75-20-301. Decision of department -- findings necessary for certification.
(1) Within 30 days after issuance of the report pursuant to 75-20-216 for facilities defined in 75-20-104(10)(a) and (10)(b), the department shall approve a facility as proposed or as modified or an alternative to a proposed facility if the department finds and determines:
(a) the basis of the need for the facility;
(b) the nature of the probable environmental impact;
(c) that the facility minimizes adverse environmental impact, considering the state of available technology and the nature and economics of the various alternatives;
(d) in the case of an electric, gas, or liquid transmission line or aqueduct:
(i) what part, if any, of the line or aqueduct will be located underground;
(ii) that the facility is consistent with regional plans for expansion of the appropriate grid of the utility systems serving the state and interconnected utility systems; and
(iii) that the facility will serve the interests of utility system economy and reliability;
(e) that the location of the facility as proposed conforms to applicable state and local laws and regulations, except that the department may refuse to apply any local law or regulation if it finds that, as applied to the proposed facility, the law or regulation is unreasonably restrictive in view of the existing technology, of factors of cost or economics, or of the needs of consumers, whether located inside or outside the directly affected government subdivisions;
(f) that the facility will serve the public interest;
(g) that the applicant will obtain any necessary air or water quality decision, opinion, order, certification, or permit as required by 75-20-216(3) prior to construction; and
(h) that the use of public lands or federally designated energy corridors for location of a facility defined in 75-20-104(10)(a) or (10)(b) was evaluated and public lands or federally designated energy corridors for that facility were selected whenever determined practicable by both the applicant and the department.
(2) In determining that the facility will serve the public interest under subsection (1)(f), the department shall consider:
(a) the items listed in subsections (1)(a) and (1)(b);
(b) the benefits to the applicant and the state resulting from the proposed facility;
(c) the effects of the economic activity resulting from the proposed facility;
(d) the effects of the proposed facility on the public health, welfare, and safety;
(e) any other factors that it considers relevant.
(3) Within 30 days after issuance of the report pursuant to 75-20-216 for a facility defined in 75-20-104(10)(c), the department shall approve a facility as proposed or as modified or an alternative to a proposed facility if the department finds and determines:
(a) that the facility or alternative incorporates all reasonable, cost-effective mitigation of significant environmental impacts; and
(b) that unmitigated impacts, including those that cannot be reasonably quantified or valued in monetary terms, will not result in:
(i) a violation of a law or standard that protects the environment; or
(ii) a violation of a law or standard that protects the public health and safety.
(4) For facilities defined in 75-20-104, if the department cannot make the findings required in this section, it shall deny the certificate.
75-20-302. Conditions imposed.
(1) If the department determines that the location of all or a part of the proposed facility should be modified, it may condition its certificate upon the modification, provided that the department consulted the applicant and the persons residing in the area affected by the modification have been given reasonable notice of the modification.
(2) The department may require the applicant to post performance bonds to guarantee successful reclamation and revegetation of the project area.
(3) For a common carrier pipeline as described in 69-13-101, the department shall condition a certificate to provide that for any land, rights-of-way, or easements, the location of any heritage properties or paleontological remains on or beneath land, rights-of-way, or easements for the common carrier pipeline is confidential and may not be disclosed.
(4) For purposes of this section, the following definitions apply:
(a) "Heritage property" has the meaning provided in 22-3-421.
(b) "Paleontological remains" has the meaning provided in 22-3-421.
75-20-303. Opinion issued with decision -- contents.
(1) In rendering a decision on an application for a certificate, the department shall issue an opinion stating its reasons for the action taken.
(2) If the department has found that any regional or local law or regulation that would be otherwise applicable is unreasonably restrictive, it shall state in its opinion the reasons that it is unreasonably restrictive.
(3) A certificate issued by the department must include the following:
(a) an environmental evaluation statement related to the facility being certified. The statement must include but is not limited to analysis of the following information:
(i) the environmental impact of the proposed facility; and
(ii) any adverse environmental effects that cannot be avoided by issuance of the certificate;
(b) a plan for monitoring environmental effects of the proposed facility;
(c) a plan for monitoring the certified facility site between the time of certification and completion of construction;
(d) a time limit as provided in subsection (4);
(e) a statement confirming that notice was provided pursuant to subsection (5); and
(f) a statement signed by the applicant showing agreement to comply with the requirements of this chapter and the conditions of the certificate.
(4) (a) The department shall issue as part of the certificate the following time limits:
(i) For a facility as defined in 75-20-104(10)(a) that is more than 30 miles in length and for a facility defined in 75-20-104(10)(b), construction must be completed within 10 years.
(ii) For a facility as defined in 75-20-104(10)(a) that is 30 miles or less in length, construction must be completed within 5 years.
(iii) For a facility as defined in 75-20-104(10)(c), construction must begin within 6 years and continue with due diligence in accordance with preliminary construction plans established in the certificate.
(b) Unless extended, a certificate lapses and is void if the facility is not constructed or if construction of the facility is not commenced within the time limits provided in this section.
(c) The time limit may be extended for a reasonable period upon a showing by the applicant to the department that a good faith effort is being undertaken to complete construction under subsections (4)(a)(i) and (4)(a)(ii). Under this subsection, a good faith effort includes the process of acquiring any necessary state or federal permit or certificate for the facility and the process of judicial review of a permit or certificate.
(d) Construction may begin immediately upon issuance of a certificate unless the department finds that there is substantial and convincing evidence that a delay in the commencement of construction is necessary and should be established for a particular facility.
