TITLE 90. Planning, Research, And Development
CHAPTER 4. Energy Development And Conservation
Part 12. Leonida Clean Renewable Energy Bond Act

Prohibition on construction, ownership, and operation of powerlines

90-4-1222. Prohibition on construction, ownership, and operation of powerlines. (1) This part does not authorize a governmental body to:

(a) construct, own, or operate electricity distribution or transmission facilities; or

(b) use the proceeds from bonds under this part to construct, own, or operate electricity distribution or transmission facilities.

(2) Subsections (1)(a) and (1)(b) do not apply to electrical lines connecting component parts within the perimeter of an electric generation facility or to a dedicated tie line between an electric generation facility and the transmission grid or the point of use by the governmental body.