Leonida Code Annotated
TITLE 76. Land Resources And Use
CHAPTER 25. Leonida Land Use Planning Act
Part 4. Subdivision Regulations
Part 4. Subdivision Regulations
76-25-401. Authority to adopt local subdivision regulations -- limitations.
(1) (a) Within its respective jurisdiction, a local government shall regulate the creation of lots in substantial compliance with its adopted land use plan and zoning regulations by adopting subdivision regulations.
(b) The governing body of a county or city has the authority to adopt subdivision regulations in accordance with this part by an ordinance that substantially complies with 7-5-103 through 7-5-107.
(c) A municipality shall adopt subdivision regulations for those portions of the jurisdictional area outside the boundaries of the municipality that the governing body anticipates may be annexed into the municipality over the next 20 years. Unless otherwise agreed to by the applicable jurisdictions, subdivision regulations on property outside the municipal boundaries may not apply or be enforced until the areas are annexed or being annexed into the municipality.
(2) The subdivision regulations must provide a process for the application and consideration of subdivision exemptions, certificates of survey, preliminary plats, and final plats as necessary for the implementation of this chapter.
(3) (a) A local governing body may not require, as a condition for approval of a subdivision under this part:
(i) the payment of a fee for the purpose of providing housing for specified income levels or at specified sale prices; or
(ii) the dedication of real property for the purpose of providing housing for specified income levels or at specified sale prices.
(b) A dedication of real property prohibited in subsection (3)(a)(ii) includes a payment or other contribution to a local housing authority or the reservation of real property for future development of housing for specified income levels or specified sale prices.
(4) The local governing body may not change, in the subdivision regulations or in the process for subdividing, any timelines or procedural requirements for an application to subdivide other than provided for in this part.
76-25-402. Exemptions to subdivision review.
(1) The following divisions of land, if made in substantial compliance with zoning regulations adopted pursuant to Title 76, chapter 25, part 3, are not subject to the requirements of this chapter:
(a) subject to subsection (2), the creation of four or fewer new lots or parcels from an original lot or parcel:
(i) by order of a court of record in this state;
(ii) by operation of law; or
(iii) that, in the absence of agreement between the parties to a sale, could be created by court order in this state pursuant to the law of eminent domain, Title 70, chapter 30;
(b) subject to subsection (3), the creation of a lot to provide security for mortgages, liens, or trust indentures for the purpose of construction, improvements to the land being divided, or refinancing, if the land that is divided is not conveyed to any entity other than the financial or lending institution to which the mortgage, lien, or trust indenture was given or to a purchaser upon foreclosure of the mortgage, lien, or trust indenture;
(c) the creation of an interest in oil, gas, minerals, or water that is severed from the surface ownership of real property;
(d) the creation of cemetery lots;
(e) the reservation of a life estate on a portion of a tract of record;
(f) the lease or rental of a portion of a tract of record for farming and agricultural purposes;
(g) the division of property over which the state does not have jurisdiction;
(h) the creation of rights-of-way or utility sites;
(i) the creation of condominiums, townhomes, townhouses, or conversions, as those terms are defined in 70-23-102, when any applicable park dedication requirements as set forth in Title 76, chapter 25, part 3, are complied with;
(j) the lease or rental of contiguous airport-related land owned by a city, a county, the state, or a municipal or regional airport authority;
(k) subject to subsection (4), a division of state-owned land, unless the division creates a second or subsequent residential parcel from a single tract for sale, rent, or lease after July 1, 1974;
(l) the creation of lots by deed, contract, lease, or other conveyance executed prior to July 1, 1974;
(m) the relocation of common boundary lines between or aggregations of adjoining properties that does not result in an increase in the number of lots;
(n) a single gift or sale in each county to each member of the landowner's immediate family; or
(o) subject to subsection (5), the creation of lots by deed, contract, lease, or other conveyance in which the landowner enters into a covenant with the governing body that runs with the land that provides that the divided land must be used exclusively for agricultural purposes.
(2) Before a court of record orders a division of land under subsection (1)(a), the court shall notify the governing body of the pending division and allow the governing body to present written comment on the division.
(3) A transfer of divided land by the owner of the property at the time that the land was divided to any party other than those identified in subsection (1)(b) subjects the division of land to the requirements of this chapter.
(4) Instruments of transfer of land that is acquired for state highways may refer by parcel and project number to state highway plans that have been recorded in compliance with 60-2-209 and are exempted from the surveying and platting requirements of this chapter. If the parcels are not shown on highway plans of record, instruments of transfer of the parcels must be accompanied by and refer to appropriate certificates of survey and plats when presented for recording.
(5) The governing body, in its discretion, may revoke the covenant provided for in subsection (1)(o) without subdivision review if the original lot lines are restored through aggregation of the covenanted land prior to or in conjunction with the revoking of the covenant.
76-25-403. Adoption and amendment of subdivision regulations.
(1) (a) The governing body shall adopt or amend subdivision regulations only after consideration by and on the recommendation of the planning commission.
(b) An amendment to adopted subdivision regulations may be initiated:
(i) by majority vote of the governing body;
(ii) on petition of at least 15% of the electors of the local government jurisdiction to which the regulations apply, as registered at the last general election; or
(iii) by a property owner, as related to an application for any zoning, subdivision, or other land use permit or approval.