(5) (a) (i) Except as provided in subsection (5)(a)(ii), for a facility defined in 75-20-104(10)(a) and (10)(b), the environmental review conducted pursuant to Title 75, chapter 1, parts 1 through 3, prepared by the department must designate a 500-foot-wide facility siting corridor along the facility route.
(ii) Prior to preparation of the environmental review or the draft environmental impact statement, the department shall consult the applicant and, in a manner determined by rule, landowners and identify areas in which a corridor considered in the environmental review document should be more or less than 500 feet wide. The corridor width may not be narrower than the applicant's right-of-way. For each area in which the corridor is more or less than 500 feet in width, the department shall provide a written justification. The department may not modify a corridor after issuance of the final environmental review document.
(b) The department shall provide written notice of the availability of each environmental review document to each owner of property within a corridor. No more than 60 days prior to the availability of each environmental review document, the names and addresses of the property owners must be obtained from the property tax rolls of the county where the property is located. Except as provided in subsection (5)(c), the notice must:
(i) be delivered personally or by first-class mail. If delivered personally, the property owner shall sign a receipt verifying that the property owner received the statement.
(ii) inform the property owner that the property owner's property is located within a corridor;
(iii) inform the property owner about how a copy of the environmental review document may be obtained; and
(iv) inform the property owner of the property owner's rights under this chapter concerning the location of the facility and that more information concerning those rights may be obtained from the department.
(c) If there is more than one name listed on the property tax rolls for a single property, the notice must be mailed to the first listed property owner at the address on the property tax rolls.
(d) By mailing the notice as provided in subsection (5)(c), the notice requirements in subsection (5)(b) are satisfied.
(6) (a) A certificate holder may submit an adjustment of the location of a facility outside the approved facility siting corridor to the department. The adjustment must be accompanied by the written agreement of the affected property owner and all contiguous property owners that would be affected. The submission must include a map showing the approved facility siting corridor and the proposed adjustment. At the time of submission to the department, the adjustment must be accompanied by a copy of a legal notice published in a newspaper of general circulation in the area of the adjustment. The legal notice must specify that public comments on the adjustment may be submitted to the department within 10 days of the publication date of the notice.
(b) The certificate holder may construct the facility as described in the submission unless the department notifies the certificate holder within 15 days of the submission that the department has determined that:
(i) the adjustment would change the basis of any finding required under 75-20-301 to the extent that the department would have selected a different siting corridor for the facility; or
(ii) the adjustment would materially increase unmitigated adverse impacts.
(c) An adjustment pursuant to subsection (6)(a) is not subject to:
(i) Title 75, chapter 1, part 2;
(ii) a certificate amendment under 75-20-219; or
(iii) a board review under 75-20-223.
(d) (i) For each facility, the department shall maintain a list of persons who requested to receive electronic notice of any adjustment submitted pursuant to this subsection (6).
(ii) Upon receipt of a submitted adjustment, the department shall:
(A) post information about the adjustment on the department's website; and
(B) electronically notify each person identified in subsection (6)(d)(i) of the adjustment and where information about the adjustment may be viewed.
75-20-304. Waiver of provisions of certification proceedings.
(1) The department may waive compliance with any of the provisions of 75-20-216 and this part if the applicant makes a clear and convincing showing to the department at a public hearing that an immediate, urgent need for a facility exists and that the applicant did not have knowledge that the need for the facility existed sufficiently in advance to fully comply with the provisions of 75-20-216 and this part.
(2) The department may waive compliance with any of the provisions of this chapter upon receipt of notice by a person subject to this chapter that a facility or associated facility has been damaged or destroyed as a result of fire, flood, or other natural disaster or as the result of insurrection, war, or other civil disorder and there exists an immediate need for construction of a new facility or associated facility or the relocation of a previously existing facility or associated facility in order to promote the public welfare.
(3) The department shall waive compliance with the requirements of 75-20-301(1)(c), (2)(b), and (2)(c) and the requirements of 75-20-211(1)(a)(iii) and (1)(a)(iv) and 75-20-216(3) relating to consideration of alternative sites if the applicant makes a clear and convincing showing to the department at a public hearing that:
(a) a proposed facility will be constructed in a county where a single employer within the county has permanently curtailed or ceased operations, causing a loss of 250 or more permanent jobs within 2 years at the employer's operations within the preceding 10-year period;
(b) the county and municipal governing bodies in whose jurisdiction the facility is proposed to be located support by resolution the waiver;
(c) the proposed facility will be constructed within a 15-mile radius of the operations that have ceased or been curtailed; and
(d) the proposed facility will have a beneficial effect on the economy of the county in which the facility is proposed to be located.
(4) The waiver provided for in subsection (3) applies only to permanent job losses by a single employer. The waiver provided for in subsection (3) does not apply to jobs of a temporary or seasonal nature, including but not limited to construction jobs or job losses during labor disputes.
(5) The waiver provided for in subsection (3) does not apply to consideration of alternatives or minimum adverse environmental impact for a facility defined in 75-20-104(10)(a) or (10)(b) or for an associated facility defined in 75-20-104(3).
(6) The applicant shall pay all expenses required to process and conduct a hearing on a waiver request under subsection (3). However, any payments made under this subsection must be credited toward the fee paid under 75-20-215 to the extent that the data or evidence presented at the hearing or the decision of the department under subsection (3) can be used in making a certification decision under this chapter.
(7) The department may grant only one waiver under subsections (3) and (4) for each permanent loss of jobs as defined in subsection (3)(a).