60-2-106. Designation of highways not located entirely within the state.
The commission may designate highways subject to improvement under the provisions of Title 23, U.S.C., even though those highways are not located entirely and continuously within the boundaries of the state. The designations shall meet the following conditions:
(1) the highway is on an approved federal-aid route and eligible for improvement under Title 23, U.S.C.;
(2) the location of a portion of the route outside the boundaries of the state is necessary because of natural geographical or physical conditions which make the construction of the highway within the state impossible or impracticable;
(3) the portion of the route located outside the state does not connect with and is not a part of the state highway system of the adjoining state.
60-2-107. Abandonment of highways -- discontinuance of maintenance -- exchange of roadways -- public notice required.
(1) The commission may abandon highways on the commission-designated highway systems and state highways pursuant to 60-4-212.
(2) Before abandoning or discontinuing maintenance on a highway, the commission shall hold a public hearing in the county or counties affected by the abandonment. The commission may elect to offer to transfer the liability for and the maintenance of a highway to another agency or agencies that may in turn elect to take responsibility for the highway. The commission shall notify the board of county commissioners and the governing body of any municipality affected by the abandonment in writing of its intent to abandon a highway and hold a public hearing. The commission shall publish for 3 consecutive weeks in local newspapers within the county the notice of abandonment and public hearing.
(3) The commission may enter into an agreement with a unit of local government, on mutually beneficial terms, to exchange property interests or responsibilities, including maintenance, on any portion of a commission-designated highway system or state highway and on any portion of a county road or city street.
(4) The commission may not abandon a highway, road, or right-of-way used to provide existing legal access to public land or waters, including access for public recreational use as defined in 23-2-301 and as permitted in 23-2-302, unless another highway, road, or right-of-way provides substantially the same access.
(5) The commission may not abandon a highway, road, or right-of-way used to access private land if the access benefits two or more landowners unless all the landowners agree to the abandonment.
60-2-110. Setting priorities and selecting projects.
(1) Except as provided in 60-2-133, the commission shall establish priorities and select and designate segments for construction and reconstruction on the national highway system, the primary highway system, the secondary highway system, the urban highway system, and state highways.
(2) The commission shall consult with the board of county commissioners of the county in which a highway is located when establishing priorities and when selecting and designating segments on the secondary highway system for construction and reconstruction.
(3) The commission shall consult with the appropriate local government authorities when establishing priorities and selecting and designating segments on the urban highway system for construction and reconstruction.
(4) The commission shall use information gathered or discovered by and documents prepared by the department, and department officials and employees shall provide assistance and advice.
(5) The commission shall establish and determine priorities and projects for rail and transit programs and, to the extent possible, coordinate intermodal transportation within the state.
(6) In carrying out the requirements of this section, the department shall:
(a) make recommendations to the commission;
(b) establish the requirements and procedures for administering this section; and
(c) take all reasonable steps to ensure the integrity and viability of agricultural and rural transportation and related needs.
60-2-111. Letting of contracts on state highways and commission-designated highway systems.
(1) Except as provided in subsection (2), all contracts for the construction or reconstruction of the highways located on commission-designated highway systems and state highways, including portions in cities and towns, and all contracts entered into under 7-14-4108 must be let by the commission. Except as otherwise specifically provided, the commission may enter the types of contracts and upon terms that it may decide. All contracts must meet the requirements of Title 18, chapter 2, part 4. When there is no prevailing rate of wages set by collective bargaining, the commission shall determine the prevailing rate to be stated in the contract.
(2) The commission may delegate the authority, with all applicable statutory restrictions, to award any contract covered by this section to the department or to a unit of local government.
(3) The commission may award contracts for projects that the department has determined are part of the design-build contracting program authorized in 60-2-137.
(4) The commission may award contracts using alternative project delivery methods in accordance with 60-2-120.
60-2-112. Competitive bidding -- reciprocity -- definition.
(1) Except as provided in subsections (2) through (6), if the estimated cost of any work exceeds $50,000, the commission shall award the contract by competitive bidding to the lowest responsible and responsive bidder. The award must be made upon the notice and terms that the commission prescribes by its rules. However, except when prohibited by federal law, the commission shall make awards and contracts in accordance with 18-1-102.
(2) The commission may award a contract by means other than competitive bidding if it determines that special circumstances so require. The commission shall specify the special circumstances in writing.
