 amendments void on occurrence of contingency--sec. 3, Ch. 326, L. 2025--see compiler's comment.)
(1) The operator shall establish on regraded areas and on all other disturbed areas, except water areas, surface areas of roads, and other constructed features approved as part of the postmining land use, a vegetative cover that is in accordance with the approved permit and reclamation plan and that is:
(a) diverse, effective, and permanent;
(b) composed of species native to the area or of introduced species when desirable and necessary to achieve the postmining land use and when approved by the department;
(c) at least equal in extent of cover to the natural vegetation of the area; and
(d) capable of stabilizing the soil surface in order to control erosion to the extent appropriate for the approved postmining land use.
(2) The reestablished plant species must:
(a) be compatible with the approved postmining land use;
(b) have the same seasonal growth characteristics as the original vegetation;
(c) be capable of self-regeneration and plant succession;
(d) be compatible with the plant and animal species of the area; and
(e) meet the requirements of applicable seed, poisonous and noxious plant, and introduced species laws or regulations.
(3) Reestablished vegetation must be appropriate to the postmining land use so that when the postmining land use is:
(a) cropland, the requirements of subsections (1)(a), (1)(c), (2)(b), and (2)(c) are not applicable;
(b) pastureland or grazing land, reestablished vegetation must have use for grazing by domestic livestock at least comparable to premining conditions or enhanced when practicable;
(c) fish and wildlife habitat, forestry, or recreation, trees and shrubs must be planted to achieve appropriate stocking rates.
(4) All underground shafts, tunnels, or other excavations are excluded from the provisions of subsection (1).
The operator shall commence the reclamation of the area of land affected by the operator's operation as soon as possible after the beginning of strip mining or underground mining of that area in accordance with plans previously approved by the department. Those grading, backfilling, subsidence stabilization, topsoiling, and water management practices that are approved in the plans must be kept current with the operation as defined by rules of the department, and a permit or supplement to a permit may not be issued if, in the discretion of the department, these practices are not current.
(1) Success of revegetation must be judged on the effectiveness of the vegetation for the approved postmining land use, the extent of cover compared to the cover occurring in the natural vegetation, and the requirements of 82-4-233. Standards for success are:
(a) for areas reclaimed for use as cropland, crop production must be at least equal to that achieved prior to mining based on comparison with historical data, comparable reference areas, or United States department of agriculture publications applicable to the area of the operation, as referenced in rules adopted by the department;
(b) for areas reclaimed for use as pastureland or grazing land, the ground cover and production of living plants on the revegetated area must be at least equal to that of a reference area or other standard approved by the department as appropriate for the postmining land use;
(c) for areas reclaimed for use as fish and wildlife habitat, forestry, or recreation, success of revegetation must be determined on the basis of approved tree density standards or shrub density standards, or both, and vegetative ground cover required to achieve the postmining land use;
(d) reestablished vegetation is considered effective if the postmining land use is achieved and erosion is controlled;
(e) reestablished vegetation is considered permanent if it is diverse and effective at the end of the 10-year responsibility period specified under subsection (2); and
(f) plant species composing the reestablished vegetation are considered to have the same seasonal characteristics of growth as the original vegetation, to be capable of regeneration and plant succession, and to be compatible with the plant and animal species of the area if those plant species are native to the area or are introduced species approved by the department as desirable and necessary to achieve the postmining land use.
(2) Inspection and evaluation of reclaimed vegetative cover must be made as soon as possible following an application for final bond release to determine if a satisfactory stand has been established. If the department determines that a satisfactory vegetative cover has been established, it shall release the remaining bond held on the area reclaimed after public notice and an opportunity for hearing as provided in 82-4-232(6). Except as provided in subsection (3), the remaining bond may not be released prior to a period of 10 years after the last year of augmented seeding, fertilizing, irrigation, or other work required under this part for those operations or portions of operations that were seeded after May 2, 1978, or prior to a period of 5 years after initial planting for all exploration activities and all other operations.