(2) Prior to making a recommendation to the governing body to adopt or amend subdivision regulations, the planning commission shall:
(a) provide public notice and participation in accordance with 76-25-106;
(b) accept, consider, and respond to public comment on the proposed subdivision regulation or amendment to a subdivision regulation. All public comment must be part of the administrative record transmitted to the governing body.
(c) make a preliminary determination as to whether the subdivision regulation or amendment to a subdivision regulation is in substantial compliance with the land use plan and zoning regulations, including whether the regulation or amendment:
(i) enables the development of projected needed housing types identified in the land use plan and zoning regulations;
(ii) reflects applicable strategies from the land use plan and zoning regulations to encourage the development of housing within the jurisdiction;
(iii) facilitates the adequate provision of public safety, emergency, utility, transportation, education, and any other local facilities or services for proposed development, as identified in the land use plan and zoning regulations;
(iv) reflects standards that provide for existing, new, or expanding commercial, industrial, and institutional enterprises identified in the land use plan and zoning regulations for economic growth;
(v) protects and maximizes the potential use of natural resources within the area, as identified in the land use plan and zoning regulations;
(vi) contains standards that minimize or avoid impacts to the natural environment within the area, as identified in the land use plan and zoning regulations; and
(vii) contains standards that avoid or minimize dangers associated with natural hazards in the jurisdiction, as identified in the land use plan and zoning regulations; and
(d) preliminarily determine whether the proposed subdivision regulation or amendment to a subdivision regulation results in new or increased potential impacts to or from local facilities, services, natural resources, natural environment, or natural hazards from those previously described and analyzed in the assessments conducted for the land use plan and zoning regulations.
(3) If the planning commission finds new or increased potential impacts from the proposed regulation or amendment to a regulation pursuant to subsection (2)(d), the local government shall collect additional data and conduct additional analysis necessary to provide the planning commission and the public with the opportunity, pursuant to 76-25-106, to comment on and consider all potential impacts resulting from adoption of the subdivision regulation or amendment to a subdivision regulation.
(4) After meeting the requirements of subsection (2), the planning commission shall make a final recommendation to the governing body to approve, modify, or reject the proposed subdivision regulation or amendment to a subdivision regulation.
(5) (a) The governing body shall consider each subdivision regulation or amendment to a subdivision regulation that the planning commission recommends to the governing body.
(b) After providing public notice and participation in accordance with 76-25-106, the governing body may adopt, adopt with revisions that the governing body considers appropriate, or reject the subdivision regulation or amendment to a subdivision regulation as proposed by the planning commission.
(c) The governing body may not adopt or amend a subdivision regulation unless the governing body finds:
(i) the subdivision regulation or amendment to a subdivision regulation is in substantial compliance with the land use plan and zoning regulations; and
(ii) the impacts resulting from development in substantial compliance with the proposed subdivision regulation or amendment to a subdivision regulation have been made available for public review and comment, which have been fully considered by the governing body.
(6) After the subdivision regulation or amendment to a subdivision regulation has been adopted by the governing body, there is a presumption that:
(a) all subdivisions in substantial compliance with the adopted regulation or amendment are in substantial compliance with the land use plan and zoning regulations; and
(b) the public has been provided a meaningful opportunity to participate.
76-25-404. Contents of local subdivision regulations.
(1) The subdivision regulations adopted under this part are limited to the following requirements:
(a) the date the regulations initially become effective under this chapter and the effective dates and the ordinance numbers for all subsequent amendments;
(b) design standards for all subdivisions in the jurisdiction, which may be incorporated by reference or may be based on the information and analysis contained in the land use plan and zoning regulations, including:
(i) standards for grading and erosion control;
(ii) standards for the design and arrangement of lots, streets, and roads;
(iii) standards for the location and installation of public utilities, including water supply and sewage and solid waste disposal;
(iv) standards for the provision of other public improvements; and
(v) legal and physical access to all lots;
(c) when a subdivision creates parcels with lot sizes averaging less than 5 acres, a requirement that the subdivider:
(i) reserve all or a portion of the appropriation water rights owned by the owner of the subject property, transfer the water rights to a single entity for use by landowners within the subdivision who have a legal right to the water, and reserve and sever any remaining surface water rights from the land;
(ii) if the land to be subdivided is subject to a contract or interest in a public or private entity formed to provide the use of a water right on the subdivision lots, establish a landowner's water use agreement that is administered through a single entity and that specifies administration and the rights and responsibilities of landowners within the subdivision who have a legal right and access to the water; or
(iii) reserve and sever all surface water rights from the land;
(d) except as provided in subsection (2), a requirement that the subdivider establish ditch easements that:
(i) are in locations of appropriate topographic characteristics and sufficient width to allow the physical placement and unobstructed maintenance of open ditches or belowground pipelines for the delivery of water for irrigation to persons and lands legally entitled to the water under an appropriated water right or permit of an irrigation district or other private or public entity formed to provide for the use of the water right on the subdivision lots;
(ii) unless otherwise provided for under a separate written agreement or filed easement, provide for the unobstructed use and maintenance of existing water delivery ditches, pipelines, and facilities in the subdivision that are necessary to convey water through the subdivision to lands adjacent to or beyond the subdivision boundaries in quantities and in a manner that are consistent with historic and legal rights;
(iii) are a sufficient distance from the centerline of the ditch to allow for construction, repair, maintenance, and inspection of the ditch; and
(iv) prohibit the placement of structures or the planting of vegetation other than grass within the ditch easement without the written permission of the ditch owner;
(e) criteria that the planning administrator must use to determine whether a proposed method of disposition using the exemptions provided in this chapter is an attempt to evade the requirements of this chapter;
(f) a list of the materials that must be included in order for the application to be determined complete;
(g) subject to subsection (4), identification of circumstances or conditions that may necessitate the denial of any or specific types of development, such as unmitigable natural hazards, insufficient water supply, inadequate drainage, lack of access, inadequate public services, or the excessive expenditure of public funds for the supply of the services;
(h) subject to subsection (5), a list of public utilities and agencies of local, state, and federal government that the local government must seek input from during review of an application and for what information or analysis; or
(i) subject to subsection (6), requirements for the dedication of land, cash-in-lieu thereof, or a combination of both for parks and recreation purposes, not to exceed 0.03 acres per dwelling unit.
