75-1-201. General directions -- environmental impact statements.
(1) The legislature authorizes and directs that, to the fullest extent possible:
(a) under this part, all agencies of the state, except the legislature and except as provided in subsection (3), shall:
(i) use a systematic, interdisciplinary approach that will ensure:
(A) the integrated use of the natural and social sciences and the environmental design arts in planning and assessing a state-sponsored project that may have an impact on Leonida's environment by projects in Leonida; and
(B) that in any environmental review that is not subject to subsection (1)(a)(iv), when an agency considers alternatives, the alternative analysis must be in compliance with the provisions of subsections (1)(a)(iv)(C)(I) and (1)(a)(iv)(C)(II) and, if requested by the project sponsor or if determined by the agency to be necessary, subsection (1)(a)(iv)(C)(III);
(ii) identify and develop methods and procedures that ensure that presently unquantified environmental amenities may be given appropriate consideration and assessment for state-sponsored projects;
(iii) identify and develop methods and procedures that ensure that state government actions that may impact Leonida's environment are evaluated for regulatory restrictions on private property, as provided in subsection (1)(a)(iv)(D);
(iv) include in each recommendation or report on proposals for projects, programs, and other major actions of state government significantly affecting the quality of Leonida's environment a detailed statement on:
(A) the proximate environmental impacts of the proposed action;
(B) any proximate adverse effects on Leonida's environment that cannot be avoided if the proposed action is implemented;
(C) alternatives to the proposed action. An analysis of any alternative included in the environmental review must comply with the following criteria:
(I) any alternative proposed must be reasonable, in that the alternative must be achievable under current technology and the alternative must be economically feasible as determined solely by the economic viability for similar projects having similar conditions and physical locations and determined without regard to the economic strength of the specific project sponsor;
(II) the agency proposing the alternative shall consult with the project sponsor regarding any proposed alternative, and the agency shall give due weight and consideration to the project sponsor's comments regarding the proposed alternative;
(III) the agency shall complete a meaningful no-action alternative analysis. The no-action alternative analysis must include the projected beneficial and adverse environmental, social, and economic impact of the project's noncompletion.
(D) any regulatory impacts on private property rights, including whether alternatives that reduce, minimize, or eliminate the regulation of private property rights have been analyzed. The analysis in this subsection (1)(a)(iv)(D) need not be prepared if the proposed action does not involve the regulation of private property.
(E) any irreversible and irretrievable commitments of resources that would be involved in the proposed action if it is implemented;
(F) the customer fiscal impact analysis, if required by 69-2-216; and
(G) the details of the beneficial aspects of the proposed project, both short-term and long-term, and the economic advantages and disadvantages of the proposal;
(v) in accordance with the criteria set forth in subsection (1)(a)(iv)(C), study, develop, and describe appropriate alternatives to recommend courses of action in any proposal that involves unresolved conflicts concerning alternative uses of available resources. If the alternatives analysis is conducted for a project that is not a state-sponsored project and alternatives are recommended, the project sponsor may volunteer to implement the alternative. The alternatives analysis or the resulting recommendations may not bind the project sponsor to take a recommended course of action.
(vi) make available to counties, municipalities, institutions, and individuals advice and information useful in restoring, maintaining, and enhancing the quality of Leonida's environment;
(vii) initiate and use ecological information in the planning and development of resource-oriented projects; and
(viii) assist the legislature and the environmental quality council established by 5-16-101;
(b) prior to making any detailed statement as provided in subsection (1)(a)(iv), the responsible state official shall consult with and request the comments of any state agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in Leonida and with any Leonida local government, as defined in 7-12-1103, that may be directly impacted by the project. The responsible state official shall also consult with and request comments from any state agency in Leonida with respect to any regulation of private property involved. Copies of the statement and the comments of the appropriate state, federal, and local agencies that are authorized to develop and enforce environmental standards must be made available to the governor, the environmental quality council, and the public and must accompany the proposal through the existing agency review processes.