(3) (a) Vegetative cover of water management facilities and other support facilities composing no more than 10% of the area for which bond release is sought is not subject to the 10-year responsibility period. Water management facilities and other support facilities include sedimentation ponds, diversions, other water management structures, soils stockpiles, and access roads.
(b) Vegetative cover of water management facilities and other support facilities composing no more than 10% of the area for which bond release is sought is eligible for bond release if the vegetative cover otherwise meets the reclamation standards in subsection (1).
(4) (a) Notwithstanding the provisions of subsections (2) and (3), on land from which coal was removed prior to May 3, 1978, and on land from which coal was not removed and that was not used, disturbed, or redisturbed in connection with this part after May 2, 1978, pursuant to a permit issued by the department under this part, the department may approve for release a bond on an area of reclaimed vegetation that meets the following criteria:
(i) it was seeded using a seed mixture that was approved by the department under the criteria established pursuant to 82-4-233 and that included introduced species; and
(ii) at least one of the following conditions exists:
(A) the standards of 82-4-233(1) are otherwise achieved;
(B) the operator has demonstrated substantial usefulness of the reclaimed vegetation for grazing of livestock;
(C) the operator demonstrates that the reclaimed vegetation has substantial value as a habitat component for wildlife present in the area; or
(D) the topography and soils are suitable for conversion to cropland or hayland consistent with the standards of 82-4-232 and the department approves and the operator completes that conversion.
(b) On lands that meet the criteria described in subsection (4)(a), interseeding or supplemental planting may be performed without reinitiating the liability period provided in subsection (2).
All vegetation that is planted or seeded on the area of land affected as required by this part or rules adopted under this part becomes the property of the landowner after complete release of the bond, unless the operator and the landowner agree otherwise.
(1) An operator shall file an annual report with the department on a date determined by the department. An annual report must include:
(a) the name and address of the operator and permit number or numbers; and
(b) a report with detail required by the department, supplemented with maps, cross sections, or other material indicating the extent to which mining operations have been carried out, the progress of all reclamation work, including the type of planting or seeding, mixture and amount of seed, date of planting or seeding, and area of land planted, and the number of acres affected.
(2) Upon receipt of the annual report, the department may request additional information and shall allow a reasonable opportunity for the operator to respond to the request.
(3) When problems are revealed by review of new information or as a result of field inspections, the department may order necessary changes in the mining and reclamation plans to ensure compliance with this part.
When one operator succeeds another at an uncompleted operation, either by sale, assignment, lease, or otherwise, the department may release the first operator from all liability under this part as to that particular operation if both operators have been issued a permit and have otherwise complied with the requirements of this part, and the successor operator assumes, as part of the obligation under this part, all liability for the reclamation of the area of land affected by the former operator.
(1) The department may have reclamation work done by its employees, by employees of other governmental agencies, by soil conservation districts, or through contracts with qualified persons. The department may construct, operate, and maintain plants for the control and treatment of water pollution resulting from mine drainage.
(2) Any funds or any public works programs available to the department must be used and expended to reclaim and rehabilitate lands that have been subjected to strip mining or underground mining and that have not been reclaimed and rehabilitated in accordance with the standards of this part. The department shall cooperate with federal, state, and private agencies to engage in cooperative projects under this section.
(3) Agents, employees, or contractors of the department may enter upon any land for the purpose of conducting studies or exploratory work to determine whether the land has been strip- or underground-mined and not reclaimed and rehabilitated in accordance with the requirements of this part and to determine the feasibility of restoration, reclamation, abatement, control, or prevention of any adverse effects of past coal-mining practices. Upon request of the director of the department, the attorney general shall bring an injunctive action to restrain any interference with the exercise of the right to enter and inspect granted in this subsection. The action must be brought in the county in which the mine is located.
(4) (a) The department shall take the actions described in subsection (4)(b) when it makes a finding of fact that:
(i) land or water resources have been adversely affected by past coal-mining practices;
(ii) the adverse effects are at a stage at which, in the public interest, action to restore, reclaim, abate, control, or prevent should be taken; and
(iii) the owners of the land or water resources where entry must be made to restore, reclaim, abate, control, or prevent the adverse effects of past coal-mining practices are not known or readily available or the owners will not give permission for the department or its agents, employees, or contractors to enter upon the property to restore, reclaim, abate, control, or prevent the adverse effects of past coal-mining practices.