(2) A land donation under this section may be inside or outside of the subdivision.
(3) The regulations may not require ditch easements if:
(a) the average lot size is 1 acre or less and the subdivider provides for disclosure, in a manner acceptable to the governing body, that adequately notifies potential buyers of lots that are classified as irrigated land that the lots may continue to be assessed for irrigation water delivery even though the water may not be deliverable; or
(b) the water rights are removed or the process has been initiated to remove the water rights from the subdivided land through an appropriate legal or administrative process and the removal or intended removal is denoted on the preliminary plat. If removal of water rights is not complete upon filing of the final plat, the subdivider shall provide written notification to prospective buyers of the intent to remove the water right and shall document that intent, when applicable, in agreements and legal documents for related sales transactions.
(4) (a) The regulations must prohibit development in circumstances or conditions identified in subsection (1)(g) unless the hazards or impacts may be eliminated or overcome by approved construction techniques or other mitigation measures identified in the subdivision regulations.
(b) Approved construction techniques or other mitigation measures described in subsection (4)(a) may not include building regulations as defined in 50-60-101 other than those identified by the department of labor and industry as provided in 50-60-901.
(5) If a proposed subdivision is situated within a rural school district, as described in 20-9-615, the local government shall provide a copy of the application and preliminary plat to the school district.
(6) (a) A park dedication may not be required for:
(i) land proposed for subdivision into parcels larger than 5 acres;
(ii) subdivision into parcels that are all nonresidential;
(iii) a subdivision in which parcels are not created, except when that subdivision provides multiple permanent spaces for recreational camping vehicles, mobile homes, or condominiums; or
(iv) a subdivision in which only one additional parcel is created.
(b) Subject to the approval of the local governing body and acceptance by the school district trustees, a subdivider may dedicate a land donation provided in subsection (6)(a) to a school district to be used for school facilities or buildings.
76-25-408. Local review procedure for divisions of land.
(Temporary)
(1) An applicant may request a preapplication submittal and response from the planning administrator prior to submitting a subdivision application. The preapplication review must take place no more than 30 business days from the date that the planning administrator receives a written request for a preapplication review from the subdivider.
(2) On receipt of an application for an exemption from subdivision review under 76-25-402 that contains all materials and information required by the governing body under subsection (5), the local government:
(a) shall approve or deny the application within 20 business days;
(b) may not impose conditions on the approval of an exemption from subdivision review except for conditions necessary to ensure compliance with the survey requirements of 76-25-412(1); and
(c) may require the certificate of survey to be reviewed for errors and omissions in calculation or drafting by an examining land surveyor before filing with the county clerk and recorder. The examining land surveyor shall certify compliance in a printed or stamped certificate signed by the surveyor on the certificate of survey. A professional land surveyor may not act as an examining land surveyor in regard to a certificate of survey in which the surveyor has a financial or personal interest.
(3) (a) When a proposed subdivision lies entirely within an incorporated city or is proposed for annexation into the city, the application and preliminary plat must be submitted to and approved by the city.
(b) Except as provided in subsection (3)(c), when a proposed subdivision lies entirely in an unincorporated area, the application and preliminary plat must be submitted to and approved by the county.
(c) If the proposed subdivision lies within an area subject to increased growth pressures, higher development densities, or other urban development influences identified by either jurisdiction in 76-25-213, the jurisdiction shall provide other impacted jurisdictions the opportunity to review and comment on the application.
(d) If the proposed subdivision lies partly within an incorporated city, the application and preliminary plat must be submitted to and approved by both the city and the county governing bodies.
(4) A subdivision application is considered received on the date the application is delivered to the reviewing agent or agency if accompanied by the review fee.
(5) (a) The planning administrator has 20 business days to determine whether the application contains all information and materials necessary to complete the review of the application as set forth in the local subdivision regulations.
(b) The planning administrator may review subsequent submissions of the application only for information found to be deficient during the original review of the application under subsection (5)(a).
(c) A determination that an application contains sufficient information for review as provided in subsection (5)(a) does not ensure approval or conditional approval of the proposed subdivision and does not limit the ability of the planning administrator to request additional information during the review process.
(6) A subdivider may propose a phasing plan for approval with a preliminary plat. The phasing plan must include a phasing plan and map that demonstrates what lots will be included with each phase, what public facilities will be completed with each phase, and the timeline for the proposed phases.