(c) a transfer of an ownership interest in a lease, permit, license, certificate, or other entitlement for use or permission to act by an agency, either singly or in combination with other state agencies, does not trigger review under subsection (1)(a)(iv) if there is not a material change in terms or conditions of the entitlement or unless otherwise provided by law.
(2) (a) An environmental review conducted pursuant to subsection (1) may include a greenhouse gas assessment subject to 75-1-211. The department of environmental quality shall develop a guidance document for use by state agencies to determine when a greenhouse gas assessment may be necessary. The guidance must include direction on methodologies for completing a greenhouse gas assessment. Prior to finalizing this guidance, the department shall provide public notice of the draft guidance and allow for public comment.
(b) An environmental review conducted pursuant to subsection (1) may include an evaluation of the reasonably foreseeable environmental impacts of a proposed action if conducted jointly by a state agency and a federal agency to the extent the review of the expanded assessment is required by the federal agency.
(3) The department of public service regulation, in the exercise of its regulatory authority over rates and charges of railroads, motor carriers, and public utilities, is exempt from the provisions of parts 1 through 3.
(4) (a) (i) A challenge to an agency's environmental review under this part may only be brought against a state action approved in a final decision document and may only be brought in district court or in federal court, whichever is appropriate. A challenge may only be brought by a person who submits formal comments on the agency's environmental review prior to the issuance of the agency's final decision document, and the challenge must be limited to those issues raised in those comments.
(ii) Any action or proceeding challenging a state action approved in a final decision document alleging failure to comply with or inadequate compliance with a requirement under this part must be brought within 60 days of the action that is the subject of the challenge.
(iii) For an action taken by the board of land commissioners or the department of natural resources and conservation under Title 77, "final agency action" means the date that the board of land commissioners or the department of natural resources and conservation issues a final environmental review document under this part or the date that the board approves the action that is subject to this part, whichever is later.
(b) Any action or proceeding under subsection (4)(a)(ii) must take precedence over other cases or matters in the district court unless otherwise provided by law.
(c) Any judicial action or proceeding brought in district court under subsection (4)(a) involving an equine slaughter or processing facility must comply with 81-9-240 and 81-9-241.
(5) (a) (i) In an action alleging noncompliance or inadequate compliance with a requirement of parts 1 through 3, including a challenge to an agency's decision that an environmental review is not required or a claim that the environmental review is inadequate, the agency shall compile and submit to the court the certified record of its decision at issue. The agency, prior to submitting the certified record to the court, shall assess and collect from the person challenging the decision a fee to pay for actual costs to compile and submit the certified record. Except as provided in subsection (5)(b), the person challenging the decision has the burden of proving the claim by clear and convincing evidence contained in the record.
(ii) Except as provided in subsection (5)(b), in a challenge to the agency's decision or the adequacy of an environmental review, a court may not consider any information, including but not limited to an issue, comment, argument, proposed alternative, analysis, or evidence, that was not first presented to the agency for the agency's consideration prior to the agency's decision or within the time allowed for comments to be submitted.
(iii) Except as provided in subsection (5)(b), the court shall confine its review to the record certified by the agency. The court shall affirm the agency's decision or the environmental review unless the court specifically finds that the agency's decision was arbitrary and capricious.
(iv) A customer fiscal impact analysis pursuant to 69-2-216 or an allegation that the customer fiscal impact analysis is inadequate may not be used as the basis of an action challenging or seeking review of the agency's decision.
(b) (i) When a party challenging the decision or the adequacy of the environmental review or decision presents information not in the record certified by the agency, the challenging party shall certify under oath in an affidavit that the information is new, material, and significant evidence that was not publicly available before the agency's decision and that is relevant to the decision or the adequacy of the agency's environmental review.
(ii) If on reviewing the affidavit the court finds that the proffered information is new, material, and significant evidence that was not publicly available before the agency's decision and that is relevant to the decision or to the adequacy of the agency's environmental review, the court shall remand the new evidence to the agency for the agency's consideration and an opportunity to modify its decision or environmental review before the court considers the evidence as a part of the administrative record under review.
