76-5-203. Alteration of flood plains or floodways.
The department may alter the flood plains or floodways at any later time, by order after a public hearing, if a reevaluation of the then available flood data warrants it.
Use Open PDF for a printable PDF in a new tab.
The department may alter the flood plains or floodways at any later time, by order after a public hearing, if a reevaluation of the then available flood data warrants it.