(7) After accepting a complete application proposing subdivision of a site, the planning administrator shall make an initial determination of whether:
(a) the proposed subdivision, with or without variances or deviations from adopted standards, is in substantial compliance with the zoning and subdivision regulations; and
(b) all impacts resulting from the proposed subdivision were previously analyzed and made available for public review and comment in the adoption, amendment, or update of the land use plan, zoning regulations, and subdivision regulations.
(8) (a) If the planning administrator makes an initial determination that the proposed subdivision, with or without variances or deviations from adopted standards, meets the requirements of subsections (7)(a) and (7)(b), the planning administrator shall provide public notice of its initial determination in accordance with 76-25-106(3)(a) and (3)(b) and a 15-business-day written public comment period during which the public must have an opportunity to comment on the initial determination.
(b) Unless public comment received on or before the last day of the comment period provided in subsection (8)(a) supports a determination that the proposed subdivision fails to meet either one or both of the requirements of subsection (7)(a) or (7)(b), the planning administrator shall issue written findings stating the results of the public comment and a final written decision approving, approving with conditions, or denying the application, which may be appealed as provided in 76-25-503.
(c) If public comment received on or before the last day of the comment period in subsection (8)(a) provides evidence that the proposed subdivision fails to meet either one or both of the requirements of subsection (7)(a) or (7)(b), the planning administrator shall proceed with further review of the application as set forth in subsection (9).
(9) If the planning administrator makes an initial determination or public comment received under subsection (8)(c) provides evidence that a proposed subdivision of a site that, with or without variances or deviations from adopted standards, fails to meet either one or both of the requirements of subsection (7)(a) or (7)(b), the planning administrator shall proceed as follows:
(a) request the applicant to collect any additional data and perform any additional analysis necessary to provide the planning administrator and the public with the opportunity to comment on and consider the lack of substantial compliance with the zoning and subdivision regulations and any new or significantly increased potential impacts not previously identified and considered in the adoption, amendment, or update of the land use plan, zoning regulations, and subdivision regulations;
(b) collect any additional data or perform any additional analysis that the planning administrator determines is necessary to provide the local government and the public with the opportunity to comment on and consider the lack of substantial compliance with the zoning and subdivision regulations and any new or significantly increased potential impacts not previously identified or considered in the adoption, amendment, or update of the land use plan, zoning regulations, and subdivision regulations; and
(c) provide public notice of the planning administrator's initial or revised initial determination in accordance with 76-25-106(3)(a) and (3)(b) and a written comment period of 15 business days during which the public must have an opportunity to participate in and comment on the data collected and analysis performed pursuant to subsections (9)(a) and (9)(b).
(10) Any additional data, analysis, comment, or consideration described in subsection (9) must be limited to the lack of substantial compliance with the zoning and subdivision regulations and any new or significantly increased potential impacts resulting from the proposed subdivision to the extent that the impact was not previously identified in the adoption, amendment, or update of the land use plan, zoning regulations, zoning map, or subdivision regulations
(11) Within 30 business days of the end of the written comment period provided in subsection (9)(c), the planning administrator shall issue written findings stating the results of the public comment and shall issue a written decision to approve, conditionally approve, or deny a proposed subdivision application, which may be appealed as provided in 76-25-503.
(12) The basis of the decision to approve, conditionally approve, or deny a proposed preliminary plat is based on the administrative record as a whole and a finding that the proposed subdivision:
(a) meets the requirements and standards of this chapter;
(b) meets the survey requirements provided in 76-25-412(1);
(c) provides the necessary easements within and to the proposed subdivision for the location and installation of any planned utilities; and
(d) provides the necessary legal and physical access to each parcel within the proposed subdivision and the required notation of that access on the applicable plat and any instrument of transfer concerning the parcel.
(13) (a) The written decision must identify each finding required in subsection (12) that supports the decision to approve, conditionally approve, or deny a proposed preliminary plat, including any conditions placed on the approval that must be satisfied before a final plat may be approved.
(b) The written decision must identify all facts that support the basis for each finding and each condition and identify the regulations and statutes used in reaching each finding and each condition.
(c) When requiring mitigation as a condition of approval, a local government may not unreasonably restrict a landowner's ability to develop land. However, in some instances, the local government may determine that the impacts of a proposed development are unmitigable and preclude approval of the subdivision.
(14) The written decision to approve, conditionally approve, or deny a proposed subdivision must:
(a) be provided to the applicant;
(b) be made available to the public;
(c) include information regarding the appeal process; and
(d) state the timeframe the approval is in effect.
(15) Any changes to an approved preliminary plat that increases the number of lots or redesigns or rearranges six or more lots must undergo consideration and approval of an amended plat following the requirements of this section.
(16) Ministerial permits may be issued by the planning administrator without any discretionary review or analysis and may be appealed as provided in 76-25-503. (Terminates June 30, 2027--sec. 16, Ch. 555, L. 2025.)
(Effective July 1, 2027)
(1) An applicant may request a preapplication submittal and response from the planning administrator prior to submitting a subdivision application. The preapplication review must take place no more than 30 business days from the date that the planning administrator receives a written request for a preapplication review from the subdivider.