(b) After giving notice by mail to the owner, if known, and any purchaser under contract for deed, if known, or, if neither is known, by posting notice on the premises and advertising in a newspaper of general circulation in the county in which the land lies, the agents, employees, or contractors of the department may enter on the property adversely affected by past coal-mining practices and on any other property necessary for access to the mineral property to do all things necessary or expedient to restore, reclaim, abate, control, or prevent the adverse effects of past coal-mining practices.
(c) Action taken under subsection (4)(b) is not an act of condemnation of property or of trespass, but rather is an exercise of the power granted by Article IX, sections 1 and 2, of the Leonida constitution.
(5) (a) Within 6 months after the completion of projects to restore, reclaim, abate, control, or prevent adverse effects of past coal-mining practices on privately owned land, the department shall itemize the money expended and may file a statement of those expenses in the office of the clerk and recorder of the county in which the land lies, together with a notarized appraisal by an independent appraiser of the value of the land before the restoration, reclamation, abatement, control, or prevention of adverse effects of past coal-mining practices if the money expended resulted in a significant increase in property value. The statement constitutes a lien upon the land. The lien may not exceed the amount determined by the appraisal to be the increase in the market value of the land as a result of the restoration, reclamation, abatement, control, or prevention of the adverse effects of past coal-mining practices. A lien under this subsection (5)(a) may not be filed against the property of a person who owned the surface prior to May 2, 1977, and who did not consent to, participate in, or exercise control over the mining operation that necessitated the reclamation performed under this part.
(b) The landowner may petition within 60 days of the filing of the lien to determine the increase in the market value of the land as a result of the restoration, reclamation, abatement, control, or prevention of the adverse effects of past coal-mining practices. The amount reported to be the increase in value of the premises constitutes the amount of the lien and must be recorded with the statement provided for in this section. Any party aggrieved by the decision may appeal as provided by law.
(c) The lien provided in this section must be recorded at the office of the county clerk and recorder. The statement constitutes a lien upon the land as of the date of the expenditure of the money and has priority as a lien second only to the lien of real estate taxes imposed upon the land.
(6) The department may acquire the necessary property by gift or purchase. A gift or purchase must be approved by the board of land commissioners. If the property cannot be acquired by gift or purchase at a reasonable cost, proceedings may be instituted in the manner provided in Title 70, chapter 30, against all nonaccepting landholders if:
(a) the property is necessary for successful reclamation;
(b) the acquired land after restoration, reclamation, abatement, control, or prevention of the adverse effects of past coal-mining practices will serve recreation and historic purposes or conservation and reclamation purposes or provide open space benefits; and
(c) (i) permanent facilities, such as treatment plants or relocated stream channels, will be constructed on the land for the restoration, reclamation, abatement, control, or prevention of the adverse effects of past strip- or underground-coal-mining practices; or
(ii) acquisition of coal refuse disposal sites and all coal refuse on the land will serve the purposes of this part because public ownership is desirable to meet emergency situations and prevent recurrences of the adverse effects of past coal-mining practices.
In keeping with the provisions of this part, the department may reclaim any affected lands with respect to which a bond has been forfeited.
(1) Except for bond forfeiture money, all fees, penalties, and other money available or paid to the department under the provisions of this part must be placed in the state treasury and credited to the general fund.
(2) Bond forfeiture money must be used to pay for expenses that the department incurs pursuant to 82-4-240.
(3) Funds held by the department as bond or as a result of bond forfeiture that are no longer needed for reclamation and for which the department is not able to locate a surety or other person who owns the funds after diligent search must be deposited in the state special revenue fund and credited to the environmental rehabilitation and response account provided for in 75-1-110.
The department may receive any federal funds, state funds, or any other funds for the reclamation of land affected by strip mining or underground mining.