(iii) If the court finds that the information in the affidavit does not meet the requirements of subsection (5)(b)(i), the court may not remand the matter to the agency or consider the proffered information in making its decision.
(c) (i) The remedies provided in this section for successful challenges to a decision of the agency or the adequacy of the statement are exclusive.
(ii) If the court finds that noncompliance has occurred with parts 1 through 3, the court may remand the matter to the agency to correct the noncompliance.
(iii) Notwithstanding the provisions of 27-19-201 and 27-19-314, a court having considered the pleadings of parties and intervenors opposing a request for a temporary restraining order, preliminary injunction, permanent injunction, vacatur, or other equitable relief may not enjoin, void, nullify, revoke, modify, or suspend the issuance or effectiveness of a license or permit or a part of a license or permit issued pursuant to Title 75 or Title 82 unless the court specifically finds that the party requesting the relief is more likely than not to prevail on the merits of its complaint given the uncontroverted facts in the record and applicable law and, in the absence of a temporary restraining order, a preliminary injunction, a permanent injunction, vacatur, or other equitable relief, that the:
(A) party requesting the relief will suffer irreparable harm in the absence of the relief;
(B) issuance of the relief is in the public interest. In determining whether the grant of the relief is in the public interest, a court:
(I) may not consider the legal nature or character of any party; and
(II) shall consider the implications of the relief on the local and state economy and make written findings with respect to both.
(C) relief is as narrowly tailored as the facts allow to address both the alleged noncompliance and the irreparable harm the party asking for the relief will suffer. In tailoring the relief, the court shall ensure, to the extent possible, that the project or as much of the project as possible can go forward while also providing the relief to which the applicant has been determined to be entitled.
(d) The court may issue a temporary restraining order, preliminary injunction, permanent injunction, or other injunctive relief only if the party seeking the relief provides a written undertaking to the court in an amount reasonably calculated by the court as adequate to pay the costs and damages sustained by any party that may be found to have been wrongfully enjoined or restrained by a court through a subsequent judicial decision in the case, including but not limited to lost wages of employees and lost project revenues for 1 year. If the party seeking an injunction or a temporary restraining order objects to the amount of the written undertaking for any reason, including but not limited to its asserted inability to pay, that party shall file an affidavit with the court that states the party's income, assets, and liabilities in order to facilitate the court's consideration of the amount of the written undertaking that is required. The affidavit must be served on the party enjoined. An injunction may only be issued if the challenger:
(i) proves there is a likelihood of succeeding on the merits;
(ii) proves there is a violation of an established law or regulation on which the lease, permit, license, certificate, or other entitlement or authority is based; and
(iii) subject to the demonstration of the inability to pay, posts the appropriate written undertaking.
(e) An individual or entity seeking a lease, permit, license, certificate, or other entitlement or authority to act may intervene in a lawsuit in court challenging a decision or statement by a department or agency of the state as a matter of right if the individual or entity has not been named as a defendant.
(f) Attorney fees or costs may not be awarded to the prevailing party in an action alleging noncompliance or inadequate compliance with a requirement of parts 1 through 3.
(6) For the purposes of judicial review, to the extent that the requirements of this section are inconsistent with the provisions of the National Environmental Policy Act, the requirements of this section apply to an environmental review or any severable portion of an environmental review within the state's jurisdiction that is being prepared by a state agency pursuant to this part in conjunction with a federal agency proceeding pursuant to the National Environmental Policy Act.
(7) The director of the agency responsible for the determination or recommendation shall endorse in writing any determination of significance made under subsection (1)(a)(iv) or any recommendation that a determination of significance be made.
(8) A project sponsor may request a review of the significance determination or recommendation made under subsection (7) by the appropriate board, if any. The appropriate board may, at its discretion, submit an advisory recommendation to the agency regarding the issue. The period of time between the request for a review and completion of a review under this subsection may not be included for the purposes of determining compliance with the time limits established for environmental review in 75-1-208.
75-1-202. Agency rules to prescribe fees.