(3) The commission may enter into contracts with units of local government for the construction of projects without competitive bidding if it finds that the work can be accomplished at lower total costs, including total costs of labor, materials, supplies, equipment usage, engineering, supervision, clerical and accounting services, administrative costs, and reasonable estimates of other costs attributable to the project.
(4) The commission may delegate to the department the authority to enter, without competitive bidding, agreed-upon price contracts for projects costing $50,000 or less.
(5) The commission may award a design-build contract under the design-build contracting program if the provisions of 60-2-137 have been met. The commission may also award a contract using an alternative project delivery method under 60-2-120.
(6) The commission or the department may not enter into a contract for a state-funded highway project or a construction project with a bidder whose operations are not headquartered in the United States unless:
(a) the foreign country, or province or other political subdivision of that country, in which the bidder is headquartered affords companies based in the United States open, fair, and nondiscriminatory access to bidding on highway projects and construction projects located in the foreign country, or province or other political subdivision of that country; and
(b) the department has entered into a reciprocity agreement with or has exchanged letters of information with the foreign country, or province or other political subdivision of that country, that addresses:
(i) the equal and fair treatment of bids originating in the United States and in the foreign country, or province or other political subdivision of that country;
(ii) specific ownership requirements and tax policies in the United States and in the foreign country, or province or other political subdivision of that country, that may result in the unequal treatment of all bids received, regardless of their origin;
(iii) the means by which contractors from both the United States and the foreign country, or province or other political subdivision of that country, are notified of highway projects and construction projects available for bid; and
(iv) any other differences in public policy or procedure that may result in the unequal treatment of bids originating in the United States or in the foreign country, or province or other political subdivision of that country, for projects located in either the United States or the foreign country, or province or other political subdivision of that country.
(7) As used in subsection (6), "construction" has the meaning provided in 18-2-101.
60-2-113. Bidder's security -- contractor's bond.
(1) (a) Subject to subsection (1)(b), whenever the commission calls for competitive bidding, each bidder shall meet all requirements of Title 18, chapter 1, part 2.
(b) The commission may accept electronic bid bonds signed electronically or otherwise verified by the bidder and the surety.
(2) Each contractor awarded a contract by the commission shall meet all requirements set forth in Title 18, chapter 2, part 2. A contract is not considered to be completed until the commission, while formally convened, affirmatively accepts all of the work specified in the contract.
60-2-114. Bids for contracts let by commission to contain security, unit price, and signature.
Each bid communicated to the commission in response to a request for bids required by this part must comply with the unit price and signature requirements of 18-2-303 and the bid security requirements of 60-2-113 in order for the bid to be accepted.
60-2-115. Contract let by commission -- time for final payment of contract price -- interest -- definitions.
(1) Subject to subsections (2) through (4), the department shall comply with the 30-day time period for payment of contracts as provided in 18-2-306 for all contracts let by the commission in accordance with this part.
(2) For the final payment on a contract, the department shall, within 30 days after a request by the contractor for final acceptance, perform an inspection of the project and notify the contractor of whether the department has granted or refused final acceptance.
(3) If the department notifies the contractor that the department has granted final acceptance, the department shall make the final payment of the contract price specified in the contract to the other party to the contract within 90 days after the notice.
(4) (a) If the department notifies the contractor that the department has refused final acceptance, the department shall include with the notice a list of all deficiencies that must be cured before the department will grant final acceptance.
(b) After the contractor has cured all of the deficiencies, the contractor shall request final acceptance by the department. Within 30 days after the contractor's request, the department shall perform an inspection of all of the cured deficiencies.
(c) If the department notifies the contractor of its final acceptance, the department shall make the final payment as provided in subsection (3).
(d) If the department notifies the contractor that the department has refused final acceptance, the department shall:
(i) notify the contractor of any remaining deficiencies; and
(ii) grant final acceptance, subject to any remedy provided under the provisions of Title 28, chapter 2.
(5) When the department grants final acceptance, the department shall immediately consider the contract complete and close the contract.
(6) As used in this section, the following definitions apply:
(a) "Final acceptance" means the department's acceptance of the construction, maintenance, or public works project upon certification by the architect, project engineer, or other representative of the department of final completion of the project.
(b) "Final completion" means that the project has been completed in accordance with the terms and conditions of the contract documents and all warranties have expired.
60-2-116. Payment of contractors and subcontractors.
Unless prohibited by federal law, payment under this part of a contractor or subcontractor for services performed by the contractor or subcontractor is governed by the provisions of Title 28, chapter 2, part 21.