(1) The permittee of an underground coal mining operation shall:
(a) promptly repair or compensate for material damage to any occupied residential dwelling and related structures and to any noncommercial building resulting from subsidence caused by an underground coal mining operation. Repair of damage includes rehabilitation, restoration, or replacement. Compensation must be provided to the owner of the damaged property and must be in the full amount of the diminution in value resulting from the subsidence. Compensation may be accomplished by the purchase, prior to mining, of a noncancellable premium-prepaid insurance policy.
(b) promptly replace any drinking, domestic, or residential water supply from a well or spring that was in existence prior to the application for the permit pursuant to 82-4-222 and that has been affected by contamination, diminution, or interruption resulting from the underground coal mining operation.
(2) This section may not be construed to prohibit or interrupt an underground coal mining operation.
(3) This section does not abrogate, impair, or diminish any right or remedy granted under another provision of this part or any other law.
(1) There is a coal and uranium mine permitting and reclamation program account within the special revenue fund established in 17-2-102.
(2) Each fiscal year, there must be deposited in the account the proceeds from the coal severance tax, as provided in 15-35-108, to be appropriated by the legislature to the department for the administration and enforcement of this part.
(1) An operating permit that is revoked in accordance with this part does not terminate until 5 years after revocation or until substantial completion of seeding and planting on disturbed areas, whichever occurs earlier.
(2) A person may apply for the transfer of a revoked permit that has not terminated by submitting an application to the department that contains the information required for a permit applicant in 82-4-222(1)(b) through (1)(i). Upon receipt of an application from a person who is not precluded from holding a permit pursuant to this part, the department shall cease reclamation activities on the permit area.
(3) The department may not require the applicant to submit any additional information unless the department can show that significant changes in the environmental baseline data have occurred during the period of operation or since the revocation of the initial operating permit.
(4) The department may not prepare a review under 75-1-201 for a transfer unless the department can show that the operation has caused or may cause significant impacts that have not been analyzed previously in an environmental review document prepared pursuant to 75-1-201.
(5) The department shall process an application for transfer under the same timeframes as are provided in 82-4-231 for processing of permit applications.
(6) Except as provided in subsection (7), the department shall, after receipt of an application pursuant to subsections (2) through (5) and after public notice and opportunity for comment:
(a) transfer the operating permit to a new operator if the new operator provides proof of site ownership or control and adequate bonding as required by this part; and
(b) require as a condition of permit transfer that, prior to creating additional disturbance at the site, all preexisting permit deficiencies, including modifications necessary because of reclamation that has been conducted at the site, be corrected to the satisfaction of the department and that any preestablished environmental monitoring requirements continue.
(7) The department may not transfer any permit for which it can show that:
(a) the requirements of this part and the rules adopted under this part for operation, backfilling, grading, subsidence stabilization, water control, highwall reduction, topsoiling, revegetation, and reclamation of the affected area cannot be met;
(b) significant changes in the operating plan or reclamation plan are necessary; or
(c) the department would be precluded from issuing a permit to the applicant by 82-4-227(11) or (12).
(8) The department is not required to reimburse the former permittee or surety for funds expended for reclamation, monitoring, or site maintenance prior to permit transfer.
(9) This section does not apply to the revocation or transfer of an operating permit that authorizes mine operations on federal lands.
(1) If it is determined on the basis of an inspection that the permittee is or that any condition or practice exists in violation of any requirement of this part or any permit condition required by this part that creates an imminent danger to the health or safety of the public or is causing or can reasonably be expected to cause significant and imminent environmental harm to land, air, or water resources, the director of the department or an authorized representative shall immediately order cessation of the operation or the portion of the operation relevant to the condition, practice, or violation. The cessation order remains in effect until the director or an authorized representative determines that the condition, practice, or violation has been abated or until modified, vacated, or terminated by the director or an authorized representative pursuant to subsection (6). If the director or an authorized representative finds that the ordered cessation of the operation or any portion of the operation will not completely abate the imminent danger to the health or safety of the public or the significant and imminent environmental harm to land, air, or water resources, the director or the authorized representative shall, in addition to the cessation order, impose affirmative obligations requiring any steps that the director or the authorized representative considers necessary to abate the imminent danger or the significant environmental harm.