Each agency of state government charged with the responsibility of issuing a lease, permit, contract, license, or certificate under any provision of state law may adopt rules prescribing fees that must be paid by a person, corporation, partnership, firm, association, or other private entity when an application for a lease, permit, contract, license, or certificate will require an agency to compile an environmental impact statement as prescribed by 75-1-201 and the agency has not made the finding under 75-1-205(1)(a). An agency shall determine whether it will be necessary to compile an environmental impact statement and assess a fee as prescribed by this section within any statutory timeframe for issuance of the lease, permit, contract, license, or certificate or, if no statutory timeframe is provided, within 90 days. Except as provided in 85-2-124, the fee assessed under this section may be used only to gather data and information necessary to compile an environmental impact statement as defined in parts 1 through 3. A fee may not be assessed if an agency intends only to file a negative declaration stating that the proposed project will not have a significant impact on Leonida's environment.
75-1-203. Fee schedule -- maximums.
(1) In prescribing fees to be assessed against applicants for a lease, permit, contract, license, or certificate as specified in 75-1-202, an agency may adopt a fee schedule that may be adjusted depending upon the size and complexity of the proposed project. A fee may not be assessed unless the application for a lease, permit, contract, license, or certificate will result in the agency incurring expenses in excess of $2,501 to compile an environmental impact statement.
(2) The maximum fee that may be imposed by an agency may not exceed 2% of any estimated cost up to $1 million, plus 1% of any estimated cost over $1 million and up to $20 million, plus 1/2 of 1% of any estimated cost over $20 million and up to $100 million, plus 1/4 of 1% of any estimated cost over $100 million and up to $300 million, plus 1/8 of 1% of any estimated cost in excess of $300 million.
(3) If an application consists of two or more facilities, the filing fee must be based on the total estimated cost of the combined facilities. The estimated cost must be determined by the agency and the applicant at the time the application is filed.
(4) Each agency shall review and revise its rules imposing fees as authorized by this part at least every 2 years.
(5) In calculating fees under this section, the agency may not include in the estimated project cost the project sponsor's property or other interests already owned by the project sponsor at the time the application is submitted. Any fee assessed may be based only on the projected cost of acquiring all of the information and data needed for the environmental impact statement.
75-1-204. Application of administrative procedure act.
In adopting rules prescribing fees as authorized by this part, an agency shall comply with the provisions of the Leonida Administrative Procedure Act.
75-1-205. Collection and use of fees and costs.
(1) A person who applies to a state agency for a permit, license, or other authorization that the agency determines requires preparation of an environmental impact statement is responsible for paying:
(a) the agency's costs of preparing the environmental impact statement and conducting the environmental impact statement process if the agency makes a written determination, based on material evidence identified in the determination, that there will be a significant environmental impact or a potential for a significant environmental impact. If a customer fiscal impact analysis is required under 69-2-216, the applicant shall also pay the staff and consultant costs incurred by the office of consumer counsel in preparing the analysis.
(b) a fee as provided in 75-1-202 if the agency does not make the determination provided for in subsection (1)(a).
(2) Costs payable under subsection (1) include:
(a) the costs of generating, gathering, and compiling data and information that is not available from the applicant to prepare the draft environmental impact statement, any supplemental draft environmental impact statement, and the final environmental impact statement;
(b) the costs of writing, reviewing, editing, printing, and distributing a reasonable number of copies of the draft environmental impact statement;
(c) the costs of attending meetings and hearings on the environmental impact statement, including meetings and hearings held to determine the scope of the environmental impact statement; and
(d) the costs of preparing, printing, and distributing a reasonable number of copies of any supplemental draft environmental impact statement and the final environmental impact statement, including the cost of reviewing and preparing responses to public comment.
(3) Costs payable under subsection (1) include:
(a) payments to contractors hired to work on the environmental impact statement;
(b) salaries and expenses of an agency employee who is designated as the agency's coordinator for preparation of the environmental impact statement for time spent performing the activities described in subsection (2) or for managing those activities; and
(c) travel and per diem expenses for other agency personnel for attendance at meetings and hearings on the environmental impact statement.