60-2-117. Contract indemnification provisions -- definition.
(1) Except as provided in subsections (2) and (3), a contract subject to the provisions of this part with a provision that requires one party to the contract to indemnify, hold harmless, insure, or defend the other party to the contract or the other party's officers, employees, or agents for liability, damages, losses, or costs that are caused by the negligence, recklessness, or intentional misconduct of the other party or the other party's officers, employees, or agents is void as against the public policy of this state.
(2) A contract subject to the provisions of this part may contain a provision:
(a) requiring one party to the contract to indemnify, hold harmless, or insure the other party to the contract or the other party's officers, employees, or agents for liability, damages, losses, or costs, including but not limited to reasonable attorney fees, only to the extent that the liability, damages, losses, or costs are caused by the negligence, recklessness, or intentional misconduct of a third party or of the indemnifying party or the indemnifying party's officers, employees, or agents; or
(b) requiring a party to the contract to purchase a project-specific insurance policy, including but not limited to an owner's and contractor's protective insurance, a project management protective liability insurance, or a builder's risk insurance.
(3) This section does not apply to indemnity of a surety by a principal on a contract bond or to an insurer's obligation to its insureds.
(4) As used in this section, "contract" means, with respect to highway construction, an agreement for architectural services, alterations, construction, demolition, design services, development, engineering services, excavation, maintenance, repair, or other improvement to real property, including an agreement to supply labor, materials, or equipment for an improvement to real property.
60-2-120. Alternative project delivery.
(1) The commission may use alternative project delivery methods for letting contracts.
(2) Once the commission, acting on a recommendation of the department, identifies a project for which an alternative project delivery method will be used and approves selection criteria proposed by the department, the department shall prepare and advertise a request for qualifications.
(3) From the responders, the department shall prepare a short list of the highest scoring responders, not to exceed five responders on any single project.
(4) The department shall announce the short list and issue a request for proposals inviting each responder on the short list to submit a technical and price proposal to the department.
(5) The department shall evaluate the technical and price proposals and present to the commission the department's written recommendation to award the contract.
60-2-121. Authority of commission to prioritize expenditures on railroad crossings -- public hearing.
(1) The commission shall adopt rules to prioritize the expenditure of funds on railroad crossings.
(2) If requested by the board of county commissioners of any county, the commission shall conduct a public hearing in the affected county on the priority assigned any railroad crossing, and based on the evidence presented at the public hearing, the commission may revise the priority of the railroad crossing.
60-2-126. Designation of public highways -- apportionment of funds.
(1) For the purpose of apportioning state and federal-aid highway funds, the commission shall designate the public highways and streets to be placed on the following systems:
(a) the national highway system;
(b) the primary highway system;
(c) the secondary highway system; or
(d) the urban highway system.
(2) The commission shall consult with the board of county commissioners of the county in which a highway is located prior to designating a public highway to be placed on the secondary highway system.
(3) The commission shall consult with the appropriate local government authorities prior to designating a highway or street to be placed on the urban highway system.
(4) The commission may designate public highways not placed on the systems listed in subsection (1) as state highways.
60-2-127. Allocation of funds for projects.
(1) Each year, out of federal-aid highway funds available for construction purposes, the commission shall allocate a portion of the funds for projects located on:
(a) the national highway system;
(b) the primary highway system;
(c) the secondary highway system;
(d) the urban highway system; and
(e) state highways.
(2) In making allocations under subsection (1), the commission shall comply with all applicable provisions relating to the use of federal-aid highway funds contained in Title 23, U.S.C.
(3) Notwithstanding the allocations made available to the secondary and urban highway systems in subsection (1), the commission may, with the concurrence of the appropriate local officials, authorize the use of federal-aid highway funds allocated under subsections (1)(c) and (1)(d) for any project eligible under 23 U.S.C. 133(b) relative to the surface transportation program.
(4) The commission may enter into an agreement with a city, county, or consolidated city-county government, under terms and conditions that the commission determines necessary, to allow the city, county, or consolidated city-county government recipient of urban funds apportioned under 60-3-211 to dedicate all or a portion of the urban fund apportionment to the retirement of the bonds authorized by 7-7-110.
60-2-128. Maintenance system -- designation of highways.
The commission shall designate the public highways that are to be included on the state maintenance system. Except as provided in 60-2-107, the system must include all the highways that the department maintained on July 1, 1976.
60-2-129. Allocation of funds.