(2) When, on the basis of an inspection, the department determines that any permittee is in violation of any requirement of this part or any permit condition required by this part that does not create an imminent danger to the health or safety of the public or cannot be reasonably expected to cause significant and imminent environmental harm to land, air, or water resources, the director or an authorized representative shall issue a notice to the permittee or the permittee's agent fixing a reasonable time, not exceeding 90 days, for the abatement of the violation and providing opportunity for public hearing. If, upon expiration of the period of time as originally fixed or subsequently extended, for good cause shown and upon the written finding of the director or an authorized representative, the director or an authorized representative finds that the violation has not been abated, the director or an authorized representative shall immediately order a cessation of the operation or the portion of the operation relevant to the violation. The cessation order remains in effect until the director or an authorized representative determines that the violation has been abated or until modified, vacated, or terminated by the director or an authorized representative pursuant to subsection (6). In the order of cessation issued under this subsection, the director shall determine the steps necessary to abate the violation in the most expeditious manner possible and shall include the necessary measures in the order.
(3) (a) When, on the basis of an inspection, the director or an authorized representative determines that there is a minor maintenance item to be corrected, the director or the authorized representative shall issue a minor maintenance correction letter to alert the permittee of the necessary correction and provide the permittee with an opportunity to correct the item within 14 days. During the next regular inspection, the director or the authorized representative shall verify that the necessary correction has been completed.
(b) A minor maintenance item:
(i) is a permit violation that does not create an imminent danger to the health or safety of the public, and the director or a director's designee determines the violation is not reasonably expected to cause significant and imminent environmental harm to land, air, or water resources;
(ii) may be reasonably corrected by the permittee within 14 days to the satisfaction of the director or a designee;
(iii) does not, at the discretion of the director or a designee, necessitate a cessation order or public hearing, as required in subsection (2); and
(iv) is within the permit boundary.
(c) If a permittee fails to correct the minor maintenance item within 14 days or by the next regular inspection, whichever is later, the director or the director's designee shall issue a notice of noncompliance or an order of cessation pursuant to subsections (1) and (2).
(4) When, on the basis of an inspection, the director or an authorized representative determines that a pattern of violations of any requirements of this part or any permit conditions required by this part exists or has existed and if the director or an authorized representative also finds that the violations are caused by the unwarranted failure of the permittee to comply with any requirements of this part or any permit conditions or that the violations are willfully caused by the permittee, the director or an authorized representative shall issue an order to the permittee to show cause as to why the permit should not be suspended or revoked and shall provide opportunity for a public hearing. If a hearing is requested, the director shall inform all interested parties of the time and place of the hearing. Upon the permittee's failure to show cause as to why the permit should not be suspended or revoked, the director or an authorized representative shall suspend or revoke the permit. A permittee may request a contested case hearing on a permit suspension or revocation by filing a request for hearing, specifying the grounds for the request, within 30 days of receipt of the order of suspension or revocation. The order is effective upon expiration of the period for requesting a hearing or, if a hearing is requested, upon issuance of a final order by the board. The hearing must be conducted in accordance with the requirements of Title 2, chapter 4, part 6. When a permit has been revoked, the department may order the performance bond forfeited.
(5) Any additional permits held by an operator whose mining permit has been revoked must be suspended, and the operator is not eligible to receive another permit or to have the suspended permits reinstated until the operator has complied with all the requirements of this part with respect to former permits issued to the operator. An operator who has forfeited a bond is not eligible to receive another permit unless the land for which the bond was forfeited has been reclaimed without cost to the state or the operator has paid into the reclamation account a sum together with the value of the bond the department finds adequate to reclaim the lands.