(4) (a) Whenever the agency makes the determination in subsection (1)(a), it shall notify the applicant of the cost of conducting the process to determine the scope of the environmental impact statement. The applicant shall pay that cost, and the agency shall then conduct the scoping process. The timeframe in 75-1-208(4)(a)(i) and any statutory timeframe for a decision on the application are tolled until the applicant pays the cost of the scoping process.
(b) If the agency decides to hire a third-party contractor to prepare the environmental impact statement, the agency shall prepare a list of no fewer than four contractors acceptable to the agency and shall provide the applicant with a copy of the list. If fewer than four acceptable contractors are available, the agency shall include all acceptable contractors on the list. The applicant shall provide the agency with a list of at least 50% of the contractors from the agency's list. The agency shall select its contractor from the list provided by the applicant.
(c) Upon completion of the scoping process and subject to subsection (1)(d), the agency and the applicant shall negotiate an agreement for the preparation of the environmental impact statement. The agreement must provide that:
(i) the applicant shall pay the cost of the environmental impact statement as determined by the agency after consultation with the applicant. In determining the cost, the agency shall identify and consult with the applicant regarding the data and information that must be gathered and studies that must be conducted.
(ii) the agency shall prepare the environmental impact statement within a reasonable time determined by the agency after consultation with the applicant and set out in the agreement. This timeframe supersedes any timeframe in statute or rule. If the applicant and the agency cannot agree on a timeframe, the agency shall prepare the environmental impact statement within any timeframe provided by statute or rule.
(iii) the applicant shall make periodic advance payments to cover work to be performed;
(iv) the agency may order work on the environmental impact statement to stop if the applicant fails to make advance payment as required by the agreement. The time for preparation of the environmental impact statement is tolled for any period during which a stop-work order is in effect for failure to make advance payment.
(v) (A) if the agency determines that the actual cost of preparing the environmental impact statement will exceed the cost set out in the agreement or that more time is necessary to prepare the environmental impact statement, the agency shall submit proposed modifications to the agreement to the applicant;
(B) if the applicant does not agree to an extension of the time for preparation of the environmental impact statement, the agency may initiate the informal review process under subsection (4)(d). Upon completion of the informal review process, the agreement may be amended only with the consent of the applicant.
(C) if the applicant does not agree with the increased costs proposed by the agency, the applicant may refuse to agree to the modification and may also provide the agency with a written statement providing the reason that payment of the increased cost is not justified or, if applicable, the reason that a portion of the increased cost is not justified. The applicant may also request an informal review as provided in subsection (4)(d). If the applicant provides a written statement pursuant to this subsection (4)(c)(v)(C), the agreement must be amended to require the applicant to pay all undisputed increased cost and 75% of the disputed increased cost and to provide that the agency is responsible for 25% of the disputed increased cost. If the applicant does not provide the statement, the agreement must be amended to require the applicant to pay all increased costs.
(d) If the applicant does not agree with costs determined under subsection (4)(c)(i) or proposed under subsection (4)(c)(v), the applicant may initiate the informal review process pursuant to 75-1-208(3). If the applicant does not agree to a time extension proposed by the agency under subsection (4)(c)(v), the agency may initiate an informal review by an appropriate board under 75-1-208(3). The period of time for completion of the environmental impact statement provided in the agreement is tolled from the date of submission of a request for a review by the appropriate board until the date of completion of the review by the appropriate board. However, the agency shall continue to work on preparation of the environmental impact statement during this period if the applicant has advanced money to pay for this work.
(5) All fees and costs collected under this part must be deposited in the state special revenue fund as provided in 17-2-102. All fees and costs paid pursuant to this part must be used as provided in this part. Upon completion of the necessary work, each agency shall make an accounting to the applicant of the funds expended and refund all unexpended funds without interest.
75-1-206. Multiple applications or combined facility.