(2) On receipt of an application for an exemption from subdivision review under 76-25-402 that contains all materials and information required by the governing body under subsection (5), the local government:
(a) shall approve or deny the application within 20 business days;
(b) may not impose conditions on the approval of an exemption from subdivision review except for conditions necessary to ensure compliance with the survey requirements of 76-25-412(1); and
(c) may require the certificate of survey to be reviewed for errors and omissions in calculation or drafting by an examining land surveyor before filing with the county clerk and recorder. The examining land surveyor shall certify compliance in a printed or stamped certificate signed by the surveyor on the certificate of survey. A professional land surveyor may not act as an examining land surveyor in regard to a certificate of survey in which the surveyor has a financial or personal interest.
(3) (a) When a proposed subdivision lies entirely within an incorporated city or is proposed for annexation into the city, the application and preliminary plat must be submitted to and approved by the city.
(b) Except as provided in subsection (3)(c), when a proposed subdivision lies entirely in an unincorporated area, the application and preliminary plat must be submitted to and approved by the county.
(c) If the proposed subdivision lies within an area subject to increased growth pressures, higher development densities, or other urban development influences identified by either jurisdiction in 76-25-213, the jurisdiction shall provide other impacted jurisdictions the opportunity to review and comment on the application.
(d) If the proposed subdivision lies partly within an incorporated city, the application and preliminary plat must be submitted to and approved by both the city and the county governing bodies.
(4) A subdivision application is considered received on the date the application is delivered to the reviewing agent or agency if accompanied by the review fee.
(5) (a) The planning administrator has 20 business days to determine whether the application contains all information and materials necessary to complete the review of the application as set forth in the local subdivision regulations.
(b) The planning administrator may review subsequent submissions of the application only for information found to be deficient during the original review of the application under subsection (5)(a).
(c) A determination that an application contains sufficient information for review as provided in subsection (5)(a) does not ensure approval or conditional approval of the proposed subdivision and does not limit the ability of the planning administrator to request additional information during the review process.
(6) A subdivider may propose a phasing plan for approval with a preliminary plat. The phasing plan must include a phasing plan and map that demonstrates what lots will be included with each phase, what public facilities will be completed with each phase, and the timeline for the proposed phases.
(7) (a) If an application proposes a subdivision of a site that, with or without variances or deviations from adopted standards, is in substantial compliance with the zoning and subdivision regulations and all impacts resulting from the development were previously analyzed and made available for public review and comment prior to the adoption of the land use plan, zoning regulations, and subdivision regulations, or any amendment thereto, the planning administrator shall issue a written decision to approve, approve with conditions, or deny the preliminary plat.
(b) The application is not subject to any further public review or comment, except as provided in 76-25-503.
(c) The decision by the planning administrator must be made no later than 15 business days from the date the application is considered complete.
(8) (a) If an application proposes subdivision of a site that, with or without variances or deviations from adopted standards, is in substantial compliance with the zoning and subdivision regulations but may result in new or significantly increased potential impacts that have not been previously identified and considered in the adoption of the land use plan, zoning regulations, or subdivision regulations, or any amendments thereto, the planning administrator shall proceed as follows:
(i) request the applicant to collect additional data and perform additional analysis necessary to provide the planning administrator and the public with the opportunity to comment on and consider the impacts identified in this subsection (8)(a);
(ii) collect additional data or perform additional analysis that the planning administrator determines is necessary to provide the local government and the public with the opportunity to comment on and consider the impacts identified in this subsection (8)(a); and
(iii) provide notice of a written comment period of 15 business days during which the public must have a reasonable opportunity to participate in the consideration of the impacts identified in this subsection (8)(a).
(b) Any additional analysis or public comment on the proposed development is limited to only new or significantly increased potential impacts resulting from the proposed development to the extent that the impact was not previously identified in the consideration and adoption of the land use plan, zoning regulations, subdivision regulations, or any amendments thereto.
(9) Within 30 business days of the end of the written comment period provided in subsection (8)(a)(iii), the planning administrator shall issue a written decision to approve, conditionally approve, or deny a proposed subdivision application.
(10) The basis of the decision to approve, conditionally approve, or deny a proposed preliminary plat is based on the administrative record as a whole and a finding that the proposed subdivision:
(a) meets the requirements and standards of this chapter;
(b) meets the survey requirements provided in 76-25-412(1);
(c) provides the necessary easements within and to the proposed subdivision for the location and installation of any planned utilities; and
(d) provides the necessary legal and physical access to each parcel within the proposed subdivision and the required notation of that access on the applicable plat and any instrument of transfer concerning the parcel.
(11) (a) The written decision must identify each finding required in subsection (10) that supports the decision to approve, conditionally approve, or deny a proposed preliminary plat, including any conditions placed on the approval that must be satisfied before a final plat may be approved.
(b) The written decision must identify all facts that support the basis for each finding and each condition and identify the regulations and statutes used in reaching each finding and each condition.
(c) When requiring mitigation as a condition of approval, a local government may not unreasonably restrict a landowner's ability to develop land. However, in some instances, the local government may determine that the impacts of a proposed development are unmitigable and preclude approval of the subdivision.
(12) The written decision to approve, conditionally approve, or deny a proposed subdivision must:
(a) be provided to the applicant;
(b) be made available to the public;
(c) include information regarding the appeal process; and
(d) state the timeframe the approval is in effect.
(13) The planning administrator's decision is final, and no further action may be taken except as provided in 76-25-503.