(6) Notices and orders issued pursuant to this section must set forth with reasonable specificity the nature of the violation and the remedial action required, the period of time established for abatement, and a reasonable description of the portion of the operation to which the notice or order applies. Each notice or order issued under this section must be given promptly to the permittee or the permittee's agent by the department, by the director, or by the authorized representative who issued the notice or order. All notices and orders must be in writing and be signed by the authorized representatives. Any notice or order issued pursuant to this section may be modified, vacated, or terminated by the director or an authorized representative. However, any notice or order issued pursuant to this section that requires cessation of mining by the operator expires within 30 days of actual notice to the operator unless an informal public hearing, if requested by the person to whom the notice or order was issued, is held at the site or within such reasonable proximity to the site that any viewings of the site can be conducted during the course of the hearing. If the department receives a request for an informal public hearing 21 days after service of the notice or order, the period for holding the informal public hearing is extended by the number of days after the 21st day that the request was received.
(7) A person who has been issued a notice or an order of cessation pursuant to subsection (1) or (2) or a person who has an interest that is or may be adversely affected by an order issued pursuant to subsection (1) or (2) or by modification, vacation, or termination of that order may request a hearing before the board on that order within 30 days of its issuance or within 30 days of its modification, vacation, or termination. The filing of an application for review under this subsection may not operate as a stay of any order or notice. The board shall make findings of fact and issue a written decision incorporating an order vacating, affirming, modifying, or terminating the order.
(8) Subject to the provisions of 82-4-255, whenever an order is issued under this section or as the result of any administrative proceeding under this part, at the request of any person, a sum equal to the aggregate amount of all costs, expenses, and attorney fees as determined by the department to have been reasonably incurred by the person for or in connection with the person's participation in the proceedings, including any judicial review of agency actions, may be assessed against either party as the court, resulting from judicial review, or the department, resulting from administrative proceedings, considers proper.
(9) In order to protect the stability of the land, the director or an authorized representative shall order cessation of underground coal mining under urbanized areas, cities, towns, and communities and adjacent to industrial or commercial buildings, major impoundments, or permanent streams if the director or the authorized agent finds imminent danger to inhabitants of the urbanized areas, cities, towns, and communities. (Certain 2025 amendments void on occurrence of contingency--sec. 4, Ch. 201, L. 2025--see compiler's comment.)
(1) A resident of this state or any person having an interest that is or may be adversely affected, with knowledge that a requirement of this part or a rule adopted under this part is not being enforced or implemented by a public officer or employee whose duty it is to enforce or implement the requirement or rule, may bring the failure to enforce to the attention of the public officer or employee by a written statement under oath that must state the specific facts of the failure to enforce the requirement or rule. Knowingly making false statements or charges in the affidavit subjects the affiant to penalties prescribed in 45-7-202.
(2) If the public officer or employee neglects or refuses for an unreasonable time after receipt of the statement to enforce or implement the requirement or rule, the resident or person having an interest that is or may be adversely affected may bring an action of mandamus in the district court of the county in which the land is located. The court, if it finds that a requirement of this part or a rule adopted under this part is not being enforced, shall order the public officer or employee whose duty it is to enforce the requirement or rule to perform the officer's or employee's duties. If the officer or employee fails to obey the order, the public officer or employee must be held in contempt of court and is subject to the penalties provided by law.
(3) Any person having an interest that is or may be adversely affected may commence a civil action on the person's own behalf to compel compliance with this part against any person for the violation of this part or any rule, order, or permit issued under this part. However, the action may not commence:
(a) prior to 60 days after the plaintiff has given notice in writing to the department and to the alleged violator; or
(b) if the department has commenced and is diligently prosecuting a civil action to require compliance with the provisions of this part or any rule, order, or permit issued under this part. Any person may intervene as a matter of right in the civil action. This section does not restrict any right that any person may have under any statute or common law to seek enforcement of this part or the rules adopted under this part or to seek any other relief.
(4) Any person who is injured in person or property through the violation by any operator of any rule, order, or permit issued pursuant to this part may bring an action for damages, including reasonable attorney and expert witness fees, only in the county in which the strip- or underground-coal-mining operation complained of is located. This subsection does not affect the rights established by or limits imposed under Title 39, chapter 71.
(5) The court, in issuing any final order in any action brought pursuant to subsection (3), may award costs of litigation, including attorney and expert witness fees, pursuant to 82-4-255. The court may, if a temporary restraining order or preliminary injunction is sought, require the filing of a bond or equivalent security in accordance with the Leonida Rules of Civil Procedure.