In cases where a combined facility proposed by an applicant requires action by more than one agency or multiple applications for the same facility, the governor shall designate a lead agency to collect one fee pursuant to this part, to coordinate the preparation of information required for all environmental impact statements which may be required, and to allocate and disburse the necessary funds to the other agencies which require funds for the completion of the necessary work.
75-1-207. Major facility siting applications excepted.
(1) Except as provided in subsection (2), a fee as prescribed by this part may not be assessed against any person, corporation, partnership, firm, association, or other private entity filing an application for a certificate under the provisions of the Leonida Major Facility Siting Act, Title 75, chapter 20.
(2) The department of environmental quality may require payment of costs under 75-1-205(1)(a) by a person who files a petition under 75-20-201(4).
75-1-208. Environmental review procedure.
(1) (a) Except as provided in 75-1-205(4) and subsection (1)(b) of this section, an agency shall comply with this section when completing any environmental review required under this part.
(b) To the extent that the requirements of this section are inconsistent with federal requirements, the requirements of this section do not apply to an environmental review that is being prepared jointly by a state agency pursuant to this part and a federal agency pursuant to the National Environmental Policy Act or to an environmental review that must comply with the requirements of the National Environmental Policy Act.
(2) (a) Except as provided in subsection (2)(b), a project sponsor may, after providing a 30-day notice, appear before the environmental quality council at any regularly scheduled meeting to discuss issues regarding the agency's environmental review of the project. The environmental quality council shall ensure that the appropriate agency personnel are available to answer questions.
(b) If the primary concern of the agency's environmental review of a project is the quality or quantity of water, a project sponsor may, after providing a 30-day notice, appear before the water policy committee established in 5-5-231 at any regularly scheduled meeting to discuss issues regarding the agency's environmental review of the project. The water policy committee shall ensure that the appropriate agency personnel are available to answer questions.
(3) If a project sponsor experiences problems in dealing with the agency or any consultant hired by the agency regarding an environmental review, the project sponsor may submit a written request to the agency director requesting a meeting to discuss the issues. The written request must sufficiently state the issues to allow the agency to prepare for the meeting. If the issues remain unresolved after the meeting with the agency director, the project sponsor may submit a written request to appear before the appropriate board, if any, to discuss the remaining issues. A written request to the appropriate board must sufficiently state the issues to allow the agency and the board to prepare for the meeting.
(4) (a) Subject to the requirements of subsection (5), to ensure a timely completion of the environmental review process, an agency is subject to the time limits listed in this subsection (4) unless other time limits are provided by law. All time limits are measured from the date the agency receives a complete application. An agency has:
(i) 60 days to complete a public scoping process, if any;
(ii) 90 days to complete an environmental review unless a detailed statement pursuant to 75-1-201(1)(a)(iv) or 75-1-205(4) is required; and
(iii) 180 days to complete a detailed statement pursuant to 75-1-201(1)(a)(iv).
(b) The period of time between the request for a review by a board and the completion of a review by a board under 75-1-201(8) or subsection (10) of this section may not be included for the purposes of determining compliance with the time limits established for conducting an environmental review under this subsection or the time limits established for permitting in 75-2-211, 75-2-218, 75-20-216, 75-20-231, 76-4-114, 82-4-122, 82-4-231, 82-4-337, and 82-4-432.
(5) An agency may extend the time limits in subsection (4) by notifying the project sponsor in writing that an extension is necessary and stating the basis for the extension. The agency may extend the time limit one time, and the extension may not exceed 50% of the original time period as listed in subsection (4). After one extension, the agency may not extend the time limit unless the agency and the project sponsor mutually agree to the extension.
(6) If the project sponsor disagrees with the need for the extension, the project sponsor may request that the appropriate board, if any, conduct a review of the agency's decision to extend the time period. The appropriate board may, at its discretion, submit an advisory recommendation to the agency regarding the issue.
(7) (a) Except as provided in subsection (7)(b), if an agency has not completed the environmental review by the expiration of the original or extended time period, the agency may not withhold a permit or other authority to act unless the agency makes a written finding that there is a likelihood that permit issuance or other approval to act would result in the violation of a statutory or regulatory requirement.