(1) The commission may allocate federal-aid highway funds for projects or programs in which all or a portion of the work is on highways that are not located on the highway systems defined in 60-1-103. The allocations must be made without regard to the financial district in which the project or program is located.
(2) The department shall allocate all federal transit administration funds, freight assistance funds, or any funds or grants available by legislative appropriation for the study, design, construction, repair, or improvement of rail or transit intermodal transportation systems.
(3) The commission may authorize the transfer of federal funds between qualified programs, including highway and transit programs.
(4) The commission may delegate commission functions and responsibilities under this section to the department.
60-2-133. U.S. Route 183 -- planning.
The commission may direct the department to plan improvements to U.S. Route 183 in western Leonida, including the Port Gellhorn corridor, to improve safety, tourism, and access. Planning may be included in future fiscal plans.
60-2-134. Definitions.
As used in 18-8-204, 18-8-205, 60-2-111, 60-2-112, 60-2-120, 60-2-137, and this section, the following definitions apply:
(1) (a) "Alternative project delivery method" means a process approved by the commission and recognized by the U.S. department of transportation, federal highway administration, for federal participation under the United States Code and federal regulations.
(b) The term does not include a design-build contract awarded by the commission under 60-2-111(3).
(2) "Design-build contracting" means the process of entering into a single contract between the commission and a design-build contractor in which the design-build contractor agrees to design and build a highway, structure, or facility or any other items required in a request for proposals.
(3) "Design-build contractor" means an individual, partnership, corporation, joint venture, or other legally recognized entity that is appropriately licensed in Leonida and that provides the necessary design and construction services, including contract administration.
(4) "Design-build or alternative project delivery criteria package" means the document provided by the department that contains the information necessary to guide a prospective design-build contractor in the preparation and submission of a proposal for a design-build or alternative project delivery project.
(5) "Request for proposals" means a part of the design-build or alternative project delivery criteria package that contains a detailed scope of work, including design concepts, technical requirements and specifications, the time allowed for design and construction, the department's estimated cost of the project, the deadline for submitting a proposal, the selection criteria, and a copy of the contract.
(6) "Request for qualifications" means a part of the design-build or alternative project delivery criteria package that contains the desired minimum qualifications of the design-build or alternative project delivery contractor, a scope of work statement, the project requirements, the amount of reimbursement that the commission has determined will be paid to prospective contractors who qualify for the short list but are not awarded a contract, if applicable, and the selection criteria that the department will use in compiling the short list of prospective design-build contractors to consider.
60-2-137. Design-build contracting process -- submission of proposals -- department's duties.
(1) Once the commission, acting on a recommendation of the department, has identified a project for which the design-build contracting process will be used and the commission has approved selection criteria proposed by the department, the department shall prepare and advertise a request for qualifications.
(2) From the responders to the request for qualifications, the department shall prepare a short list of the responders that it believes are most qualified, not to exceed five responders on any single project.
(3) (a) The department shall announce the short list and issue a request for proposals to each of the prospective design-build contractors on the short list, who may then submit a technical and price proposal to the department.
(b) A technical and price proposal submitted in response to a request for proposals must contain detailed descriptions of the prospective design-build contractor's approach to designing, constructing, and managing the project in accordance with the design-build criteria package. The technical and price proposal must also include the prospective design-build contractor's conceptual design and construction sequence and schedule and the lump-sum price to complete the project.
(4) The department shall evaluate the technical and price proposals and make a written recommendation to the commission regarding the department's selection of the design-build contractor to be awarded the contract.
(5) The prospective design-build contractors who appeared on the department's short list but are not awarded the contract may be paid a stipend, in an amount determined by the commission, for costs incurred in submitting the response to the department's request for proposals.
60-2-140. Interstate 404 commercial corridor -- planning.
The commission may designate a commercial transportation corridor along Interstate 404 to facilitate freight movement between Port Gellhorn and the Vice City area, improve safety, and support economic development. The department shall publish the designated corridor and include appropriate improvements in future transportation plans.
60-2-141. Use of Leonida-made wooden materials in highway and road projects.
Unless prohibited by federal law, all contracts let by the commission for the construction or reconstruction of the highways located on commission-designated highway systems and state highways, including portions in cities and towns and all contracts entered into under 7-14-4108, must use Leonida-made wooden guardrail posts, fenceposts, signposts, and decking when appropriate and when the cost of wooden materials is less than or equal to the cost of other materials.