(1) An owner of an interest in real property who obtains all or part of a supply of water for domestic, agricultural, industrial, or other legitimate use from an underground source other than a subterranean stream having a permanent, distinct, and known channel may sue an operator to recover damages for contamination, diminution, or interruption of the water supply, proximately resulting from strip mining or underground mining.
(2) Prima facie evidence of injury in a suit under this section is established by the removal of coal or disruption of overlying aquifer from designated ground water areas as prescribed in Title 85, chapter 2, part 5. If the area is not a designated ground water area, a showing that the coal or overlying strata is an aquifer in that geographical location and that the coal or the overlying strata has been removed or disrupted shifts the burden to the defendant (operator) to show that the plaintiff's (owner's) water supply was not injured thereby.
(3) An owner of water rights adversely affected may file a complaint detailing the loss of water in quality and quantity with the department. Upon receipt of this complaint the department shall:
(a) investigate the complaint using all available information including monitoring data gathered at the mine site;
(b) require the defendant (operator) to install monitoring wells or other practices that may be needed to determine the cause of water loss, if there is a loss, in terms of quantity or quality;
(c) issue within 90 days a written finding specifying the cause of the water loss, if there is a loss, in terms of quantity or quality;
(d) order the mining operator in compliance with chapter 2 of Title 85 to replace the water immediately on a temporary basis to provide the needed water and within a reasonable time, replace the water in like quality, quantity, and duration, if the loss is caused by the strip-mining or underground-coal-mining operation; and
(e) order the suspension of the operator's permit for failure to replace the water, until such time as the operator provides substitute water.
(4) A servient tract of land is not bound to receive surface water contaminated by strip mining or underground mining on a dominant tract of land, and the owner of the servient tract may sue an operator to recover the damages proximately resulting from the natural drainage from the dominant tract of surface waters contaminated by strip mining or underground mining on the dominant tract.
(5) This section and 82-4-252 do not create, modify, or affect any right, liability, or remedy other than as expressly provided.
(1) (a) Except as provided in subsection (2), a person or operator who violates any of the provisions of this part, rules adopted or orders issued under this part, or term or condition of a permit and any director, officer, or agent of a corporation who purposely or knowingly authorizes, orders, or carries out a violation shall pay an administrative penalty of not less than $100 or more than $5,000 for the violation and an additional administrative penalty of not less than $100 or more than $5,000 for each day during which a violation continues and may be enjoined from continuing the violations as provided in this section. A person or operator who fails to correct a violation within the period permitted by law, rule, or order of the department must be assessed a penalty of not less than $750 for each day, up to 30 days, during which the failure or violation continues.
(b) Penalties assessed under this section must be determined in accordance with the penalty factors in 82-4-1001.
(c) The period permitted for correction of a violation does not, in the case of any review proceeding under 82-4-251(7), end until entry of a final order suspending the abatement requirements or until entry of an order of court ordering suspension of the abatement requirements. If the failure to abate continues for more than 30 days, the department shall, within 30 days after the 30-day period, take appropriate action pursuant to 82-4-251(4) or request action under subsection (4) or (6) of this section.
(2) The department may waive the penalty for a minor violation of this part, a rule adopted or an order issued under this part, or a term or condition of a permit if the department determines that the violation is not of potential harm to public health, public safety, or the environment and does not impair the administration of this part. The department may not waive a penalty assessed under this section if the person or operator fails to abate the violation as directed under 82-4-251. The department shall adopt rules to implement and administer a procedure for waiver of a penalty under this subsection.