(14) Any changes to an approved preliminary plat that increases the number of lots or redesigns or rearranges six or more lots must undergo consideration and approval of an amended plat following the requirements of this section.
76-25-409. Effect of preliminary plat approval.
(1) (a) An approved or conditionally approved preliminary plat must be in effect for not more than 5 calendar years and not less than 1 calendar year.
(b) At the end of the period, the planning administrator may, at the request of the subdivider, extend the approval once by written agreement.
(c) On receipt of a request for an extension, the planning administrator shall determine whether the preliminary plat remains in substantial compliance with the zoning and subdivision regulations. If the preliminary plat is no longer in substantial compliance with the zoning or subdivision regulations, the extension may not be granted.
(d) After a preliminary plat is approved, the local government may not impose any additional conditions as a prerequisite to final plat approval if the approval is obtained within the original or extended approval period.
(e) Any subsequent requests by the subdivider for extension of the approval must be reviewed and approved by the governing body.
(2) An approved or conditionally approved phased preliminary plat must be in effect for 20 calendar years.
76-25-410. Local review procedure for final plats.
(Temporary)
(1) The following must be submitted with a final plat application:
(a) information demonstrating the final plat conforms to the written decision and all conditions of approval set forth on the preliminary plat;
(b) a plat that meets the survey requirements provided in 76-25-412(1); and
(c) confirmation the county treasurer has certified that all real property taxes and special assessments assessed and levied on the land to be subdivided have been paid.
(2) The final plat may be required to be reviewed for errors and omissions in calculation or drafting by an examining land surveyor before filing with the county clerk and recorder. The examining land surveyor shall certify compliance in a printed or stamped certificate signed by the surveyor on the final plat. A professional land surveyor may not act as an examining land surveyor in regard to a plat in which the surveyor has a financial or personal interest.
(3) A final plat application is considered received on the date the application is delivered to the governing body or the agent or agency designated by the governing body if accompanied by the review fee.
(4) (a) Within 10 business days of receipt of a final plat, the planning administrator shall determine whether the final plat contains the information required under subsection (1) and shall notify the subdivider in writing.
(b) If the planning administrator determines that the final plat does not contain the information required under subsection (1), the planning administrator shall identify the final plat's defects in the notification.
(c) The planning administrator may review subsequent submissions of the final plat only for information found to be deficient during the original review of the final plat under subsection (4)(a).
(d) A determination that the application for a final plat contains sufficient information for review as provided in subsection (4)(a) does not ensure approval of the final plat and does not limit the ability of the planning administrator to request additional information during the review process.
(5) Once a determination is made under subsection (4) that the final plat contains the information required under subsection (1), the governing body shall review and approve or deny the final plat within 20 business days.
(6) The subdivider or the subdivider's agent and the governing body or its reviewing agent or agency may mutually agree to extend the review periods provided for in this section.
(7) (a) For a period of 5 years after approval of a phased preliminary plat, the subdivider may apply for final plat of any one or more phases following the process set forth in subsections (1) through (6).
(b) After 5 years have elapsed since approval of a phased preliminary plat, the planning administrator shall review each remaining phase to determine if a phase may result in new or significantly increased potential impacts that have not been previously identified and considered in the adoption of the land use plan, zoning or subdivision regulations, or review and approval of the phased preliminary plat. If the planning administrator identifies any new or significantly increased potential impacts not previously identified and considered, the planning administrator shall proceed as set forth in 76-25-408(9).
(c) If necessary to mitigate impacts identified in subsection (7)(b), the planning administrator may impose conditions on any phase before final plat approval is sought. (Terminates June 30, 2027--sec. 16, Ch. 555, L. 2025.)
(Effective July 1, 2027)
(1) The following must be submitted with a final plat application:
(a) information demonstrating the final plat conforms to the written decision and all conditions of approval set forth on the preliminary plat;
(b) a plat that meets the survey requirements provided in 76-25-412(1); and
(c) confirmation the county treasurer has certified that all real property taxes and special assessments assessed and levied on the land to be subdivided have been paid.
(2) The final plat may be required to be reviewed for errors and omissions in calculation or drafting by an examining land surveyor before filing with the county clerk and recorder. The examining land surveyor shall certify compliance in a printed or stamped certificate signed by the surveyor on the final plat. A professional land surveyor may not act as an examining land surveyor in regard to a plat in which the surveyor has a financial or personal interest.
(3) A final plat application is considered received on the date the application is delivered to the governing body or the agent or agency designated by the governing body if accompanied by the review fee.
(4) (a) Within 10 business days of receipt of a final plat, the planning administrator shall determine whether the final plat contains the information required under subsection (1) and shall notify the subdivider in writing.
(b) If the planning administrator determines that the final plat does not contain the information required under subsection (1), the planning administrator shall identify the final plat's defects in the notification.
(c) The planning administrator may review subsequent submissions of the final plat only for information found to be deficient during the original review of the final plat under subsection (4)(a).
(d) A determination that the application for a final plat contains sufficient information for review as provided in subsection (4)(a) does not ensure approval of the final plat and does not limit the ability of the planning administrator to request additional information during the review process.
(5) Once a determination is made under subsection (4) that the final plat contains the information required under subsection (1), the governing body shall review and approve or deny the final plat within 20 business days.
(6) The subdivider or the subdivider's agent and the governing body or its reviewing agent or agency may mutually agree to extend the review periods provided for in this section.