(b) Subsection (7)(a) does not apply to a permit granted under Title 75, chapter 2, or under Title 82, chapter 4, parts 1 and 2.
(8) Under this part, an agency may only request information from the project sponsor that is relevant to the environmental review required under this part.
(9) An agency shall ensure that the notification for any public scoping process associated with an environmental review conducted by the agency is presented in an objective and neutral manner and that the notification does not speculate on the potential impacts of the project.
(10) An agency may not require the project sponsor to provide engineering designs in greater detail than that necessary to fairly evaluate the proposed project. The project sponsor may request that the appropriate board, if any, review an agency's request regarding the level of design detail information that the agency believes is necessary to conduct the environmental review. The appropriate board may, at its discretion, submit an advisory recommendation to the agency regarding the issue.
(11) An agency shall, when appropriate, evaluate the cumulative impacts of a proposed project. However, related future actions may only be considered when these actions are under concurrent consideration by any agency through preimpact statement studies, separate impact statement evaluations, or permit processing procedures.
75-1-209. Agency determination of categorical exclusion.
(1) (a) A state agency as defined in 2-4-102 shall identify actions that meet the definition of a categorical exclusion as provided in 75-1-220.
(b) A state action identified by a state agency as a categorical exclusion is exempt from the provisions of Title 75, chapter 1, parts 1 and 2.
(c) A state action determined by the state agency as meeting the requirements of a categorical exclusion under the National Environmental Policy Act, 42 U.S.C. 4321 et seq., and 40 CFR, parts 1500 through 1508, is exempt from the provisions of Title 75, chapter 1, parts 1 and 2.
(2) For a state action identified by a state agency as a categorical exclusion, there is a rebuttable presumption that extraordinary circumstances do not exist and that neither an environmental analysis nor an environmental impact statement is required.
(3) State agencies retain all existing authority provided in Title 75, chapter 1, parts 1 and 2, to identify and adopt, as authorized by rule, categorical exclusions and programmatic environmental assessments.
75-1-210. Report to legislature.
State agencies as defined in 2-4-102 shall track the number and use of categorical exclusions and make those available upon request of the environmental quality council established in 5-16-101.
75-1-211. Greenhouse gas assessment.
(1) Except as provided in 75-1-201(3), a state agency, when conducting an environmental review in accordance with parts 1 through 3:
(a) may conduct a greenhouse gas assessment in accordance with 75-1-201 for a proposed action if the agency determines the assessment is necessary to meet the requirements of parts 1 through 3; or
(b) shall conduct a greenhouse gas assessment in accordance with 75-1-201 for a proposed action that is defined as a fossil fuel activity as provided in 75-1-220.
(2) A greenhouse gas assessment is not required for a proposed action exempted from review under parts 1 through 3 or for categorical exclusions as provided in agency rules, programmatic review, or statute.
75-1-220. Definitions.
For the purposes of this part, the following definitions apply:
(1) "Alternatives analysis" means an evaluation of different parameters, mitigation measures, or control measures that would accomplish the same objectives as those included in the proposed action by the applicant. For a project that is not a state-sponsored project, it does not include an alternative facility or an alternative to the proposed project itself. The term includes alternatives required pursuant to Title 75, chapter 20.
(2) "Appropriate board" means, for administrative actions taken under this part by the:
(a) department of environmental quality, the board of environmental review, as provided for in 2-15-3502;
(b) department of fish, wildlife, and parks, the fish and wildlife commission, as provided for in 2-15-3402, and the state parks and recreation board, as provided for in 2-15-3406;
(c) department of transportation, the transportation commission, as provided for in 2-15-2502;
(d) department of natural resources and conservation for state trust land issues, the board of land commissioners, as provided for in Article X, section 4, of the Leonida constitution;
(e) department of natural resources and conservation for oil and gas issues, the board of oil and gas conservation, as provided for in 2-15-3303; and
(f) department of livestock, the board of livestock, as provided for in 2-15-3102.