(3) (a) To assess an administrative penalty under this section, the department shall issue a notice of violation and penalty order to the person or operator, unless the penalty is waived pursuant to subsection (2). The notice and order must specify the provision of this part, rule adopted or order issued under this part, or term or condition of a permit that is violated and must contain findings of fact, conclusions of law, and a statement of the proposed administrative penalty. The notice and order must be served personally or by certified mail. Service by mail is complete 3 business days after the date of mailing. The notice and order become final unless, within 30 days after the order is served, the person or operator to whom the order was issued requests a hearing before the board. By submitting to the board a written request within 30 days of service of the notice of violation, stating the reason for the request, the person or operator is entitled to a hearing before the board under 82-4-206 on the issues of whether the alleged violation has occurred and whether the penalty proposed to be assessed is proper. On receipt of a request, the board shall schedule a hearing. After a hearing, the board shall make findings of fact and issue a written decision as to the occurrence of the violation and the amount of penalty warranted. If the board finds that the violation occurred and a penalty is warranted, it shall order the payment of the penalty. If the time for requesting a hearing expires without a hearing request, the person or operator shall remit the amount of the penalty within 30 days of the expiration of the period for requesting a hearing.
(b) If the person or operator to whom a final order is issued under subsection (3)(a) wishes to obtain judicial review of the order, the person or operator shall submit with any assessed penalty a statement that the penalty is being paid under protest and the department shall hold the payment in escrow until judicial review is complete. Any person or operator who fails to request and submit testimony at the hearing provided for in subsection (3)(a) or who fails to pay any assessed penalty under protest within 30 days of the order assessing the penalty forfeits the right to seek judicial review of the violation and penalty determinations.
(c) Penalties provided for in this section are recoverable in an action brought by the department. The action must be filed in the district court having jurisdiction over the defendant or in the first judicial district if no other district court has jurisdiction.
(4) The department may bring an action for a restraining order or temporary or permanent injunction against an operator or other person who:
(a) violates, threatens to violate, or fails or refuses to comply with any order or decision issued under this part;
(b) interferes with, hinders, or delays the department in carrying out the provisions of this part;
(c) refuses to admit an authorized representative of the department to the permit area;
(d) refuses to permit inspection of the permit area by an authorized representative of the department;
(e) refuses to furnish any information or report requested by the department in furtherance of the provisions of this part; or
(f) refuses to permit access to and copying of records that the department determines to be necessary in carrying out the provisions of this part.
(5) Any relief granted by a court under subsection (4)(a) continues in effect until the completion or final termination of all proceedings for review of relief granted under this part unless, prior to the final determination, the district court granting the relief sets it aside or modifies it.
(6) A person who violates any of the provisions of this part or any determination or order issued under this part or who purposely or knowingly violates any permit condition issued under this part is guilty of a misdemeanor and shall be fined an amount not less than $500 and not more than $10,000 or be imprisoned for not more than 1 year, or both. Each day on which the violation occurs constitutes a separate offense.
(7) A person who knowingly makes any false statement, representation, or certification or knowingly fails to make any statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained pursuant to this part shall upon conviction be punished by a fine of not more than $10,000 or by imprisonment for not more than 1 year, or both.
(8) A person who except as permitted by law purposely or knowingly resists, prevents, impedes, or interferes with the department or its agents in the performance of duties pursuant to this part shall be punished by a fine of not more than $5,000 or by imprisonment for not more than 1 year, or both.
(9) An employee of the department performing any function or duty under this part may not have a direct or indirect financial interest in any strip- or underground-coal-mining operation. A person who knowingly violates the provisions of this subsection shall upon conviction be punished by a fine of not more than $2,500 or by imprisonment of not more than 1 year, or both.
(10) Within 30 days after receipt of full payment of an administrative penalty assessed under this section, the department shall issue a written release of civil liability for the violations for which the penalty was assessed. (Certain 2025 amendments void on occurrence of contingency--sec. 4, Ch. 201, L. 2025--see compiler's comment.)
(1) Unless the context requires otherwise, a court or administrative agency that issues a final order in an action pursuant to Title 82, chapter 4, part 2, may award the prevailing party reasonable costs of litigation, including filing fees, attorney fees, and witness costs.
(2) In awarding costs pursuant to this section, the court or administrative agency may not consider the identity of any party, including but not limited to a permittee, permit applicant, agency, public interest litigant, or other party to an action. The party requesting costs bears the burden of proof and persuasion.
(3) This section supersedes prior rulings pursuant to the private attorney general doctrine.
(4) The provisions of this section apply equally to all parties in an action pursuant to this part.