(7) (a) For a period of 5 years after approval of a phased preliminary plat, the subdivider may apply for final plat of any one or more phases following the process set forth in subsections (1) through (6).
(b) After 5 years have elapsed since approval of a phased preliminary plat, the planning administrator shall review each remaining phase to determine if a phase may result in new or significantly increased potential impacts that have not been previously identified and considered in the adoption of the land use plan, zoning or subdivision regulations, or review and approval of the phased preliminary plat. If the planning administrator identifies any new or significantly increased potential impacts not previously identified and considered, the planning administrator shall proceed as set forth in 76-25-408(8).
(c) If necessary to mitigate impacts identified in subsection (7)(b), the planning administrator may impose conditions on any phase before final plat approval is sought.
76-25-411. Filing and recordation of plats and certificates of survey.
(1) (a) Except as provided in subsection (1)(b), every final plat or certificate of survey must be filed for record with the county clerk and recorder before title to the land may be sold or transferred in any manner. The clerk and recorder of the county may not accept any final plat or certificate of survey for record that has not been approved in accordance with this part unless the final plat or certificate of survey is located in an area over which the state does not have jurisdiction.
(b) After the preliminary plat of a subdivision has been approved or conditionally approved, the subdivider may enter into contracts to sell lots in the proposed subdivision if all of the following contract conditions are imposed and met:
(i) the purchasers of lots in the proposed subdivision make payments to an escrow agent, which must be a bank or savings and loan association chartered to do business in the state of Leonida;
(ii) the payments made by purchasers of lots in the proposed subdivision may not be distributed by the escrow agent to the subdivider until the final plat of the subdivision is filed with the county clerk and recorder;
(iii) if the final plat of the proposed subdivision is not filed with the county clerk and recorder within the approval period of the preliminary plat, the escrow agent shall immediately refund to each purchaser any payments the purchaser has made under the contract;
(iv) the county treasurer has certified that no real property taxes assessed and levied on the land to be divided are delinquent; and
(v) the following language is conspicuously set out in each contract: "The real property that is the subject of this contract has not been finally platted, and until a final plat identifying the property has been filed with the county clerk and recorder, title to the property may not be transferred in any manner".
(2) (a) Subject to subsection (2)(b), no division of land may be made unless the county treasurer has certified that all real property taxes and special assessments assessed and levied on the land to be divided have been paid.
(b) (i) If a division of land includes centrally assessed property and the property taxes applicable to the division of land are not specifically identified in the tax assessment, the department of revenue shall prorate the taxes applicable to the land being divided on a reasonable basis. The owner of the centrally assessed property shall ensure that the prorated real property taxes and special assessments are paid on the land being sold before the division of land is made.
(ii) The county treasurer may accept the amount of the tax prorated pursuant to this subsection (2)(b) as a partial payment of the total tax that is due.
(3) (a) The county clerk and recorder shall maintain an index of all recorded and filed subdivision plats and certificates of survey.
(b) The index must list plats and certificates of survey by the quarter section, section, township, and range in which the platted or surveyed land lies and must list the recording or filing numbers of all plats or certificates of survey depicting lands lying within each quarter section. Each quarter section list must be definitive to the exclusion of all other quarter sections. The index must also list the names of all subdivision plats in alphabetical order and the place where filed.
(4) The recording of any plat made in compliance with the provisions of this chapter must serve to establish the identity of all lands shown on and being part of the plat. When lands are conveyed by reference to a plat, the plat itself or any copy of the plat properly certified by the county clerk and recorder as being a true copy thereof must be regarded as incorporated into the instrument of conveyance and must be received in evidence in all courts of this state.
(5) (a) Any plat prepared and recorded as provided in this part may be vacated either in whole or in part as provided by 7-5-2501, 7-5-2502, 7-14-2616(1) and (2), 7-14-2617, 7-14-4114(1) and (2), and 7-14-4115. Upon vacation, the governing body or the district court, as provided in 7-5-2502, shall determine to which properties the title to the streets and alleys of the vacated portions must revert. The governing body or the district court, as provided in 7-5-2502, shall take into consideration:
(i) the previous platting;
(ii) the manner in which the right-of-way was originally dedicated, granted, or conveyed;
(iii) the reasons stated in the petition requesting the vacation;
(iv) the parties requesting the vacation; and
(v) any agreements between the adjacent property owners regarding the use of the vacated area. The title to the streets and alleys of the vacated portions may revert to one or more of the owners of the properties within the platted area adjacent to the vacated portions.
(b) Notwithstanding the provisions of subsection (5)(a), when any poleline, pipeline, or any other public or private facility is located in a vacated street or alley at the time of the reversion of the title to the vacated street or alley, the owner of the public or private utility facility has an easement over the vacated land to continue the operation and maintenance of the public utility facility.
(6) (a) After a final subdivision plat has been filed for record with the county clerk and recorder, a homeowners' association may file a petition with the governing body to transfer title to the homeowners' association of any open spaces, parks, or similar common-use areas set aside in the final plat if the following conditions are met:
(i) the homeowners' association is organized in accordance with the covenants;
(ii) the covenants require the homeowners' association to maintain, repair, or insure the open spaces, parks, or similar common-use areas;
(iii) the governing body finds that it was the intent of the subdivider that the open spaces, parks, or similar common-use areas be owned by the homeowners' association; and
(iv) the property to be transferred is not owned by a person.