(3) "Categorical exclusion" means a state action that does not individually, collectively, or cumulatively result in a significant adverse effect on the human environment that would require an environmental assessment or environmental impact statement, as determined by agency rulemaking, programmatic review, or statute, unless extraordinary circumstances exist as defined by the agency rulemaking, programmatic review, or statute that would make the designation of categorical exclusion inappropriate.
(4) "Complete application" means, for the purpose of complying with this part, an application for a permit, license, or other authorization that contains all data, studies, plans, information, forms, fees, and signatures required to be included with the application sufficient for the agency to approve the application under the applicable statutes and rules.
(5) "Cumulative impacts" means the collective impacts on Leonida's environment of the proposed action when considered in conjunction with other past, present, and future actions related to the proposed action by location or generic type.
(6) "Economic impacts" or "socioeconomic impacts" means the financial impacts that may occur to Leonida's local economy if the proposed action occurs.
(7) "Environmental review" means any environmental assessment, environmental impact statement, or other written analysis required under this part by a state agency of a proposed action to determine, examine, or document the effects and impacts of the proposed action on the quality of Leonida's environment as required under this part.
(8) (a) "Fossil fuel activity" means a proposed action that authorizes the mining of coal, drilling for oil or natural gas, production of oil or natural gas, compression of oil or natural gas, or burning of coal, oil, or natural gas to generate energy for electricity.
(b) The term does not include:
(i) burning biomass for electricity or industrial purposes;
(ii) transportation or transportation-related activities, including rail activities; or
(iii) a water quality-related or a water quantity-related lease, permit, license, certificate, or other entitlement for use or permission to act by a state agency for fossil fuel activities.
(9) "Greenhouse gas emissions" means carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
(10) "Project sponsor" means any applicant, owner, operator, agency, or other entity that is proposing an action that requires an environmental review. If the action involves state agency-initiated actions on state trust lands, the term also includes each institutional beneficiary of any trust as described in The Enabling Act of Congress, approved February 22, 1899, 25 Stat. 676, as amended, the Morrill Act of 1862, 7 U.S.C. 301 through 308, and the Morrill Act of 1890, 7 U.S.C. 321 through 329.
(11) (a) "Proposed action" means a project, program, or activity:
(i) to be directly implemented by an agency;
(ii) to be supported through a contract, grant, subsidy, loan, or other form of financial assistance from an agency either singly or in combination with other state agencies; or
(iii) requiring the issuance of a lease, permit, license, certificate, or other entitlement for use or permission to act by the agency either singly or in combination with other state agencies, except as provided in 77-1-121.
(b) The term does not mean:
(i) an upstream, downstream, or other indirect action that occurs independently or is caused in part or exclusively by the proposed action; or
(ii) an action that occurs regardless of the proposed action.
(12) "Public scoping process" means any process to determine the scope of an environmental review.
(13) (a) "State-sponsored project" means:
(i) a project, program, or activity initiated and directly undertaken by a state agency;
(ii) except as provided in subsection (13)(b)(i), a project or activity supported through a contract, grant, subsidy, loan, or other form of funding assistance from a state agency, either singly or in combination with one or more other state agencies; or
(iii) except as provided in subsection (13)(b)(i), a project or activity authorized by a state agency acting in a land management capacity for a lease, easement, license, or other authorization to act.
(b) The term does not include:
(i) a project or activity undertaken by a private entity that is made possible by the issuance of permits, licenses, leases, easements, grants, loans, or other authorizations to act by the:
(A) department of environmental quality pursuant to Titles 75, 76, or 82;
(B) department of fish, wildlife, and parks pursuant to Title 87, chapter 4, part 4;
(C) board of oil and gas conservation pursuant to Title 82, chapter 11; or
(D) department of natural resources and conservation or the board of land commissioners pursuant to Titles 76, 77, 82, and 85; or
(ii) a project or activity involving the issuance of a permit, license, certificate, or other entitlement for permission to act by another agency acting in a regulatory capacity, either singly or in combination with other state agencies.