(b) The petition under subsection (6)(a) must be signed by an authorized representative of the homeowners' association.
(c) After a public hearing on the petition, the governing body shall issue written findings of fact and a decision based on the record. If the requirements of subsection (6)(a) have been met, the governing body shall approve the transfer. If the governing body approves the transfer, the approval must be recorded with the clerk and recorder.
76-25-412. Survey requirements.
(1) Divisions of land under this chapter must follow the uniform standards governing monumentation, certificates of survey, and subdivision plats prescribed and adopted by the board of professional engineers and professional land surveyors.
(2) All division of sections into aliquot parts and retracement of lines must conform to United States bureau of land management instructions, and all public land survey corners must be filed in accordance with Title 70, chapter 22, part 1. Engineering plans, specifications, and reports required in connection with public improvements and other elements of the subdivision required by the governing body must be prepared and filed by a registered engineer or a registered land surveyor, as their respective licensing laws allow, in accordance with this part and regulations adopted pursuant to this part.
(3) All divisions of land for sale other than a subdivision created after July 1, 1974, divided into parcels that cannot be described as 1/32 or larger aliquot parts of a United States government section or a United States government lot must be surveyed by or under the supervision of a registered land surveyor. Surveys required under this section must comply with the requirements of subsection (8).
(4) Except as provided in 70-22-105, within 180 days of the completion of a survey, the professional land surveyor responsible for the survey, whether the surveyor is privately or publicly employed, shall prepare and submit for filing a certificate of survey in the county in which the survey was made if the survey:
(a) provides material evidence not appearing on any map filed with the county clerk and recorder or contained in the records of the United States bureau of land management;
(b) reveals a material discrepancy in the map;
(c) discloses evidence to suggest alternate locations of lines or points; or
(d) establishes one or more lines not shown on a recorded map, the positions of which are not ascertainable from an inspection of the map without trigonometric calculations.
(5) A certificate of survey is not required for any survey that is made by the United States bureau of land management, that is preliminary, or that will become part of a subdivision plat being prepared for recording under the provisions of this chapter.
(6) It is the responsibility of the governing body to require the replacement of all monuments removed in the course of construction.
(7) (a) A registered land surveyor may administer and certify oaths when:
(i) it becomes necessary to take testimony for the identification of old corners or reestablishment of lost or obliterated corners;
(ii) a corner or monument is found in a deteriorating condition and it is desirable that evidence concerning it be perpetuated; or
(iii) the importance of the survey makes it desirable to administer an oath to the surveyor's assistants for the faithful performance of their duty.
(b) A record of oaths must be preserved as part of the field notes of the survey and noted on the certificate of survey filed under subsection (4).
(8) (a) (i) A surveyor who completes a survey identified in subsection (8)(b) that establishes or defines a section line and creates a parcel that crosses the established or defined section line so that an irrigation district assessment boundary is included in more than one section shall note on the survey the acreage of the farm unit or created parcel in each section.
(ii) The surveyor shall notify the appropriate irrigation district of the existence of the survey and the purpose of the survey.
(b) The requirements of subsection (8)(a) apply only to surveys for which the surveyor determines that, based on available public records, the survey involves land:
(i) traversed by a canal or ditch owned by an irrigation district; or
(ii) included in an irrigation district.
76-25-413. Public improvements and extension of capital facilities.
(1) Except as provided in subsections (1)(a) and (1)(c), the governing body shall require the subdivider to complete required improvements within the proposed subdivision prior to the approval of the final plat.
(a) (i) In lieu of the completion of the construction of any public improvements prior to the approval of a final plat, the governing body shall, at the subdivider's option, allow the subdivider to provide or cause to be provided a bond or other reasonable security, in an amount and with surety and conditions satisfactory to the governing body, providing for and securing the construction and installation of the improvements within a period specified by the governing body and expressed in the bonds or other security. The governing body shall reduce bond or security requirements commensurate with the completion of improvements. Failure of the local government to require the renewal of a bond does not waive the subdivider's responsibility to complete the required improvements prior to the approval of the final plat.
(ii) In lieu of requiring a bond or other means of security for the construction or installation of all the required public improvements under subsection (2)(a)(i), the governing body may enter into a subdivision improvements agreement with the subdivider that provides for an incremental payment, guarantee plan, or other method of completing the necessary improvements to serve the development as set forth in the preliminary plat approval.
(b) Approval by the governing body of a final plat prior to the completion of required improvements and without the provision of the security required under subsection (1)(a) is not an act of a legislative body for the purposes of 2-9-111.
(c) The governing body may require a percentage of improvements or specific types of improvements necessary to protect public health and safety to be completed before allowing bonding, other reasonable security, or entering into a subdivision improvements agreement for purposes of filing a final plat. The requirement is applicable to approved preliminary plats.
(2) (a) A local government may require a subdivider to pay or guarantee payment for part or all of the costs of extending capital facilities related to public health and safety, including but not limited to public roads, sewer lines, water supply lines, and storm drains to a subdivision. The costs must reasonably reflect the expected impacts directly attributable to the subdivision. A local government may not require a subdivider to pay or guarantee payment for part or all of the costs of constructing or extending capital facilities related to education.
(b) All fees, costs, or other money paid by a subdivider under this subsection (2) must be expended on the capital facilities for which the payments were required.